Loading...
HomeSearchMy WebLinkAboutBLCO-05-19-5760 ReceiptsBLCO-05-19-5760 Receipts (2)BLCO-05-19-5760 Receipts (3)BLCO-05-19-5760 Receipts (4)BLCO-05-19-5760 Receipts (5)Additional CorrespondenceApplicationApplication-AmendedAssessor's DataBLCO-05-19-5760 PermitBLCO-05-19-5760 Permit (2)BLCO-05-19-5760 Permit ApplicationClosed Cell Spray Foam Insulation SpecsCO-9348Code Compliance Research Report - Therman and Moisture ProtectionComm Check-Envelope ComplianceComm Check-LightingComm Check-MechanicalConditions of ApprovalConditions of PermitConditions of Permit-AmendedCorrection Notice 03.06.25Correction Notice 09.29.25Correction Notice 12.20.19Correspondence DocsDouble Layer Wall Install InstructionsElevator CertificateEngineer Report 05.14.19High Strength Bolting Inspection ReportInsulation CertificateObservation of Excavation 09.12.24Owner's Response to Correction LetterPermit CardPlansRevision Worksheet 02.02.24RIF ReceiptRoof Installation GuideSoils Report 07.16.1999State Final Electrical Inspection ReportState Final Electrical Inspection Report 2Statement of AuthorityStatement of Authority-South IncaSubsoil Study for Foundation Design 03.26.19