Loading...
HomeSearchMy WebLinkAboutBLCO-05-24-8693 ReceiptsBLCO-05-24-8693 Receipts (2)BLCO-05-24-8693 Receipts (3)ApplicationAssessor's DataBLCO-05-24-8693 Commercial Permit CardBLCO-05-24-8693 PermitBLCO-05-24-8693 Permit ApplicationComCheck Certificate ReportCompression Strength 1Compression Strength 2Compression Strength 3Compression Strength 4Compression Strength 5Compression Strength 6Compression Strength 7Compression Strength 8Conditions of PermitCorrection Notice 07.24.25Corrections and Conditions of ApprovalField Observation 1Field Observation 2Final Elec Inspection Report - GBC Flex CFire Suppression Documentation_Citadel Flex Building C - Aboveground Test Paper SignedFire Suppression Documentation_Contractor's Material and Test Cert for UG Piping 304 Center Dr 3.11.25Fire Suppression Documentation_Inspection GSFD-2025-0000113Geotechnical Engeering Investigation 08.22.2022GS06693.001F-360 Reinforcing Steel Report 11GS06693.001F-L1 Building C Completion of ServicesMechanical-Gas SchematicReceipt (2) Remaining BalanceRIF ReceiptStructural Steel Inspection Report