Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
03.22.11 NTC letter
05.18.11 Response to NTC letter
06.06.11 TC letter
06.15.11 Referral form
08.03.07 Driveway permit
08.08.13 Calculation of Peak Run off using retional Method
08.08.13 Summary of Precipitation Data
08.12.13 Conditions of approval response
1.0 Application
1.01 Warranty deed
1.02 Adjacent owners & assessor map
1.03 Vicinity map
1.04 Summary report
1.05 Project plans
1.06 Land suitability analysis
1.07 Impact analysis
1.08 Geohazard review
1.09 Potential wetlands and water inspection
1.10 Wildlife and Vegetation assessment
1.11 Report on cultural resources
1.12 Traffic impact study
1.13 Water Quality Control Division
1.14 Storm water management plan
1.15 West divide water conservacy Dist.
1.16 Revised plans
1.17 Application receipt
1.18 Proposed drainage map
1.19 Historic drainage map
2.0 10.02.13 Response from Town of Parachute
2.1 10.08.13 Comments from Chris Hale
2.2 10.08.13 Response from Steve Anthony
3.0 Public notice
4.0 PC Staff Report 09.28.2011
5.0 BOCC Staff Report 11.05.2012
6.0 BOCC Staff Report 11.14.2011
6.01 BOCC Presentation 11.14.2011
7.0 Land Use Change Permit
8.0 Resolution 2011-74
9.0 Resolution 2012-90