HomeSearchMy WebLinkAbout1.0 Application1.01 Preapplication conference summaries1.02 Authorizations1.03 Deeds and Agreements1.04 Project narrative1.05 Impact analysis1.06 Land suitability analysis1.07 Standards narrative1.08 Supplemental Materials Index1.09 Property owner information and maps1.10 Site Plan set1.11 SMF Cultural Report1.12 Emergency Response Plans1.13 Encana Weed Plan Summary_Use w_Submittals (07-2010)1.14 Encana SMF WTF GarCo1.15 Traffic Analysis1.16 Nontrib Ground Water1.17 Quit Claim Deed - Water Rights1.18 Soil_Report South Middle Fork1.19 Geotechnical Report1.20 Encana South Middle Fork 05121.21 Encana Dust Control Plan1.22 Stormwater Mgmt Plan1.23 Figures2.0 BOCC Staff Report 09.10.20123.0 BOCC Staff Report 10.08.20124.0 Correspondence & Conditions5.0 Resolution 20012-896.0 Withdrawal Letter7.0 Plans