Loading...
HomeMy WebLinkAbout5.0 Land Use Change Permit 6.15.12.pdf1111 l a mgliiIr'Ifi 4i4"U��,4i � it 1I III Rrespllor#: 828096 06/1512012 Feels5B qr1 Joan AlborrAR 1 of 4 Roo Fee:f{1.00 Gob Foe 6.B6 GARFIELO COUNTY CO LAND USE CHANGE PERMIT for Daybreak Realty LLC Encana High Mesa PN 30 Telecommunication Tower (Located in the Section 30, Township 7 South Range 95 West of the 6* P.M., Assessor's Parcel No. 2407 - 193 -00 -162 and as more fully described in Resolution No. 2012 -_ ) In accordance with and pursuant to the Garfield County Unified Land Use Resolution of 2008, as amended, and Resolution No. 2012-ti of the Board of County Commissioners of Garfield County, State of Colorado, the following activity is hereby authorized by Land Use Change Permit: Communication Facility Telecommunication Tower — Encana High Mesa P1r =30 (LIPA - 7153) This Land Use Change Permit — Limited Impact Review is issued subject to the conditions contained in Resolution No. 2012 - and set forth in Exhibit "A" and the approved Site Plan, Exhibit "B" (attached hereto) and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Unified Land Use Resolution of 2008, as amended, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. ATTEST: a->rt_,.. rY] t*-r7 erk of the Board GARFIELD COUNTY BOARD OF COUNT i SSIDNERS, GARF[ IJNTY, COLORADO 1- ■III " pliimmusolidomovieiliornol ' U IIi Reception*: 92699s 08!15/21312 133:41:58 Pr Jr ea, s iberloo 2 of 4 Reo Fea.$0.00 Ono Fea.8.00 GRRFIELD COUNTY CO Exhibit A 1. That all representations made by the Applicant in the application, and at the public hearing before the Board of County Commissioners, shall be conditions of approval, unless specifically altered by the Board of County Commissioners; 2. The operation of this facility and any future amendments shall be done in accordance with all applicable Federal, State and Local regulations governing the operation of this type of facility including but not limited to the FAA and FCC. 3. The Applicant shall maintain compliance with the provisions of Section 7 -823 of the Unified Land Use Resolution of 2008 as amended including but not limited to maintenance, abandonment, and Federal Agency compliance. 4, Any area of disturbance shall be re- vegetated during the next growing season after completion of construction. Compliance with long term reclamation plans contained in the Application shall be required. Continued implementation of Encana's noxious weed management plan and integrated vegetation management plans as appropriate for the site shall be required. 5. During the construction phase the Applicant shall provide portable toilets, storm - water /soil erosion management as needed for site disturbance, and shall provide for secure storage and/or daily removal of any trash or refuse from the site. 6. Final engineering plans for the tower shall be provided to the Garfield County Building and Planning Department prior to initiating construction. Construction and installation of any additional communication cabinet buildings shall be properly permitted with the Garfield County Building Department and meet all zoning and related requirements. 7. The proposed construction shall comply with the recommendations of the C'TL Thompson Geotechnical Investigation and including but not limited to concrete recommendations to address potential for soil corrosion. 8. The Applicant shall maintain a current State Storm Water Discharge Permit associated with the Storm Water Management Plan covering the site. Compliance with all Storm Water, Drainage, and Best Management Practices shall be required. 9. Compliance with the general guidelines and recommendations of the Wildlife Sensitive Areas Report (West Water Engineering, 9 /2011) shall be required. 10. A waiver from the requirement for an inspection within two years by the Director of the Building and Planning Department is approved subject to the condition that the site may be inspected upon request by the County. 11, The Applicant's'' raffle Engineer or other qualified professional shall provide an assessment of the private access road confirming its adequacy in terms of width, surfacing, grade, and safety to serve the site for construction and maintenance, prior to issuance of the Land Use Change Permit. ■1111 '� i�IF�i141i LTILliNwiterimciti Ai 11111 RecepptlanNI 620096 0/15/2012 03:41:50 P1T Joan R14arioo 3 of 4 Rao Fe4:50.00 to Fee:0.00 GARFIELD COUNTY CO 12. The proposed tower shall be developed consistent with the representations contained in the Twin Eagle Consulting LLC letter dated April 9, 2012 from Curtis Oliver, Senior Systems Engineer addressing FAA and FCC compliance and notification. 13. A waiver from the requirement to submit an FAA Form 7460 -1 shall be allowed based on compliance with Condition #12 and the FAA Notice Criteria Tool and FCC Towair Analysis provided by the Applicant. 14. The existing tower shall be removed after the new tower is confirmed as operational. - ■iii Mil INALP,14141Wiiinifit I111 Reeepllen #: 8200815 5!1512012 OS 41,68 P11 Joie RStnriou 4 of 4 Rao roe SO.@8 Sao Foa:0.00 GARFIELD COtJtTY CO Exhibit B (Site Plan) PROPOSED COMMUNICATION TOWER SITE PLMJ .�.e •fl4 PAD or.... P..t. =SO ,CIT