Loading...
HomeMy WebLinkAbout4.0 Land Use Change Permitr fri.1124WW1/411511T KM 11111 Reception #; 817479 04117/2012 11:07:28 AM Jean Alberto° 1 of 4 Reo Fee:$0.00 Doo Fee:0,00 GARFIELD COUNTY CD LAND USE CHANGE PERMIT for Encana Oil and Gas (USA) Inc. North Solidification Facility (Located in the SE% NE % , Section 29, Township 5 South, Range 95 West of the e P.M., Assessor's Parcel No. 2135 - 273 -00 -015, and as more fully described in Resolution No. 2012 -) In accordance with and pursuant to the Garfield County Unified Land Use Resolution of 2008, as amended, and Resolution No. 2012- of the Board of County Commissioners of Garfield County, State of Colorado, the following activity is hereby authorized by Land Use Change Permit: Material Handling and Solid Waste Transfer Facility (MIPA — 7066) This Land Use Change Permit — Major Impact Review is issued subject to the conditions contained in Resolution No. 2012._ and set forth in Exhibit "A" and the approved Site Plan, Exhibit "B" (attached hereto) and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Unified Land. Use Resolution of 2008, as amended, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. ATTEST: erk of the Board GARFIELD COUNTY BOARD OF COUNTY ' • '1 1 SSIONERS, G • ' D CO TY, COLORADO Frecept1cn4: 817479 04117/2012 11:07:28 AM Jean Alberico 2 of 4 Rec Fee:$0.00 Coo Fes:0.00 GARFIELD COUNTY CO Exhibit A 1. That all representations made by the Applicant in the application, and at the public hearing before the Planning Commission shall be conditions of approval, unless specifically altered by the Board of County Commissioners; 2. The operation of this facility and any future amendments shall be done in accordance with all applicable Federal, State and Local regulations governing the operation of this type of facility. 3. The Applicant shall maintain compliance with the provisions of the Unified Land Use Resolution of 2008 including but not limited to 7 -810, Standards for Industrial Uses. 4. The Applicant shall comply with their weed management plan and the recommendations of the County Vegetation Manager including protection of sensitive plant specifies by restricting construction activities to the south side of the detention pond on the north side of the site and compliance with dust control plans. 5. Prior to construction activity on the site the Applicant shall provide documentation of Colorado Department of Public Health ( CDPHE) Air Pollution Control Division approval of the facility as either being permit exempt or by issuance of any required permits. The Applicant shall submit to the County, CDPHE compliance documentation within 6 months of the start of operation, in accordance with CDPHE procedures for AIRS ID assignment. 6. The Applicant shall comply with all COGCC and DOT (Department of Transportation) transportation standards. 7. The site shall be maintained in accordance with dust management plans for Encana's North Parachute Ranch property with particular care exercised to manage dust during construction activities. 8. The "bypass roadway" north of the site shall maintain an adequate width pursuant to Encana operations plans /standards, for on -site operations to be conducted without conflicting with drive through traffic. 9. Potable water will be provided on site for employees as bottled water and a portable toilet will be provided as shown on the site plan. 10. The containment bins shall be painted with non-reflective paint in neutral colors to reduce glare and mitigate any visual impacts. 11. The Applicant shall implement all storm water management improvements as represented in the Application and contained in the Stormwater Management Plan, including Best Management Practices. The Applicant shall provide a barrier or additional berms on the north side of the site to restrict access into areas of . native vegetation and avoid drainage and related debris from impacting the site and adjacent roadway. ZNYIPINVilth,10P4i iatitICINil MI ill Reception #: 817479 04117�I2012 11:07:28 AM Jean Alberfco 3 of 4 Rec Fee:$0.00 Doo Fee:0.00 GARFIELD COUNTY CO 12. Monitoring wells as proposed shad be required to assess any impacts on ground water. Should impacts be discovered the Applicant shall cease operation of the facility until all remediation as required by Federal, State, and Local regulations including the COGCC are completed and corrective operational measures implemented to prevent reoccurrence. 13. The Applicant shall comply with and update as necessary the Piceance Emergency Response Guide to include the proposed facility. The facility shall be maintained and operated to minimize safety concerns and potential for wildfire including weed control, separation from native vegetation, and heat and spark mitigation on equipment. 14. Prior to operation of the facility the Applicant shall provide documentation of final approvals from the COGCC associated with their Rule 908 review. 15. Installation of the facilities shall be done in accordance with applicable engineering specification including manufacturers /fabricators recommendations for the steel containment bins. 111111friMMillihrigi linailY:141111/10 RN 11111 Reception#: 817479 04/1712012 11:07:28 AM an Alborioo 4 of 4 Roo Fae:$0.00 Duo Fees:0.00 GARFIELD COUNTY CO Exhibit B • • i 1% 10 II- IsvN •• t X tki . ,... : i , i .,... ,- . ..k . i. f ./' 7' .. . T. • ; : ., • v.. ' I ml .e4. .1t''. • I: AV . -.i , - T •- •. ---7.. .... - i I ii f 0. . 1 '..., ., vi. •,,‘ 1,‘. ,..t., —'' - k ill i i , ......, . 1' Itt•i:i. '', • , tl. .1 A l'.. i % • ,. o, .., .---. , inn. I I a 4 A t. \s,1 111111 f I . . ... I 1 1,..., • l'■ 111111,1i i m. _ „ 4 rHIO imak.scaPsluettribltl-listirimos-