HomeMy WebLinkAbout1.08 Traffic StudyTraffic Study
PDC Energy
Piceance Centralized Soil Treatment Facility
OLSSON
ASSOCIATES
OA Project No. 011 -2627
760 Horizon Drive, Suite 102 1 Grand Junction, CO 81506 1 TEL 970.263.7800 1 FAX 970.263.7456
LEVEL TWO ASSESSMENT
PETROLEUM DEVELOPMENT CORPORATION
PICEANCE SOIL TREATMENT FACILITY
GARFIELD COUNTY, COLORADO
O\OLSSON
ASSOCIATES
OA Project No. 011 -2627
January 2013
826 21 1/2 Road 1 Grand Junction, CO 81 505 1 970.263.7800 1 Fax 970.263.
INTRODUCTION & OBJECTIVE
This document summarizes findings of a Level Two Assessment performed for a proposed land
farm facility located on State Highway 6/24 in Garfield County approximately six miles northeast
of Parachute, CO. In the vicinity of the project, this highway also serves as the Interstate 70
frontage road. State Highway 6/24 will be used as the primary roadway to access the site
entrance located approximately 3.5 miles northeast of Parachute, CO. A vicinity map is included
in Appendix A.
Activity at the land farm facility will consist of three phases over approximately 20 years. These
phases include:
• Facility Construction (14 days)
• Operation (20 years)
• Reclamation (14 days)
EXISTING NETWORK
This land farm facility will be accessed from State Highway 6/24. According to the Colorado
Department of Transportation (CDOT) State Highway Access Code, this road is classified as a
Rural Highway (R -A). State Highway 6/24 is a two -lane asphalt roadway with 12 -foot driving
lanes and approximately two -foot surfaced and four -foot gravel /dirt shoulders. The road has a
posted speed limit of 50 mph.
EXISTING PARCELS
Current land uses for parcels along the gravel access road are primarily natural gas
development with limited rural residential and agricultural use. The majority of existing traffic is
related to natural gas development activities. Access to the site will be demonstrated via review
and approval of a subdivision exemption application, which is being submitted as a separate
application. No additional access to state highways or railroad crossings will be required.
BACKGROUND TRAFFIC
Peak hour turning movement counts were performed for the intersection at the site entrance on
State Highway 6/24. Counts were performed on Tuesday, January 11, 2013. The count data
includes passenger cars, single -unit vehicles, and multi -unit vehicles. Peak hour counts were
converted to passenger car equivalents (PCE) for the purpose of this study.
Level Two Traffic Assessment Page 1
Traffic data that is available on the CDOT Online Traffic Information Systems (OTIS) for the
section of State Highway 6/24 southwest of the intersection at 1st Street within Parachute, CO.
This data was used to find current and horizon year ADTs. Growth factors and DHV
distributions from the closest count station in Parachute, CO on State Highway 6/24 at reference
point 75.212 were assumed to be similar for the section of roadway near the site. The DHV at
the closest count station is approximately 12% of the ADT. The existing AM peak hour is
assumed to be the design hourly volume (DHV). It was found that the ADT for background
existing conditions is approximately 345 vpd. A 20 -year growth factor was used to find the 2033
ADT. Applying the growth factor yielded a 2033 ADT of approximately 635 vpd. Note that the
2033 horizon year corresponds with end of the site life cycle. Existing and future traffic data for
State Highway 6/24 at reference point 75.212 from the CDOT OTIS is included in Appendix B.
TRIP GENERATION & DISTRIBUTION
Trip generation is generally determined using rates found in the ITE Trip Generation manual.
Rates from this publication are applied to values related to the size of the proposed site to
estimate the trips expected to enter and exit the site. In this case, no rates are provided for
facilities similar to this. To estimate trips expected for this site, information was gathered
regarding the expected traffic based on previous projects similar to this one. Table 1
summarizes the expected average and maximum trips for each phase discussed previously.
Table 1: Trip Generation — Land Farm Facility
Phase
Average
Trips /Day
(PCE)
Maximum
Trips /Day
(PCE)
Peak
Maximum
Hour Trips
p
rPCE
Trip Distribution
P
Enter
Exit
Total
Hour
Enter
Peak
Trips
Exit
[Percent
AM Peak Hour
Construction
of Facility
18
32
6
33%
10
70%
30%
7
3
Operation
14
27
2
90%
6
50%
50%
3
3
Reclamation
20
30
5
40%
9
70%
30%
6
3
PM Peak Hour
Construction
of Facility
6
33%
10
30%
70%
3
7
Operation
2
90%
6
50%
50%
3
3
Reclamation
5
40%
9
30%
70%
3
6
PCE: Passenger Car Equivalent
Level Two Traffic Assessment
Page 2
For the Construction and Reclamation phases, it is assumed that all pickups enter during the
AM peak and exit during the PM peak to coincide with workers arriving and leaving, respectively.
For the Operation phase, there are not expected to be full time staff, so trips from pickups are
assumed to be constant throughout the day. It is also assumed that entering and exiting heavy
trucks will be constant throughout a work day. Detailed tables showing daily trips for each phase
are shown in Appendix C.
Based on background traffic volumes and expected site trips, daily traffic volumes are expected
to increase by approximately 5.2% in 2013. Based on the CDOT OTIS, the design hourly
volume (DHV) is 12% of the background ADT on State Highway 6/24. Site peak hour volumes
are an approximation of the DHV, and therefore the peak hour volume site traffic is expected to
increase approximately 19.6% from the existing peak hour volume in 2013 and 10.6% in 2033.
Traffic volume increase calculations are shown in Table 2.
Table 2: Traffic Volume Increase Calculations — Land Farm Facility
Year
Background
ADT
Average Daily
Site Trips
Daily
Increase
DHV
Peak Site
Trips
Peak Hour
Increase
2013
345
18
5.2%
41
10
19.6%
2033
635
20
3.1%
76
9
10.6%
With respect to the distribution of site trips, discussions with the client have indicated that all
trips will be entering from and exiting to the west, using the 1 -70 interchange at Parachute.
CONSTRUCTION PHASE
Staging areas and temporary access points will not be required during construction for this
project. The access into this facility from State Highway 6/24 is already permitted by the
Garfield County Road and Bridge Department; therefore, no additional permits are required.
There will be no road closures or traffic interruptions. During the construction phase, it is
expected that there will be approximately four to five heavy trucks enter and exit the site daily.
This traffic will be primarily delivering and retrieving equipment on a 22 -wheel low boy truck or
delivering materials on 18 -wheel flatbed trucks.
AUXILIARY LANE ANALYSIS
As defined by the Colorado State Access Code, Interstate 70 Frontage Road is classified as a
Rural Highway (R -A). With this classification, auxiliary lanes are required for left turns greater
than 10 vph and right turns greater than 25 vph in the peak hour.
Level Two Traffic Assessment Page 3
Eastbound left turns at the site access are expected to be approximately 5 vph and 9 vph during
the Construction and Reclamation phases, respectively. Site trips to be added to this movement
for each phase are 7 vph (PCE) and 6 vph (PCE), resulting in 12 vph and 15 vph, respectively.
However, note that these phases are 14 days each. While these volumes exceed the threshold
for a left turn auxiliary lane, a solution such as appropriate temporary traffic control and a public
information effort to alert drivers of the increase in traffic during this short period, would be more
appropriate than a permanent solution like an auxiliary lane.
For the majority of the life of this facility, it is expected the daily traffic will be of a continuous
nature and evenly distributed throughout the day. The peak hour trips are expected to be
approximately 3 vph (PCE) entering and 3 vph (PCE) exiting. Given the small addition of traffic
the land farm facility is expected to generate during the peak hour, it is expected that the
existing plus site eastbound left turning volumes will be approximately 8 vph in both peak hours
and will not meet auxiliary lane requirements. Near the end of the Operations phase in 2033
with the increase in background volumes, it is expected that eastbound left turning volumes will
be approximately 12 vph in the peak hours and will meet auxiliary lane requirements.
SIGHT DISTANCE ANALYSIS
At the intersection of State Highway 6/24 & Site Access, exiting site distance for westbound
movements on Site Access are at least 850 feet looking both north and south along State
Highway 6/24. Likewise, entering site distance for southbound left turning movements on State
Highway 6/24 are at least 850 feet looking south. Note that, for State Highway 6/24, with posted
speed limit of 50 mph, a minimum of 500 feet, 650 feet, and 850 feet for passenger cars, single
unit trucks, and combination trucks, respectively, is required. Site distance is expected to be
designed for combination trucks with State Highway 6/24 operating as a truck route.
Due to the horizontal curvature of State Highway 6/24 to the northwest of the site access,
westbound traffic must look over their shoulder to see oncoming traffic. Ideally, intersection legs
would meet at 90° angles to minimize the angle a person must turn to see oncoming traffic. The
current angle of the site access to State Highway 6/24 is 45 °. Realignment of the site access is
not expected to be possible with Interstate 70 to the south and a large embankment to the north.
While it would be desirable to realign this intersection to reduce the angle, the throat of the drive
is wide enough such that westbound vehicles may orient themselves closer to 90° at the
intersection. Photos of the intersection of State Highway 6/24 & Site Access can be found in
Appendix D.
Level Two Traffic Assessment Page 4
RECOMMENDATIONS
State Highway 6/24 is currently an Access Control facility. However, the roadway is being
considered for relinquishment to Garfield County. After this the roadway will lose its status as
an R -A access category, fall under the jurisdiction of Garfield County, and undergo
improvements. From an access control standpoint, it is not expected that traffic from the and
farm facility will interfere with the access category change. However, based on the expected
site trips in the horizon year analysis, a left turn auxiliary lane is required at the site entrance.
When considering the change in ownership of the roadway and the expected improvements
thereafter, it is recommended that the intersection be reevaluated for the need of auxiliary lanes
in the future as part of future roadway projects.
Based on the number of expected site trips discussed above, the increase in traffic is not
expected to increase average daily traffic or peak hour traffic by 20 %. Based on the results of
the auxiliary lane analysis, no auxiliary lanes are recommended for the land farm facility. During
the Construction and Reclamation phases, when truck traffic is at its peak, it is recommended
that the owner implement a traffic control plan that will alert drivers of the increase in truck
traffic.
Level Two Traffic Assessment Page 5
PDC Soil Treatment Facility
Garfield County, CO
LEGEND
Study Intersection
NTS
e,'\ Interstate 70
O‘OLSSON
ASSOCIATES
Vicinity Map
FIGURE
1
APPENDIX B
Traffic Volumes for Highway 006M
ROUTE REF PT END REF AADT AADT AADT AADT YR 20 DHV AADT
PT YR SINGLE COMB FACTOR TRUCKS
LOCATION
006M 74.875 75.042 2600 2011 150 100 1.83 12 250 ON SH 6 1ST ST SW /O PARACHUTE AVE PARACHUTE
006M 75.042 75.212 2600 2011 150 90 1.83 12 240 ON SH 6 1ST ST NE /O PARACHUTE AVE PARACHUTE
006M 75.212 88.895 4800 2011 330 230 1.83 12 560 ON SH 6 1ST ST SW /O PARACHUTE CREEK RD CR 215 PARACHUTE
2033 Traffic Volumes for Highway 006M
END REF PROJ PROJ AADT PROJ AADT
ROUTE REF PT AADT DHV LOCATION
AADT SINGLE COMB
PT
006M 74.875 75.042 2600 12 4974 287 191 ON SH 6 1ST ST SW /O PARACHUTE AVE PARACHUTE
006M 75.042 75.212 2600 12 4974 287 172 ON SH 6 1ST ST NE /O PARACHUTE AVE PARACHUTE
006M 75.212 88.895 4800 12 9182 631 440 ON SH 6 1ST STSW /O PARACHUTE CREEK RD CR 215 PARACHUTE
APPENDIX C
CONSTRUCTION OF PICEANCE CENTRALIZED SOIL TREATMENT FACILITY
Activity
Day
Trucks
Weights
No. Trucks
Equipment
Equipment Wt.
Daily
Trips/Truck
Dally
Trips
Daily
PCE Trips
Phase
Total (PCE)
Construction of Pad
1
22 Wheel low -boy
170000 GCW
1
D9
85000
1
1
3
3
1
22 Wheel low -boy
85000 GCW
1
1
1
3
3
122
Wheel low -boy
120000 GCW
1
Grader
35000
1
1
3
3
1
22 Wheel low -boy
85000 GCW
1
1
1
3
3
5
18 -wheel belly dump
80000 GCW
3
Soils /Gravel
50000
1
3
9
9
5
18 -wheel belly dump
30000 GCW
3
1
3
9
9
9
18 -wheel belly dump
80000 GCW
3
Soils /Gravel
50000
1
3
9
9
9
18 -wheel belly dump
30000 GCW
3
1
3
9
9
14
22 Wheel low -boy
85000 GVW
1
1
1
3
3
14
22 Wheel low -boy
170000 GCW
1
D9
85000
1
1
3
3
14
22 Wheel low -boy
85000 GVW
1
1
1
3
3
14
22 Wheel low -boy
120000 GCW
1
Grader
35000
1
1
3
3
Every Day of Construction
1 -14
Fuel /Maintenance
60000 GCW
1
Fuel
25000
1
1
3
42
1 -14
Fuel /Maintenance
35000 GCW
1
1
1
3
42
1 -14
Pickup or other light vehicle
8000 GVW
4
2
8
8
112
Total Trips (One Way)
256
Average Trips/Day
18
Maximum Trips /Day
32
NOTE: All trips are one -way.
OPERATION OF PICEANCE CENTRALIZED SOIL TREATMENT FACILITY
Activity
Day
Trucks
Weights
No. Trucks
Equipment
Equipment Wt.
Daily
Trips /Truck
Daily
Trips
Daily
PCE Trips
Phase
Total (PCE)
Operation of Facility
Pickup or other light vehicle
8000 GVW
2
0.29
0.57
0.57
3577.14
Pickup or other light vehicle
8000 GVW
1
0.03
0.03
0.03
208.67
30 Ton Dump Truck
115000 GCW
2
Soil
57500
1
2.00
6.00
37560.00
30 Ton Dump Truck
57500 GCW
2
1
2.00
6.00
37560.00
10 Wheel Water Truck
60000 GCW
1
Water
35000
0.14
0.14
0.43
2682.86
10 Wheel Water Truck
25000 GCW
1
0.14
0.14
0.43
2682.86
22 Wheel low -boy
170000 GCW
1
D9
85000
0.14
0.14
0.43
2682.86
22 Wheel low -boy
85000 GVW
1
0.14
0.14
0.43
2682.86
For life of facility - assumed 20 years
Total Trips (One Way)
89637.24
Average Trips /Day
14.32
Maximum Trips /Day
27.00
NOTES: 1. All trips are one -way.
2. Trip Generation assumptions are as follows
1350 trucks per year
1 water truck per week
1 lowboy with equipment for soil movement per week
2 pickup trucks per week or oversight
1 pickup per month for samples
3. Average Trips are AADT
4. Maximum Trips assume all daily, weekly, and monthly trips arrive and leave the same day
RECLAMATION OF PICEANCE CENTRALIZED SOIL TREATMENT FACILITY
Activity
Day
Trucks
Weights
No. Trucks
Equipment
Equipment Wt.
Daily
Trips
Daily
PCE Trips
Phase
Total (PCE)
Regrading and Final Contour
1
22 Wheel low -boy
120000 GCW
1
Grader
35000
1
3
3
1
22 Wheel low -boy
85000 GCW
1
1
3
3
1
22 Wheel low -boy
170000 GCW
1
D9
85000
1
3
3
1
22 Wheel low -boy
85000 GCW
1
1
3
3
14
22 Wheel low -boy
85000 GVW
1
1
3
3
14
22 Wheel low -boy
170000 GCW
1
D9
85000
1
3
3
14
22 Wheel low -boy
85000 GVW
1
1
3
3
14
22 Wheel low -boy
120000 GCW
1
Grader
35000
1
3
3
Every Day of Construction
1 -14
Fuel /Maintenance
60000 GCW
1
Fuel
25000
1
3
42
1 -14
Fuel /Maintenance
35000 GCW
1
1
3
42
1 -14
Pickup or other light vehicle
8000 GVW
6
2
12
168
Total Trips (One Way)
276
Average Trips /Day
20
Maximum Trips /Day
30
NOTE: All trips are one -way.
APPENDIX D
OLSSON
ASSOCIATES
PDC Soil Treatment Facility — Sight Distance Photos
OA #11 -2627
PHOTO 1: Looking east from State Highway 6/24.
PHOTO 2: Looking northwest from site access.
O‘OLSSON
ASSOCIATES
PDC Soil Treatment Facility — Sight Distance Photos
OA #11 -2627
PHOTO 3: Looking west from site access.
PHOTO 4: Looking southeast from site access.
r0/ OLSSON
ASSOCIATES
PDC Soil Treatment Facility — Sight Distance Photos
OA #11 -2627
Looking southeast along State Highway 6/24.