HomeMy WebLinkAbout1.20 Drainage ReportDrainage Report PDC Energy Piceance Centralized Soil Treatment Facility OLSSON ASSOCIATES OA Project No. 011 -2627 760 Horizon Drive, Suite 102 1 Grand Junction, CO 81506 1 TEL 970.263.7800 1 FAX 970.263.7456 DRAINAGE REPORT PDC CENTRALIZED SOIL TREATMENT FACILITY GARFIELD COUNTY, COLORADO PREPARED FOR: PDC ENERGY, INC 1775 SHERMAN ST, STE 3000 DENVER, CO 80203 PH: (303) 860 -5800 CONTACT: RANDALL FERGUSON PREPARED BY: OLSSON ASSOCIATES 826 21 1/2 ROAD GRAND JUNCTION, CO 81505 PH: (970) 263 -7800 CONTACT: LORNE C. PRESCOTT WYATT E. POPP, PE, LEED AP MAY 17, 2012 REVISED FEBRUARY 1, 2013 OLSSON ASSOCIATES PROJECT No. 011 -2627 'OLSSON ASSOCIATES ENGINEER'S STATEMENT This report and plan for the final drainage design of the PDC Centralized Soil Treatment Facility was prepared by me, or under my direct supervision, in accordance with the provisions of the Cr'inrado Oil and Gas Conservation Commission (COGCC) for the owners thereof. Wyatt E. Popp, PE Registered Professional Engineer State of Colorado No. 38514 Date PDC Centralized Soil Treatment Facility Garfield County, CO 011 -2627 DRAINAGE REPORT TABLE OF CONTENTS I. INTRODUCTION 1 A. Background 1 B. Project Location 1 C. Property Description 2 D. Previous Investigations 2 II. DRAINAGE SYSTEM DESCRIPTION 2 A. Existing Drainage Conditions 2 B. Master Drainage Plan 3 C. Offsite Tributary Area 3 D. Proposed Drainage System Description 3 E. Drainage Facility Maintenance 4 III. DRAINAGE ANALYSIS AND DESIGN CRITERIA 4 A. Regulations 4 B. Development Criteria 4 C. Hydrologic Criteria 4 D. Hydraulic Criteria 4 IV. POST - CONSTRUCTION STORMWATER MANAGEMENT 4 A. Stormwater Quality Control Measures 4 B. Calculations 5 V. CONCLUSIONS 5 A. Compliance 5 B. Design Effectiveness 5 C. Areas in Flood Hazard Zone 5 VI. REFERENCES 5 APPENDIX A: MAPS AND EXHIBITS 1 APPENDIX B: HYDROLOGIC CALCULATIONS 2 APPENDIX C: HYDRAULIC CALCULATIONS 3 PDC Centralized Soil Treatment Facility Garfield County, CO 011 -2627 1 I. INTRODUCTION A. Background This Drainage Report has been prepared for PDC Energy's (PDC) Centralized Soil Treatment Facility (the SITE) by Olsson Associates. This report evaluates the SITE's historic drainage patterns, analyzes the change in stormwater quantity /quality associated with proposed development, and provides design to alleviate the impacts of increased stormwater runoff due to the proposed development. This report and plans are designed to bring the SITE into compliance with the COGCC rule stating, "Surface water diversion structures, including, but not limited to berms and ditches, shall be constructed to accommodate a one hundred (100) year, twenty -four (24) hour event. The facility shall be designed and constructed with a run -on control system to prevent flow onto the facility during peak discharge and a run -off control system to contain the water volume from a twenty -five (25) year, twenty -four (24) hour storm." The design of proposed structures and associated recommendations presented herein are intended to satisfy SITE - specific storm water regulations of the COGCC. B. Project Location The SITE is located in Section 25, Township 6 South, Range 95 West of the Sixth Principal Meridian, County of Garfield, State of Colorado. Refer to Figure 1 for project location. The SITE is approximately halfway between Rifle and Parachute, southwest of the Ruilson exit, on the north side of 1 -70. Figure 1: Vicinity Map PDC Centralized Soil Treatment Facility Garfield County, CO 011 -2627 2 C. Property Description The southwest to northeast diagonal boundary of the SITE is an existing underground pipeline. Parallel to that off -site are an existing overhead power line, another underground pipeline, and a dirt "two- track" roadway. The property line on the west is the west line of Section 24. The property line on the north is the north line of the SW1 /4 of section 25. D. Previous Investigations To our knowledge, no previous drainage studies have been approved for the SITE. II. DRAINAGE SYSTEM DESCRIPTION A. Existing Drainage Conditions The SITE drains to the Colorado River on the south side of 1 -70 via swales and culverts under the highway. Refer to the General Location Map in Appendix A for the SITE location relative to major tributary drainage ways. The existing SITE consists of natural swales and mountainous terrain. The SITE generally slopes from northeast to the southwest with slopes varying from 2% up to 15 %. The existing ground cover is primarily bare ground. The soils in the drainage area belong to the Hydrologic Soils Group B, soil that is moderately drained and has a moderate runoff potential. The Hydrologic Soils Map is in the Appendix A. The SITE consists of a total area of approximately 9.5 acres which includes five existing drainage swales; A, B, C, D, E. Stormwater appears to sheet -flow across the SITE to existing swales (refer to Figure 2, Existing SITE) exiting the SITE un- detained. Figure 2: Existing SITE PDC Centralized Soil Treatment Facility Garfield County, CO 011 -2627 3 B. Master Drainage Plan To our knowledge, no master drainage studies have analyzed the SITE. C. Offsite Tributary Area For the purposes of this study, all adjacent land was assumed to remain undeveloped in the foreseeable future. The area north of the SITE currently contributes to the flow in the 5 swales. This area is approximately 14.9 acres of undisturbed land. (To be known as Basin OS1). D. Proposed Drainage System Description The proposed drainage system was designed to divert existing off -site flows around the SITE in historic swales and flow patterns and to capture and contain all rainfall within the SITE. All flow from the off -site area that historically contributes to Swale A (refer to Figure 2, Existing SITE) will continue via a diversion channel along the north and west edges of the SITE. This swale will be sized to convey the 100 -year runoff from Basin OS1. All flow that contributes to Swale E will continue to do so and Swale E will not be affected by the proposed development. Swales B, C, and D will be eliminated by SITE grading. New channels will be graded into the proposed SITE to convey flow to a retention pond at the southwest corner of the SITE. The channels will be directed under the access roadway through corrugated metal pipe culverts. Refer to Sheets A -1 through A -3 in Appendix A for basin delineations and proposed drainage system layout. Basin OS1 is north of the SITE. Stormwater generated on this basin will sheet -flow from northeast to southwest and into a diversion swale that will carry the runoff around the SITE and discharge to open ground southwest of the SITE. Basin P1 is the northwestern most portion of the SITE. Stormwater generated on this basin will sheet -flow from northeast to southwest into a channel along the west side of the basin. Basin P2 flows from the north to south directly into the retention pond. For calculations, the pond is also included in basin P2. Basin P3 sheet flows to the south where it is collected in a channel along the retention pond access roadway. Basin P4 includes the west portion of the main access roadway (crowned) along with some minimal flow from the west. Basin P5 includes the east portion of the main access roadway (crowned) along with additional stormwater from the east. Basin P6 is the furthest northeast section of the SITE. Stormwater generated on this basin PDC Centralized Soil Treatment Facility Garfield County, CO 011 -2627 4 will sheet -flow from northeast to southwest into a channel along the south side of the basin. The Retention Pond at Design Point 2 is located at the southwest corner of the SITE. The pond was sized to hold the runoff from the 25 -year, 24 -hour storm event, and has a volume of 1.34 acre -feet at elevation 5193.0. The pond bottom is at elevation 5185.0. The embankment height is 8 feet to maximize available volume without becoming a jurisdictional retention pond. E. Drainage Facility Maintenance The owner shall be responsible for maintaining all on -site drainage facilities. The pond bottom should be scraped and re- graded at least every 1 -3 years to remove sediment build- up. In addition, the pond should be pumped and examined after any significant rainfall event to ensure proper functionality. During construction, run -off from the SITE should be treated prior to leaving the SITE using methods described in Volume 3 of the Urban Strom Drainage Criteria Manual, including use of straw bales and /or other methods to provide temporary water quality. III. DRAINAGE ANALYSIS AND DESIGN CRITERIA A. Regulations This report has been prepared in accordance with common engineering practices and the Mesa County /City of Grand Junction Stormwater Management Manual. B. Development Criteria There are no known constraints placed on the SITE due to floodplain studies, master studies or adjacent property drainage studies. The SITE will not receive any tributary flows from upstream land or adjacent development after development. C. Hydrologic Criteria Hydrologic calculations have been prepared in accordance with common engineering practices. Refer to Appendix B for all hydrologic calculations. D. Hydraulic Criteria Hydraulic calculations have been prepared in accordance with common engineering practices and the Mesa County /City of Grand Junction Stormwater Management Manual. Refer to Appendix C for all hydraulic calculations. IV. POST - CONSTRUCTION STORMWATER MANAGEMENT A. Stormwater Quality Control Measures PDC Centralized Soil Treatment Facility Garfield County, CO 011 -2627 5 The proposed riprap lined drainage swales will provide a means for stormwater to be routed around and through the SITE during all post- construction storm events. In this manner, stormwater quality control measures will not be needed because developed run -off rates are equivalent to existing condition run -off rates with little change in impervious area. B. Calculations Refer to Appendix B for developed condition hydrologic calculations. V. CONCLUSIONS A. Compliance This report has been prepared in accordance with common engineering practices and the Mesa County /City of Grand Junction Stormwater Management Manual. B. Design Effectiveness Proper implementation of the proposed measures outlined in this report will alleviate the direct impacts of stormwater run -off on adjacent, downstream lands. C. Areas in Flood Hazard Zone The SITE is not within a FEMA- designated flood hazard zone and is designated as Zone D. VI. REFERENCES 1) Mesa County /City of Grand Junction Stormwater Management Manual, December 2007. 2) Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, November 2010. PDC Centralized Soil Treatment Facility Garfield County, CO 011 -2627 APPENDIX A: MAPS AND EXHIBITS PDC Centralized Soil Treatment Facility Garfield County, CO 011 -2627 39° 29' 43" 39° 29' 21" 107° 5T 28' 0 N.■ 245680 Hydrologic Soil Group —Rifle Area, Colorado, Parts of Garfield and Mesa Counties (PDC Land Farm) 245760 245840 245920 246000 246080 39°29'43" 0) o� w o i o 0 io m CO v v 245680 107° 5T 27" 245760 245840 Map Scale: 1:3,170 if printed on Asize (8.5" x 11 ") sheet. 0 30 60 120 0 100 200 USDA Natural Resources Conservation Service 400 245920 Meters 180 Feet 600 Web Soil Survey National Cooperative Soil Survey 246000 246080 0 0 OJ N ■N Mrs. 0 5/3/2012 Page 1 of 4 39°29'22" Hydrologic Soil Group —Rifle Area, Colorado, Parts of Garfield and Mesa Counties (PDC Land Farm) MAP LEGEND MAP INFORMATION Area of Interest (A01) Map Scale: 1:3,170 if printed on A size (8.5" x 11") sheet. Area of Interest (AOI) Soils Soil Map Units Soil Ratings 0 A 0 ND El 0 B/D 0 0 C/D 0 Not rated or not available Political Features 0 Cities Water Features Streams and Canals Transportation +++ Rails erie Interstate Highways US Routes Major Roads Local Roads .:f The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for accurate map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: UTM Zone 13N NAD83 This product is generated from the USDA -NRCS certified data as of the version date(s) listed below. Soil Survey Area: Rifle Area, Colorado, Parts of Garfield and Mesa Counties Survey Area Data: Version 6, Mar 25, 2008 Date(s) aerial images were photographed: 8/8/2005 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/3/2012 Page 2 of 4 Hydrologic Soil Group —Rifle Area, Colorado, Parts of Garfield and Mesa Counties PDC Land Farm Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Rifle Area, Colorado, Parts of Garfield and Mesa Counties (C0683) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 9 Badland D 0.0 0.0% 47 Nihill channery loam, 6 to 25 percent slopes B 24.9 24.9 100.0% 100.0% Totals for Area of Interest Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long- duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A /D, B /D, and C /D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (ND, B /D, or C /D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/3/2012 Page 3 of 4 O\OLSSON ASSOCIATES 4690 Table Mountain Drive, Suite 200 TEL 303.237.2072 Golden, CO 80403 FAX 303.237.2659 www.oaconsulting.com i I (/1 0.36 MATCHLINE SHEET A -2 EXISTING SWALE TO REMAIN X X X X X z�_ r VZ //..... � �r - � it V � 38514 v: it 1� III 0.28 NI �03: f� // EXISTING SWALE TO REMAIN I i 41; 7' ��II'I�i:, `�/ / // 'h // / � � / rl / 7 zz z r * zz 7/ z 7* // // OLSSON :NRRI OCIATES ASSUMES NO RESPIBILITY FOR EXISTINLITY LOCATIONS (HORIZO OR VERTICAL)// THE EXIG UTILITIES SHOWN ON THISWING HAVE BEEN PLOTTED OM THE BEST HOWEVERAC6PONSIBILL OF THE RACTOR TO FIELD VERIFY TOCATION OF ALL COIMIMENC COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. REVISIONS DESCRIPTION 0. oz .0 5 me ih), v_________________/00.0.- ,ct 6,rri*'a Q "ETEN TION PO DRAINAGE PLAN SITE PLAN PDC ENERGY CENTRALIZED SOIL TREATMENT FACILITY GARFIELD COUNTY, COLORADO 2013 )0r Z7 // /� LEGEND // PROPOSED DRAINAGE BASIN SUMMARY // /i- • BASIN BOUNDARY BASIN DESIGNATION aka DESIGN PT. BASIN I.D. AREA (AC) DISCHARGE 25 -YR (CFS) DISCHARGE 100 -YR (CFS) // 1 P1 1.58 0.88 1.64 VP 25 YR RUNOFF COEFF. /�/ // /� 100 YR RUNOFF COEFF. BASIN AREA IN ACRES // 2 P1 P2, P3, P4, P5, P6 7.05 3.86 7.15 3 P3, P4, P5, P6 4.08 2.22 4.11 /�. - -- -- 8200 - - - -- EXISTING CONTOURS 4 P4 0.28 0.16 0.30 /� -8200 PROPOSED CONTOURS // /� DRAINAGE FLOW DIRECTION I/ _ _ _ 16 _ _ _ _ 5 P5 0.43 0.25 0.47 6 P5, P6 1.88 1.05 1.95 drawn bv: E0 checked by WP 1 / f Q DESIGN POINT I Z , 1" = 60' approved by LP ONQC by project no 011 -2627 drawing no 011 -2627 GRD.DWG 0' 30 60' 120' SCALE IN FEET d2ce: 02 -01 -2013 SHEET A -1 112627_XCONT -OS 112627_XCONT 11.2627_PCONT 112627_TBLOCK 1 n LEGEND 8200- BASIN BOUNDARY BASIN DESIGNATION 25 YR RUNOFF COEFF. 100 YR RUNOFF COEFF, BASIN AREA IN ACRES EXISTING CONTOURS DRAINAGE FLOW DIRECTION HISTORIC DRAINAGE BASIN SUMMARY DESIGN NT. BASIN I.D. AREA (AC) DISCHARGE 25 -YR (CFS) DISCHARGE 100 -YR (CFS) 051 14.92 11.38 21.08 MATCHLINE SHEET A -1 1" = 60' 0' 30' 60' 120' SCALE IN FEET OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. REVISIONS DESCRIPTION REVISIONS z J a co z O m _ = wo �z ZO O 7) 0 w zL.L O X w H J U LL 1- z w �Q W w z� W J d O 0 w N J 1- F" Z w U M O N GARFIELD COUNTY, COLORADO drawn by: checked by: approved by: OAIQC by: project no.: 011 -2827 drawing no.: 011 -2627 GRD.DWG date: 02 -01 -2013 EO WP LP SHEET A -2 0 0_ a N 0 0 0 0 N O\OLSSON ASSOCIATES 4690 Table Mountain Drive, Suite 200 TEL 303.237.2072 Golden, CO 80403 FAX 303.237.2659 www.oaconsulting.com EXISTING SWALE TO REMAIN / / / x X X X X X X / : : ............... / "='r�1►'�� I i f -' II 1114 1'� 11 11 II riT II � �'N1 `' •1 111 p I- II�1I 1jli11 3,r 101 `/ 1 1 "�kS 47,0 70 II 1, � Ell'ry `' IIuII11 /1�III IIIJ•�� Lt♦ Or / //' /' zzz , , / / ,„,,,,.... ' / _ / �� �/ 9 / / /// / / `� - - / / // / / \ �/ / / \ / / /// �. / /� i I� / / / / //// Z. / // 77 / / / // / „ / // /* / 38514 NO RESPONSIBILITY O ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE IT IS OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. REVISIONS DESCRIPTION cn W ce 1101 / zz Hkl n / ,.:,tt141#4 / �/ /� �j �/ PROPOSED CMP CULVERT SUMMARY (25 YEAR) DRAINAGE PLAN TRAPEZOIDAL CHANNEL AND CULVERT PLAN PDC ENERGY CENTRALIZED SOIL TREATMENT FACILITY GARFIELD COUNTY, COLORADO 1 2013 CULVERT PIPE DIAMETER NORMAL DISCHARGE (CFS) O -1 12" 0.16 1,.•, tt dt. ! >x" / ti• / / / �r � C-2 12" 0,16 C -3 12" 0.25 � °= / ''' C -4 C -5 12" 12" 0.25 1.05 EXISTING SWALE j_ / �I TO REMAIN / / / / / �/ C -6 12" 0.13 /'k \1111111011V / / LEGEND 1 / / / /1 / CONTRIBUITING AREA BOUNDARY PROPOSED TRAPEZOIDAL CHANNEL SUMMARY / � /� DISCHARGE 100 —YR / / / + / F -1 SWALE SWALE AREA (AC) (CFS) / / / / C CULVERT F -1 1.58 1.64 -1 - - / F -2 4.09 4.11 / / - - - - -- 5200 - - - -- EXISTING CONTOURS F -3 0.28 0.30 / // F -4 0.43 0.47 —5200— PROPOSED CONTOURS / F —5 F 1.45 1.95 / -1 14.92 18.38 / / / I / / / —_.o, �/ I Z/V J / I V// 1" = 6D' rawn y checked bY: WP proved approved by LP OA/QC projactno.: 011 -2627 drawing no.: 011 -2627 GRID DWG 0' 30' 60' 120' SCALE IN FEET d2ta: 02 -01 -2013 SHEET A -3 APPENDIX B: HYDROLOGIC CALCULATIONS PDC Centralized Soil Treatment Facility Garfield County, CO 011 -2627 DESCRIPTION ULTIMATE OR INITIAL DESIGNER CITY OR COUNTY PDC Land Farm Draft Drainage Study CAU Garfield County 1 HOUR DESIGN POINT RAINFALL VALUES -NOAA ATLAS FOR COLORADO 2 YR 5 YR 10 YR 25 YR 50 YR 100 YR 0.65 0.85 1.00 1.25 1.40 1.66 24 HOUR DESIGN POINT RAINFALL VALUES -NOAA ATLAS FOR COLORADO 2 YR 5 YR 10 YR 25 YR 50 YR 100 YR 1.20 1.50 1.80 2.10 2.40 2.60 PDC Landfarm 5/24/2012 5:38 PM Return Period 2 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr 6 -hr 0.90 2.00 c 24 -hr 1.20 1.50 1.80 2.10 2.40 2.60 o 1 -hr 0.65 0.85 1.00 1.25 1.40 1.66 3 0 Permanent BMP Test Area Garden Gulch Road COMPOSITE 'C' FACTORS (DEVELOPED) LOCATION: Garfield County Draft Drainage Study BY: CAU Soil Type: B DATE: 5/24/2012 BASIN DESIGNATION UNDEVELOPED DEVELOPED COMPOSITE C FACTOR % IMPERVIOUS UNDEV DEV TOTAL 2YR 5 YR 10 YR 25 YR 100 YR 2YR 5 YR 10 YR 100 YR 2YR 5 YR 10 YR 25 YR 100 YR 2YR 5 YR 10 YR 100 YR 2YR 5 YR 10 YR 25 YR 100 YR Imperviousness= 2 10 P1 1.58 0.00 1.58 0.00 0.08 0.17 0.26 0.36 0.06 0.14 0.22 0.31 0.40 0.00 0.08 0.17 0.26 0.36 2.00 P2 1.43 0.00 1.43 0.00 0.08 0.17 0.26 0.36 0.06 0.14 0.22 0.31 0.40 0.00 0.08 0.17 0.26 0.36 2.00 P3 1.92 0.00 1.92 0.00 0.08 0.17 0.26 0.36 0.06 0.14 0.22 0.31 0.40 0.00 0.08 0.17 0.26 0.36 2.00 P4 0.28 0.00 0.28 0.00 0.08 0.17 0.26 0.36 0.06 0.14 0.22 0.31 0.40 0.00 0.08 0.17 0.26 0.36 2.00 P5 0.43 0.00 0.43 0.00 0.08 0.17 0.26 0.36 0.06 0.14 0.22 0.31 0.40 0.00 0.08 0.17 0.26 0.36 2.00 P6 1.45 0.00 1.45 0.00 0.08 0.17 0.26 0.36 0.06 0.14 0.22 0.31 0.40 0.00 0.08 0.17 0.26 0.36 2.00 0S1 14.92 0.00 14.92 0.00 0.08 0.17 0.26 0.36 0.06 0.14 0.22 0.31 0.40 0.00 0.08 0.17 0.26 0.36 2.00 COMPOSITE I, % TOTAL A, ac 2.00 7.10 Olsson Associates 5/24/2012 PDC Centralized. Soil Treatment Facility 011- 2627_Hydrology and Pond Vol Calcs STANDARD FORM SF -2 TIME OF CONCENTRATION (DEVELOPED) REMARKS LOCATION: Garfield County Draft Drainage Study BY: CAU DATE: 5/24/2012 FORMULAS: * Ti = 1.8 (1.1- C5)L ^0.5/(S ^1/3) ** V =CV *(S /100) ^0.5 SUB -BASIN DATA INIT. /OVERLAND TIME (Ti) TRAVEL TIME 'TO TOTAL Tc Check (Urbanized Basins) FINAL Tc DESIGNATION Cs AREA (AC) LENGTH (FT) SLOPE % Ti (Min.)* LAND SURFACE LENGTH (FT) SLOPE % VEL. (FPS) ** Tt(Min.) Ti +TI(Min.) LGTH. (FT) Tc = (L/180) + 10 (minutes) P1 0.08 1.58 300 3.50 21.01 BARE 580 3.50 1.87 5.17 26.18 880.00 14.89 26.18 P2 0.08 1.43 300 5.00 18.65 BARE 245 5.00 2.24 1.83 20.48 545.00 13.03 20.48 P3 0.08 1.92 300 5.00 18.65 BARE 314 5.00 2.24 2.34 20.99 614.00 13.41 20.99 P4 0.08 0.28 300 3.80 20.44 BARE 432 3.80 1.95 3.69 24.13 732.00 14.07 24.13 P5 0.08 0.43 300 3.80 20.44 BARE 470 3.80 1.95 4.02 24.46 770.00 14.28 24.46 P6 0.08 1.45 300 3.70 20.62 BARE 627 3.70 1.92 5.43 26.06 927.00 15.15 26.06 0S1 0.08 14.92 100 22.50 6.52 BARE 1082 5.40 2.32 7.76 14.28 1182.00 16.57 14.28 Olsson Associates 5/24/2012 PDC Centralized Soil Treatment Facility 011- 2627_Hydrology and Pond Vol Calcs STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE, STANDARD FOR SF -3) DESIGN STORM: 25 -YEAR DEVELOPED PDC Land Farm Draft Drainage Study Garfield County Calc. by: CAU Chk'd by: WEP Date: 5/24/2012 DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF DITCH TRAVEL TIME REMARKS Z Q m AREA (AC) COEFF. (C) c H Q- U t v n Sum Area i = U F s Sum C*A Total Q (cfs) SLOPE % FLOW (CFS) LENGTH (FT) d J > Lu TRAVEL TIME Tt 1 P1 1.58 0.26 26.18 0.41 2.15 0.88 2 7.10 27.39 2.10 1.84 3.86 Design point 2, P1 +P2 +P3 +P4 +P5 +P6 2 P2 1.43 0.26 20.48 0.37 2.46 0.91 3 4.09 27.39 2.10 1.06 2.22 Design point 3, P3 +P4 +P5 +P6 3 P3 1.92 0.26 20.99 0.50 2.43 1.21 2.16 26.06 2.16 0.56 1.21 Design point 4, P4 +P5 +P6 4 P4 0.28 0.26 24.13 0.07 2.25 0.16 0.30% 0.16 384 5.4 1.2 Tt from DP4 to DP2 6 1.88 26.06 2.16 0.49 1.05 Design point 6, P5 +P6 5 P5 0.43 0.26 24.46 0.11 2.24 0.25 0.30% 0.25 450 5.4 1.4 Tt from DP5 to DP2 6 P6 1.45 0.26 26.06 0.38 2.16 0.81 0.30% 0.81 430 5.4 1.3 Tt from DP6 to DP2 14.92 18.91 2.57 3.86 9.92 Outlet of the diverstion ditch OS1 14.92 0.26 14.28 3.86 2.94 11.38 0.15% 11.38 1000 3.6 4.6 Tt from OS1 to Outlet Olsson Associates 5/24/2012 PDC Centralized Soil Treatment Facility 011- 2627_Hydrology and Pond Vol Calcs STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE, STANDARD FOR SF -3) DESIGN STORM: 100 -YEAR DEVELOPED PDC Land Farm Draft Drainage Study Garfield County Calc. by: CAU Chk'd by: WEP Date: 5/24/2012 DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF DITCH TRAVEL TIME REMARKS Z Q m AREA (AC) COEFF. (C) c H Q- U t v Sum Area i = U F s Sum C*A Total Q (cfs) SLOPE % FLOW (CFS) LENGTH (FT) d J > Lu TRAVEL TIME Tt 1 P1 1.58 0.36 26.18 0.57 2.85 1.64 2 7.10 27.39 2.78 2.57 7.15 Design point 2, P1 +P2 +P3 +P4 +P5 +P6 2 P2 1.43 0.36 20.48 0.52 3.26 1.69 3 4.09 27.39 2.78 1.48 4.11 Design point 3, P3 +P4 +P5 +P6 3 P3 1.92 0.36 20.99 0.70 3.22 2.24 2.16 26.06 2.16 0.78 1.69 Design point 4, P4 +P5 +P6 4 P4 0.28 0.36 24.13 0.10 2.98 0.30 0.30% 0.30 384 5.4 1.2 Tt from DP4 to DP2 6 1.88 26.06 2.86 0.68 1.95 Design point 6, P5 +P6 5 P5 0.43 0.36 24.46 0.16 2.96 0.47 0.30% 0.47 450 5.4 1.4 Tt from DP5 to DP2 6 P6 1.45 0.36 26.06 0.53 2.86 1.50 0.30% 1.50 430 5.4 1.3 Tt from DP6 to DP2 14.92 18.91 3.40 5.41 18.38 Outlet of the diverstion ditch OS1 14.92 0.36 14.28 5.41 3.90 21.08 0.15% 21.08 1000 3.6 4.6 Tt from OS1 to Outlet Olsson Associates 5/24/2012 PDC Centralized Soil Treatment Facility 011- 2627_Hydrology and Pond Vol Calcs Volume for Retention Pond Prismoidal Method Required Volume V =IA Basin I A V ACCUM.VOL. (in) (AC) (AC -FT) P1 2.10 1.58 0.28 P2 2.10 1.43 0.25 P3 2.10 1.92 0.34 P4 2.10 0.28 0.05 P5 2.10 0.43 0.08 P6 2.10 1.45 0.25 Total 2.10 7.10 1.24 ELEV. AREA VOLUME ACCUM.VOL. ACCUM.VOL. ACCUM.VOL. ACCUM. VOL. (FT) (FT2) (FT3) (FT3) (AC. -FT.) (GAL) (BBL) 5184.00 3,658 0 0 0.000 0 0 5185.00 4,439 4,042 4,042 0.093 30,240 720 5186.00 5,288 4,857 8,900 0.204 66,577 1,585 5187.00 6,193 5,735 14,634 0.336 109,477 2,607 5188.00 7,155 6,668 21,302 0.489 159,362 3,794 5189.00 8,174 7,659 28,961 0.665 216,658 5,159 5190.00 9,249 8,706 37,667 0.865 281,788 6,709 5191.00 10,380 9,809 47,476 1.090 355,169 8,456 5192.00 11,568 10,969 58,445 1.342 437,226 10,410 Olsson Associates 5/24/2012 PDC Centralized Soil Treatment Facility 011- 2627_Hydrology and Pond Vol Calcs APPENDIX C: HYDRAULIC CALCULATIONS PDC Centralized Soil Treatment Facility Garfield County, CO 011 -2627 Olsson Associates PDC Centralized Soil Treatment Facility C -6 CIRCULAR CONDUIT FLOW (Normal & Critical Depth Computation) Project: PDC Landfarm Pipe ID: Road Crossings 1x Design Information (Input) Pipe Invert Slope Pipe Manning's n -value Pipe Diameter Design discharge So = n= D= Q= 0.0173 0.0130 12.00 0.13 ft/ft inches cfs Full -flow Capacity (Calculated) Full -flow area Full -flow wetted perimeter Half Central Angle Full -flow capacity Af = Pf = Theta = Qf = Calculation of Normal Flow Condition Half Central Angle (0 <Theta <3.14) Theta = Flow area An = Top width Tn = Wetted perimeter Pn = Flow depth Yn = Flow velocity Vn = Discharge Qn = Percent Full Flow Flow = Normal Depth Froude Number Fr„ = Calculation of Critical Flow Condition Half Central Angle (0 <Theta- c <3.14) Critical flow area Critical top width Critical flow depth Critical flow velocity Critical Depth Froude Number Theta -c = Ac = Tc = Yc = Vc = Frc = 0.79 3.14 3.14 4.70 0.69 0.05 0.64 0.69 0.11 2.61 0.13 2.77% 1.65 0.79 0.07 0.71 0.15 1.81 1.00 sq ft ft radians cfs radians sq ft ft ft ft fps cfs of full flow supercritical radians sq ft ft ft fps 011- 2627_UD- Culvert_v2.00c, Pipe 5/15/2012, 8:25 AM Olsson Associates PDC Centralized Soil Treatment Facility Normal Flow Analysis - Trapezoidal Channel Project: Channel ID: PDC CENTRALIZED SOIL TREATMENT FACILITY Swale D -1 (Maximum Discharge at Minimum Slope) Y Z1 T B c11 Design Information (Input) Channel Invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = n= B= Z1 = Z2 = F= Y= 0.0100 0.040 0.00 3.00 3.00 0.00 2.00 ft /ft ft ft /ft ft /ft ft ft Normal Flow Condtion (Calculated) Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force Q= Fr = V= A= T= P= R= D= Es = Yo = Fs = 43.16 0.63 3.60 12.00 12.00 12.65 0.95 1.00 2.20 0.66 0.80 cfs fps sq ft ft ft ft ft ft ft ki p 011 -2627 UD- Channels v1.04 -MIN, Basics 5/15/2012, 8:24 AM Olsson Associates PDC Centralized Soil Treatment Facility Critical Flow Analysis - Trapezoidal Channel Project: Channel ID: PDC CENTRALIZED SOIL TREATMENT FACILITY Swale D -1 (100yr Water Depth at Minimum Slope) • Y 21 T Yo B Design Information (Input) Bottom Width Left Side Slope Right Side Slope Design Discharge B= Z1 = Z2 = Q= 0.00 3.00 3.00 42.08 ft ft /ft ft /ft cfs Critical Flow Condition (Calculated) Critical Flow Depth Critical Flow Area Critical Top Width Critical Hydraulic Depth Critical Flow Velocity Froude Number Critical Wetted Perimeter Critical Hydraulic Radius Critical (min) Specific Energy Centroid on the Critical Flow Area Critical (min) Specific Force Y= A= T= D= V= Fr = P= R= Esc = Yoc = Fsc = 1.64 8.12 9.87 0.82 5.18 1.01 10.40 0.78 2.06 0.27 0.56 ft sq ft ft ft fps ft ft ft ft kip 011 -2627 UD- Channels v1.04 -MIN, Basics 5/15/2012, 8:24 AM Riprap Swale Pond E (Maximum Discharge at Minimum Slope) PDC CENTRALIZED SOIL TREATMENT FACILITY Normal Flow Analysis - Trapezoidal Channel Project: Channel ID: Y Z1 Yo • v B Design Information (Input) Channel Invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = n= B= Z1 = Z2 = F= Y= 0.0480 0.038 0.00 3.00 3.00 1.33 2.00 ft /ft ft ft /ft ft /ft ft ft Normal Flow Condtion (Calculated) Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force Q= Fr = V= A= T= P= R= D= Es = Yo = Fs = 100.32 1.47 8.36 12.00 12.00 12.65 0.95 1.00 3.09 0.66 2.12 cfs fps sq ft ft ft ft ft ft ft ki p 011 -2627 UD- Channels v1.04, Basics 5/15/2012, 8:23 AM Critical Flow Analysis - Trapezoidal Channel Project: Channel ID: PDC CENTRALIZED SOIL TREATMENT FACILITY Riprap Swale Pond E (100yr Water Depth at Minimum Slope) Y T B %I1 Design Information (Input) Bottom Width Left Side Slope Right Side Slope Design Discharge B= Z1 = Z2 = Q= 0.00 3.00 3.00 8.49 ft ft /ft ft /ft cfs Critical Flow Condition (Calculated) Critical Flow Depth Critical Flow Area Critical Top Width Critical Hydraulic Depth Critical Flow Velocity Froude Number Critical Wetted Perimeter Critical Hydraulic Radius Critical (min) Specific Energy Centroid on the Critical Flow Area Critical (min) Specific Force Y= A= T= D= V= Fr = P= R= Esc = Yoc = Fsc = 0.87 2.24 5.19 0.43 3.78 1.01 5.47 0.41 1.09 0.14 0.08 ft sq ft ft ft fps ft ft ft ft kip 011 -2627 UD- Channels v1.04, Basics 5/15/2012, 8:23 AM PDC Centralized Soil Treatment Facility Garfield County, CO 011 -2627 CENTRALIZED SOIL TREATMENT FACILITY PDC ENERGY PRELIMINARY PLANS LOCATED IN SECTION 25, TOWNSHIP 6 SOUTH, RANGE 96 WEST OF THE 6TH PRINCIPAL MERIDIAN GARFIELD COUNTY, STATE OF COLORADO GENERAL NOTES 1. ALL WORK WITHIN PUBLIC RIGHTS -OF -WAY AND /OR EASEMENT AND ALL ON -SITE UTILITY WORK SHALL CONFORM TO THE TECHNICAL SPECIFICATIONS AND DESIGN CRITERIA FOR PUBLIC IMPROVEMENT PROJECTS OF GARFIELD COUNTY AND THE GRANTOR OF THE EASEMENT. 2. ALL MATERIALS AND WORKMANSHIP SHALL BE IN CONFORMANCE WITH THE LATEST STANDARDS AND SPECIFICATIONS OF THE APPROPRIATE GOVERNING AGENCY. THE CONTRACTOR SHALL HAVE IN HIS POSSESSION AT ALL TIMES (1) SIGNED COPY OF THE PLANS, STANDARDS, AND SPECIFICATIONS AS APPROVED BY THE APPROPRIATE GOVERNING AGENCY. THE CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FOR ANY VARIANCE TO THE ABOVE DOCUMENTS. 3 THE CONTRACTOR SHALL OBTAIN, AT HIS OWN EXPENSE, ALL APPLICABLE CODES, LICENSES, STANDARDS, PERMITS, BONDS, ETC. WHICH ARE NECESSARY TO PERFORM THE PROPOSED WORK. 4 THE EXISTING UTILITY LOCATIONS SHOWN ON THE PLANS ARE APPROXIMATE AND MAY NOT INCLUDE ALL LINES PRESENT. THE CONTRACTOR WILL BE RESPONSIBLE FOR CALLING THE UTILITY NOTIFICATION CENTER OF COLORADO AT 1- 800 - 922 -1987 AND COORDINATING FIELD LOCATIONS OF EXISTING UNDERGROUND UTILITIES PRIOR TO BEGINNING GRADING AND UTILITY WORK. 5. LOCATIONS AND ELEVATIONS OF EXISTING IMPROVEMENTS TO BE MET (OR AVOIDED) BY WORK TO BE DONE SHALL BE CONFIRMED BY THE CONTRACTOR THROUGH FIELD EXPLORATIONS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL REPORT TO THE ENGINEER ANY DISCREPANCIES BETWEEN HIS MEASUREMENTS AND THESE PLANS. 6. ANY CONSTRUCTION DEBRIS OR MUD DROPPED INTO MANHOLES, INLETS, PIPES OR TRACKED ONTO EXISTING ROADWAYS SHALL BE REMOVED IMMEDIATELY BY THE CONTRACTOR. THE CONTRACTOR SHALL REPAIR ANY EXCAVATIONS OR PAVEMENT FAILURES CAUSED BY HIS CONSTRUCTION. THE CONTRACTOR SHALL PROPERLY BARRICADE THE CONSTRUCTION SITE UNTIL CONSTRUCTION IS COMPLETE. 7. PRIOR TO BEGINNING THE WORK, THE CONTRACTOR SHALL OBTAIN ANY WRITTEN AGREEMENTS FOR INGRESS AND EGRESS TO THE WORK FORM ADJACENT PRIVATE PROPERTY OWNERS. ACCESS TO ANY ADJACENT PRIVATE PROPERTY SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS NOT OBTAINED BY THE OWNER OR OWNER'S REPRESENTATIVES AND PAY ALL FEES AS REQUIRED BY THE CONSTRUCTION COVERED IN THESE PLANS. 9. EXCEPT FOR MATERIALS DESIGNED TO BE RELOCATED ON THIS PLAN, ALL OTHER CONSTRUCTION MATERIALS SHALL BE NEW. 10. NO WORK SHALL BE BACKFILLED (INCLUDING BEDDING MATERIAL ABOVE THE SPRING LINE OF THE PIPE) UNTIL THE CONSTRUCTION HAS BEEN INSPECTED AND APPROVED FOR BACKFILLING BY THE APPROPRIATE GOVERNING AGENCY. 11. ALL WORK AND MATERIALS WILL BE SUBJECT TO INSPECTION AND APPROVAL BY THE OWNER OR THE OWNERS REPRESENTATIVE. 12. SHOP DRAWINGS AND MATERIAL SPECIFICATIONS SHALL BE SUBMITTED TO OWNER /ENGINEER FOR REVIEW AND APPROVAL PRIOR TO PLACEMENT OF MATERIAL. 13. ALL WORK SHALL CONFORM TO ALL LOCAL, STATE, AND FEDERAL APPLICABLE LAWS AND REGULATIONS. ALL ESTIMATES OF QUANTITIES ARE FOR INFORMATIONAL PURPOSES ONLY. CONTRACTOR AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR DETERMINING ALL QUANTITIES. CONTRACTOR SHALL PROVIDE ALL WORK AND MATERIALS AS SHOWN ON THESE PLANS. 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR JOB SITE SAFETY OF HIS OWN PERSONNEL, ALL VISITORS TO THE SITE, AND THE GENERAL PUBLIC INCLUDING, BUT NOT LIMITED TO, TRENCH EXCAVATION AND SHORINGS, TRAFFIC CONTROL, AND SECURITY NOT LIMITED TO NORMAL WORKING HOURS. 16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ALL EXISTING FEATURES TO REMAIN THAT ARE DAMAGED DURING CONSTRUCTION ACTIVITIES TO EQUAL OR BETTER CONDITION, AT HIS OWN EXPENSE. 17. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL SITE IMPROVEMENTS (INCLUDING BUT NOT LIMITED T0: UTILITIES, STRUCTURES, PAVING, LANDSCAPING, ETC.) SUCH THAT NO DAMAGE IS DONE TO SITE IMPROVEMENTS (I.E.: SAWCUTTING NEW PAVEMENT). SITE IMPROVEMENTS DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER. 18. IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE THAT A PRIOR UNIDENTIFIED SITUATION W PRESENT, THE CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY. 19. THE CONTRACTOR SHALL REMOVE ALL DEBRIS RESULTING FROM WORK UNDER THIS CONTRACT TO A LEGAL DUMP SITE. 20. DIMENSIONS SHOWN ON THE PLANS ARE TO FACE OF CURB LINE IN CURBED AREA AND EXTERIOR FACE OF BUILDING, AND TO CENTERLINE OF UTILITIES, UNLESS OTHERWISE SPECIFIED. 21. USE ONLY DIMENSIONS PROVIDED ON THESE PLANS. DO NOT SCALE DRAWINGS. INFORM ENGINEER OF ANY DISCREPANCIES AND /OR MISSING INFORMATION. 22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ACCESS TO ADJACENT PARCELS DURING ALL HOURS OF OPERATION FOR THE BUSINESSES LOCATED ON THOSE PARCELS. 23. CONTRACTOR TO OBTAIN TEMPORARY POWER, TELEPHONE AND WATER FOR THE SITE. 24. CONTRACTOR MUST COORDINATE CONSTRUCTION WITH OWNER /ADJACENT PROPERTY OWNER'S CONSTRUCTION MANAGER. 25. THE CONTRACTOR SHALL OBTAIN A COPY OF THE STANDARD SPECIFICATIONS AND DETAILS OF ALL AGENCIES EXERCISING JURISDICTION OVER THIS PROJECT. A COPY OF THESE SPECIFICATIONS AND DETAILS SHALL BE MAINTAINED ON THE JOBSITE AT ALL TIMES. A COPY OF ALL APPLICABLE STANDARD DETAILS AND SPECIFICATIONS ARE INCORPORATED HEREIN BY REFERENCE. 26. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ADJACENT COUNTY ROADS FREE AND CLEAN OF ALL DEBRIS AND DIRT FROM THE JOB SITE. VICINITY MAP V 15> SHEET LIST TABLE SHEET /! SHEET TITLE 1 COVER SHEET 2 SURVEY 3 LOCATION MAP 4 SITE PLAN 5 GRADING PLAN 6 ACCESS ROADWAY 7 SITE DETAILS SURVEY BEGINNING AT THE SOUTHWEST CORNER OF SECTION 25, T6S, R95W, U.S.B. &M., THENCE N00'55'06 "W 489.40' ALONG THE WEST SECTION LINE OF SAID SECTION 25 TO THE TRUE POINT OF BEGINNING, THENCE N00 °55'06 "W 834.01' ALONG THE SAID WEST LINE, THENCE N8919'53 "E 986.57'; THENCE 549 °01'03 "W 1289.08' TO THE POINT OF BEGINNING. BASIS OF BEARING IS A GPS OBSERVATION. CONTAINS 9.445 ACRES. MORE OR LESS. GRADING THE CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL PROPERTY CORNERS. ANY PROPERTY CORNERS DISTURBED OR DAMAGED BY GRADING ACTIVITIES SHALL BE RESET BY A PROFESSIONAL LAND SURVEYOR LICENSED IN THE STATE OF COLORADO, AT THE CONTRACTORS EXPENSE. 2. THE CONTOUR LINES SHOWN ARE TO FINISH GRADE FOR SURFACE OF ROADWAY, SURFACE OF LAND FARM, ETC. ALL SPOT ELEVATIONS SHOWN ARE TO FLOWLINE UNLESS OTHERWISE INDICATED. REFER TO TYPICAL SECTIONS FOR MULCH, SOD, PAVING, SLAB AND AGGREGATE BASE THICKNESS TO DEDUCT FOR GRADING LINE ELEVATIONS. 3. THE CONTRACTOR SHALL FINISH GRADE SLOPES AS SHOWN NO STEEPER THAN ONE FOOT VERTICAL IN THREE FEET HORIZONTAL. 4. THE CONTRACTOR SHALL CLEAN OUT ALL EXISTING AND PROPOSED INLETS, PIPES AND MANHOLES OF DEBRIS AND SEDIMENT AT COMPLETION OF SITEWORK. THIS WORK SHALL BE DONE TO THE SATISFACTION OF THE OWNER. 5. CONTRACTOR SHALL COORDINATE TESTING ACTIVITIES WITH THE GEOTECHNICAL ENGINEER. 6. ALL GRADING, COMPACTION, AND PAVEMENT CONSTRUCTION WILL BE IN ACCORDANCE WITH RECOMMENDATIONS FROM THE GEOTECHNICAL INVESTIGATION. 7. CONTRACTOR SHALL OBTAIN AND READ DRAINAGE REPORT (PROVIDED BY OWNER) IN ORDER TO UNDERSTAND DRAINAGE FEATURES. GEOTECHNICAL STUDY NOTE 1. CONTRACTOR SHALL OBTAIN A GEOTECHNICAL ENGINEERING STUDY IF ANY STRUCTURES ARE PLANNED. 2. A MODIFIED SOIL INVESTIGATION STUDY WAS CONDUCTED TO DETERMINE THE SOIL PERMEABILITY. EROSION & SEDIMENT CONTROL Know what's below. Call before you dig. CONTACT LIST: OWNER: PDC ENERGY 1775 SHERMAN ST. STE 3000 DENVER, CO 80203 PHONE:(303) 860 -5800 CONTACT, RANDALL FERGUSON SURVEYOR: UNITAH ENGINEERING & LAND SURVEYING 85 SOUTH - 200 EAST VERNAL, UT 84078 PHONE: (435) 789 -1017 ENGINEER: OLSSON ASSOCIATES 826 21 1/2 ROAD GRAND JUNCTION, CO 81505 PHONE: (970) 263 -7800 CONTACT: WYATT POPP, PE LORNE PRESCOTT 1. THIS PROJECT REQUIRES A PERMIT FOR STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITY FROM THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT. CONTRACTOR TO COMMENCE WORK ON THIS SITE ONLY AFTER AN ACTIVE PERMIT NUMBER HAS BEEN OBTAINED FROM THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT. 2 THE CONTRACTOR SHALL INSTALL EROSION /SEDIMENTATION CONTROLS PRIOR TO ANY SITE PREPARATION WORK (E.G., CLEARING, GRUBBING, OR EXCAVATION). 3. THE PLACEMENT OF EROSION /SEDIMENTATION CONTROLS SHALL BE IN ACCORDANCE WITH THE STORMWATER POLLUTION PREVENTION PLAN PREPARED FOR THE PROJECT. 4. CONTRACTOR TO ADJUST EROSION CONTROL MEASURES AS NEEDED FOR VARIOUS PHASES OF WORK. 5. CONTRACTOR TO ENSURE THAT NO DIRT AND SEDIMENT IS TRACKED ONTO ADJACENT ROADWAYS AND WATERWAYS. 6. APPROVED EROSION AND SEDIMENT CONTROL "BEST MANAGEMENT PRACTICES" (BMPS) SHALL BE MAINTAINED AND KEPT IN GOOD REPAIR FOR THE DURATION OF THIS PROJECT. AT A MINIMUM, THE CONTRACTOR SHALL INSPECT ALL BMPS EVERY 14 DAYS, AND AFTER ALL SIGNIFICANT PRECIPITATION EVENTS I.E. RAINFALL, SNOWMELT. ALL NECESSARY MAINTENANCE AND REPAIR ACTIVITIES SHALL BE COMPLETED WITHIN TWENTY -FOUR (24) HOURS AFTER DIRECTION BY THE INSPECTOR. ACCUMULATED SEDIMENT AND CONSTRUCTION DEBRIS SHALL BE REMOVED WEEKLY FROM ALL BMPS, OR AT ANY TIME THAT SEDIMENT OR CONSTRUCTION DEBRIS ADVERSELY IMPACTS THE FUNCTIONING OF THE BMPS. 7. TOPSOIL SHALL BE STOCKPILED WITHIN LIMITS OF CONSTRUCTION FOR USE ON AREAS TO BE RE- VEGETATED. ANY AND ALL STOCKPILES SHALL BE PLACED IN AN APPROVED LOCATION AND PROTECTED FROM EROSIVE ELEMENTS USING MEASURES SPECIFIED IN THE EROSION CONTROL PLAN. 8. SOILS THAT WILL BE STOCKPILED FOR MORE THAN THIRTY (30) DAYS SHALL BE MULCHED AND SEEDED WITH A TEMPORARY OR PERMANENT GRASS COVER WITHIN FOURTEEN (14) DAYS OF STOCKPILE CONSTRUCTION. 9. ANY SETTLEMENT OR SOIL ACCUMULATIONS BEYOND THE LIMITS OF CONSTRUCTION DUE TO GRADING OR EROSION SHALL BE REPAIRED IMMEDIATELY BY THE CONTRACTOR. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR REMEDIATION OF ANY ADVERSE IMPACTS TO ADJACENT WATERWAYS, WETLANDS, PROPERTIES, ETC. RESULTING FROM WORK DONE AS PART OF THIS PROJECT. 10. A WATER SOURCE MUST BE AVAILABLE ON SITE DURING EARTHWORK OPERATIONS AND UTILIZED AS REQUIRED TO MINIMIZE DUST FROM EARTHWORK EQUIPMENT AND WIND. 11. THE CONTRACTOR MUST KEEP ALL POLLUTANTS, INCLUDING SEDIMENT, CONSTRUCTION DEBRIS, AND TRENCH BACKFILL MATERIALS FROM ENTERING THE STORM SEWER SYSTEM. 12. ALL SPILLS INCLUDING, BUT NOT LIMITED T0, PETROLEUM PRODUCTS, SOLVENTS, AND CEMENT SHALL BE CLEANED UP IMMEDIATELY. GARFIELD COUNTY ENGINEERING DIVISION SHALL BE NOTIFIED IMMEDIATELY. 13. THE CONTRACTOR SHALL ENSURE THAT ALL LOADS OF CUT AND FILL MATERIAL IMPORTED TO OR EXPORTED FROM THE SITE SHALL BE PROPERLY COVERED TO PREVENT LOSS OF THE MATERIAL DURING TRANSPORT ON PUBLIC RIGHT -OF -WAY. 14. THE CONTRACTOR SHALL ENSURE THAT ALL MATERIAL EXPORTED FROM THE SITE, IS DISPOSED OF AT A SITE PERMITTED TO ACCEPT SUCH MATERIAL. 15. THE USE OF REPAR, STEEL STAKES OR STEEL FENCE POSTS FOR STAKING DOWN STRAW OR HAY BALES, OR TO SUPPORT SILT FENCING USED AS AN EROSION CONTROL MEASURE, IS PROHIBITED. 16. THE CLEANING OF CONCRETE DELIVERY TRUCK CHUTES IS RESTRICTED TO APPROVED LOCATIONS ON THE JOB SITE. THE DISCHARGE OF WATER CONTAINING WASTE CEMENT TO THE STORM SEWER SYSTEM IS PROHIBITED. ALL CONCRETE WASTE SHALL BE PROPERLY CLEANED UP AND DISPOSED OF AT AN APPROPRIATE LOCATION. 17. PRIOR TO ACTUAL CONSTRUCTION, THE CONTRACTOR SHALL VERIFY THE LOCATION OF EXISTING UTILITIES. FOR INFORMATION, CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO AT 1- 800 -922 -1987. 13. CONTRACTOR TO FILE "NOTICE OF TERMINATION" WITH CDPHE ONCE PROJECT IS COMPLETE AND ALL DISTURBED AREAS HAVE BEEN STABILIZED INCLUDING TEMPORARY BMPS REMOVED. OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. REVISIONS DESCRIPTION REVISIONS COVER SHEET H J_ U 0 LL H- Z W >- 2 0 I- Q W LU Z I Y W 0 0 f1 co ce0 W N J Z W CD M N GARFIELD COUNTY, COLORADO drawn by: E0 checked by: WP approved by: LP 0A/QC by: WP projeclno.: 011 -2627 drawing no.: 011 -2627 CVR.DWG date: 02 -01 -2013 SHEET 1 of 7 PETROLEUM DEVELOPMENT CORP. Sec. 26 1/76 Section Lino /high, / W 1/4 Cox. Sec. 25, 1921 Brass Cop, 1.0" Pile of Stone, Steel Post ' SW Existing nce Fe Pr' Property Corner `w rr�� �^ (Set (Set by Others) , \--'-j xxv//- `y'� °_ LAND FARM LOCATED IN SECTION 25, T6S, R95W, 6th P.M. GARFIELD COUNTY, COLORADO N Sec. 25 1 S C A L E BASIS OF BEARINGS BASIS OF BEARINGS IS A G.P.S. OBSERVATION. N l/4 erty Comer by Others) 1/16 Section Line — - - �-�- 5x2 `� -Y -- 53oe erty Comes - —.SE 1/4— � Existing cee l:• S_ �' '''`Existing Drain - iL •:6�5T E fisting F Existing O inoge ° g ■ /B. og- ry ; gip sting a� eU g \ / B Pipe/ 0 li 1✓ P y 4O '/ ai' (Stby e/ \ / Exis prP Other irgngg Be isl /n9 U1� i Pipeline / 4/ // / / / / sz az r*'/87 / /. / P ° eW / e xo 10 �1 �+ 9 LAND FARM DESCRIPTION 11 SHADED AREA _ • T • S / REAS + — ✓' 5 tia a / . / xrsrmg 2 roe / CS S202/Y' s Hoe 5 19 e / 5198 i N N V / 9 �!/x ■ • o / ;',/ / / >' 9h'' �r /' / / 9� //,�A / // „92J i*' d0 / / / / s 9Ji 908// / 190 / / ,, BEGINNING AT THE SOUTHWEST CORNER OF SECTION 25, T6S, 9958, U.5.8. &M., THENCE ND0'S5'06 "W 489.40' ALONG THE WEST SECTION LINE OF SAID SECTION 25 TO THE TRUE POINT OF BEGINNING, THENCE N00'55'06 "W 834.01' ALONG THE SAID WEST LINE, THENCE N89'19'53 °E 986.57'; THENCE 549'01'03 'W 1289.08' TO THE POINT OF BEGINNING. BASIS OF BEARING IS A CPS OBSERVATION. CONTAINS 9.445 ACRES MORE OR LESS. POINT OF ,, 11 . r✓ �� BEGINNING / pie i 1 .080 Existing at dsrea / I ee 1 /' Pipeline I o9/ 3, 9 /r II -5 °° / er Fermi / e I! / 7 5186-- Th, ✓ ,109 / / /..'II / /1/ r Dk, 20:100 /� / / /��B 04 /Hoge /' ;Li" ting ' 1 / Existing L // / D xinage l / dx orae o , jam / I ✓/. Existing / / \\ Low Water \ •x sr /// �\ �� /' / Burs d= peline =Pipeline 70- �ExFsLing I \� Buried Ppeline/ / }e 51'io d - -- -- -� / I. Existing / e \ Section 25 Section Line WEST - 9280.00' (0.L.0.) r 2-noe 4/z.' ;,` \ Existing / p f1'I Improved '/ of / t1 g /'' Road einoge / \ \ I SW Cor. Sec. 25, 1921 Brass Cop, l.O' High Section 36 CERTIFICATE \Y�, II Existin \ Buried Ppeline r 4/ / / IYI / / / pR:WSnBx urou n,r s THE BEST or MY KNOWLEDGE AND BEU[F. N 0 /00i To / / / Sec. 35 / '^ Existing �� 41,940 0 NE 1/4 Sec. 36 101 roa Revised: 03 -16 -12 C.A.G. sTATF 410 Revised: 03 -13 -12 03 -19-12 UINTAH ENGINEERING 8 L(43 JII9 -90/7 85 SOUTH VERNAL UTAH• (84078289 -1917 9 —oriv N� = EXISTING POWERLINE --- X - - -M- = EXISTING BURIED PIPELINE = EXISTING FENCE NW 1/4 0 = PROPERTY CORNER (SET BY 019880) Kn 1" = 100' DATE oA 09 -18 -09 Pnxtt B.J. B.B. K.G. aEFGpL O,PLAT --- Rood I A = SECTION CORNERS LOCATED TMEWARM O TE2 3 1 8 1 112627_TBLOCK w NOT TO SCALE OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. REVISIONS DESCRIPTION LOCATION MAP } H J U LL H Z W O I- ce Q W LU Z W 0 0 O W N J 1- H z W U O N O O 0 J GARFIELD COUNTY drawn by: EO checked by: WP approved by: LP OA/QC by: WP project no.: 011 -2627 drawing no.: 011 -2627 LOCAT.DWG date: 12 -14 -2012 SHEET 3 of 7 112627_TBLOCK ON -SITE SWALE CENTERLINE EXISTING SWALE TO REMAIN 30' - X ( CELL #1 4.70 ACRES 7 � X L6 EXISTING SWALE TO BE DIVERTED AROUND SITE EXISTING FENCE (TO REMAIN) PROPOSED RIPRAP DIVERSION SWALE CENTERLINE SEE TYPICAL SECTION, SHEET 7 FIRE ACCESS ROAD EXISTING SWALE TO REMAIN 36.19' - 7- / x X Xz_ EXISTING SWALE TO BE DIVERTED AROUND SITE CELL ACCESS (TYP) 7' CHAIN LINK FENCE \ SEE SITE DETAILS, SHEET 7 f fi J I1X 1k \k\ 12" CMP CULVERT R 35' R3 EXISTING SWALE TO BE DIVERTED AROUND SITE 1 f CELL #2 1.97 ACRES \\ ./ �/ 7/ //f / / / //i N/ N / /// /" 6' CHAIN LINK FE CE / Z. / SEE 51TE. DETAILS, SHEET 7 / / 7 / EXISTING DIRT ROAD / I /// (TO REMAIN) EXISTING PIPELINE x kz<77 / / (TO REMAIN) / ON -SITE SWAX EXISTING / /77 7 CENTERLINE OVERHEAD / // * / / I POWER / \ (70 REMAIN)/ / 1, \ / R20' TYP / /// 12" CMP CULVERT (TYP) / / • Z.(70 REMAIN) /// \ /�/ EXISTING PIPELINE / // 30' SETBACK FOR ( DIVERSION SWALE SECTION LINE SWALE CENTERLINE SEE GRADING PLAN / / R30' �` 7.5' 20' MIN / / // 7 / / /// / /// / / / EXISTING PIPELINE / / (TO REMAIN) KZ ACCESS GATE / / / �/ /+ / // / / / �// + / / /777 ` R2 / R.2� .'�/ /'i- 10'x10' 18" LAYER TYPE L RIPRAP RUNDOWN i 10'(W)x20'(L) 24" LAYER TYPE M RIPRAP RUNDOWN R30' RETENTION POND 2" CMP CULVERT 0'x10' 18' LA R TYPE L P RUiiiiNN1 DOWN / 5' WIDE 3ERM SEE DETAIL, SHEET 7 / / / / / �/ //7 / / / / / / z // J / / z /77/ / 7 / 7 7/. EXISTING FENCE (TO REMAIN) / ROADWAY CENTERLINE LINE DATA TABLE NO. LENGTH BEARING START NORTHING START EASING END NORTHING END EASTING L1 824.57' NO' 00' 00 "E 13000.13 93453.58 13824.70 93453.58 L2 335.25' S49' 17' 36'W 13280.58 93453.58 13041.93 93199.44 L3 48.16' 549' 17' 36'W 13038.83 93204.01 13005.22 93187.50 L4 67.76' 589' 04' 54'W 12998.75 93145.23 12995.67 93077.48 L5 549.64' N0' 55' 06 "W 13030.10 93041.92 13579.67 93033.11 L6 385.90' N89' 20' 09'E 13615.23 93067.70 13619.70 93453.58 L7 337.98' N89' 20' 09'E 13619.70 93453.58 13623.62 93791.54 L8 460.64' 549' 17' 36 "W 13562.09 93814.77 13261.67 93465.58 ROADWAY CENTERLINE CURVE DATA TABLE NO. LENGTH RADIUS CHORD BEARING START NORTHING START EASTING END NORTHING END EAST1NG C1 24.31' 35.00' 23.82' 569' 11' 15'W 13005.22 93167.50 12996.75 93145.23 C2 54.98' 35.00' 49.50' N45' 55' 06'W 12995.67 93077.48 13030.10 93041.92 C3 55.13' 35.00' 49.61' N44' 12' 31'E 13579.67 93033.11 13615.23 93067.70 C4 55.50' 35.00' 65.77' S20' 41' 08'E 13623.62 93791.54 13562.09 93814.77 NOTE: ZONE DISTRICT IS RESOURCE LANDS: GENTLE SLOPES N 1 "= 60' 0 30 60 120' SCALE IN FEET Z F `" Q O0 0o cnN Ja O is_ OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. REVISIONS DESCRIPTION REVISIONS SITE PLAN H J_ U w H Z w O I- • Q w Z w O 0 0 0) 0 w N J 6- H z w 0 CI N GARFIELD COUNTY, COLORADO drawn by: checked by: approved by: OA/QC by: WP project no.: 011 -2627 drawing no.: 011 -2627 SITE.DWG date: 02 -01 -2013 ED WP LP SHEET 4 of 7 112627_PCONT PROPOSED DIVERSION SWALE -- (TYPE L RIPRAP) SEE TYPICAL SECTION, SHEET 7 ON -SITE SWALE PROPOSED DIVERSION SWALE (TYPE L RIPRAP) SEE TYPICAL SECTION, SHEET 7 EXISTING SWALE TO REMAIN " CMP CULVERT INVE • 5209.63 12" CMP CULVERT 5213 INV -.7-8 5212 12" CMP CIIiVERT / /'� THE EARTHWORK CUT AND FILL QUANTITIES ARE BASED ON INVERTk1T: 5204.82 / THE DIFFERENCE BETWEEN FINISHED AND EXISTING SURFACES /� AND ARE UNADJUSTED. THE ENGINEER DOES NOT GUARANTEE � // THAT THESE WILL BE THE ACTUAL EARTHWORK CUT AND FILL 12" CMP CUIJAERT /� 70 BE USED GENERATED DI ON -SITE. S. THE NUMBERS ARE NOT �� TO BE USED FOR BIDDING PURPOSES. THE CONTRACTOR INVERT IN 200.86 // SHALL BE RESPONSIBLE FOR PERFORMING HIS OWN DIRT / TAKE -OFF OF THE PROPOSED GRADING AND SHALL EVALUATE THE SOILS REPORT TO MAKE HIS OWN ASSUMPTIONS PRIOR TO L '� THE START OF GRADING. THE CONTRACTOR'S BID FOR SITE 1 / / GRADING SHALL ASSUME THAT ANY IMPORT OR EXPORT NOT 1 �� /� IDENTIFIED IN THE PLANS SHALL BE CONSIDERED INCIDENTAL 2 - -- / / TO THE BID, AND NO ADDITIONAL COMPENSATION SHALL BE PAID TO THE GRADING CONTRACTOR FOR HAULING OFF OR IMPORT OF FILL UNLESS MUTUALLY AGREED TO BY THE PROJECT MANAGER. SWALE / // // �/EARTHWORK VOLUMES: / // • //:// EARTHWORK DISCLAIMER: VOLUME CUT: 12871 CY VOLUME FILL: 10742 CY VOLUME NET: 2128 CY (CUT) 12" CMP CU 8ER INVERT OUT: 193.0 INV 0��L�a 2" CMP CULVERT INVERT IN: 5194.33 5' WIDE BERM SEE DETAIL, SHEEIT 7 / / / zzzz / / // /* / �/* / // /�/ / // /� / RETENTION POND STAGE STORAGE ELEVATION (FT) AREA (SF) VOLUME (CF) ACCUMULATED VOLUME (CF) ACCUMULATED VOLUME (AF) 5184 3658 0 0 0.000 5185 4439 4042 4042 0.093 5186 5288 4857 8900 0.204 5187 6193 5735 14634 0.336 5188 7155 6668 21302 0.489 5189 8174 7659 28961 0.665 5190 9249 8706 37667 0.865 5190 10380 9809 47476 1.090 5191 11568 10969 58445 1.342 6" LAYER CLASS 6 AGGREGATE BASE COURSE 10' VARIES ACCESS ROAD 2% 24" LAYER TYPE M SOIL RIPRAP 6" LAYER CLASS 6 AGGREGATE BASE COURSE 10' 2 1� NOTES: 1. ALL CONTOUR INFORMATION USED FOR DESIGN WILL NEED TO BE FIELD VERIFIED. 2. CONTRACTOR SHALL REFER TO THE STORMWATER POLLUTION PREVENTION PLAN, BY OTHERS, FOR DETAILS OF ALL BEST MANAGEMENT PRACTICES UTILIZED FOR THIS PROJECT. RETENTION POND TOP ELEV. = 5192.00 WSE ELEV. = 5191.50± V 2 2 --11 11- RETENTION POND RETENTION POND BOTTOM ELEV. = 5184.00 VARIES VARIES RETENTION POND SECTION 'A' NTS ACCESS ROAD 20 24" LAYER TYPE M SOIL RIPRAP 2 1� RETENTION POND TOP ELEV. = 5192.00 2 2 WSE ELEV. = 5191.50± RETENTION POND BOTTOM ELEV. = 5184.00 RETENTION POND VARIES RETENTION POND SECTION 'B' NTS 11— 1" = 60' 0' 30' 60' 120' SCALE IN FEET 8 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. REVISIONS DESCRIPTION GRADING PLAN PDC ENERGY CENTRALIZED SOIL TREATMENT FACILITY REVISIONS M N GARFIELD COUNTY. COLORADO drawn by: checked by: approved by: OA/QC by: WP project no.: 011 -2827 drawing no.: 011 -2627 GRD.DWG date: 02 -01 -2013 E0 WP LP SHEET 5 of 7 112627_XCONT 112627_PCONT 112627_TBLOCK 05 a xl —N o� EN 0 w In DI CO al 3or o2 v 02 05'- NN L N K I x 0 E 0 yo Q O /N N H � / N U LL w 00 24' ROADWAY CE VERTICAL & HORIZONTAL CONTROL TYPICAL ROADWAY SECTION MAIN ACCESS ROAD N.T.S. 5235 MAIN ACCESS ROAD 5235 0 +00 1 +00 2 +00 3 +00 4 +00 5 +00 6 +00 6 +50 SLOPE VARIES (3:1 MAX) 24' VARIES WAL ROADWAY I VERTICAL & HORIZONTAL CONTROL TYPICAL ROADWAY SECTION RETENTION POND ACCESS ROAD N.T.S. SLOPE VARIES (3:1 MAX) MATCH EXISTING 1" = 50' 25' 50' SCALE IN FEET RETENTION POND ACCESS ROAD 100' 5220 5220 0 +00 1 +00 2 +00 3 +00 3 +50 OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. REVISIONS DESCRIPTION PDC ENERGY CENTRALIZED SOIL TREATMENT FACILITY REVISIONS COLORADO GARFIELD COUNTY drawn by: EO checked by: WP approved by: LP OA/QC by: WP project no.: 011 -2627 drawing noS11 -2627 ROAD.DWG date: 02 -01 -2013 SHEET 6 of 7 1' -0" z z z z 8' -0" TENSION BAR 3/16" x 3/4" FLAT CORNER CLAMP ADJUST TO ANY ANGLE BRACE RAIL 1Y4" PIPE 1.35 # /FT #14 GA. WIRE 11ES 0 14" 0.C. 0.D. PIPE 3.12 # /FT LINE POST 2.375" EXTENSION ARM WITH (3) STRANDS OF BARBED WIRE TERMINAL POST 3.5" 0.D. PIPE 5.71 # /FT TENSION BAND ® 12" 0.C. MAX. CHAIN LINK FABRIC #9 GA. WIRE 2" MESH, TOP & BOTTOM SELVAGE TO HAVE TWISTED FINISH BRACE RAIL - 1.66" 0.D. PIPE 1.84 # /FT OR "H" SECTION 1.84 # /FT #7GA WIRE CUPS ® 1' -3" 0.C. MAX. END OR CORNER POST 3/8" ROD PRESSED STEEL CONNECTIONS & TURNBUCKLE TYP. EXTENSION ARM WITH (3) STRANDS OF BARBED WIRE FABRIC EDGE TENSION WIRE POST PLACED IN VERTICAL POSI11ON ® 10' -0" CC FABRIC TENSION WIRE FABRIC EDGE 3' -0" CORNER, GATE, BRACE & LINE POSTS 3" CLEAR FINISHED GRADE CONCRETE (SEE GENERAL NOTE 3) h12" 3 CLEAR (MIN.) SQ (MIN.) CHAIN -LINK FENCE POST SECTION NOT TO SCALE 10' ACCESS ROAD 2% PROPOSED FENCE VARIES 5' 0' -1o' I 10' 2" NOM. BOTTOM OF FABRIC TO - FIRM GROUND 10' 0" MAX. FINISHED o= GRADE 7 GA. TENSION WIRE W / #7 GA. 11E WIRES 0 18" 0.C. (TYPICAL POST ACING) ELEVATION - CHAIN LINK FENCE NOT TO SCALE 1.9" 0.D. PIPE 2.28 # /FT GATE FRAME ALL AROUND LATCH KEEPER & GUIDE #7 GA. TIE WIRES ® 1' -6" 0.C. SION BAND ® 12" 0.C. MAX. 4" 0.D. PIPE 6.56 # /FT GATE POST 7, -0" BRACE RAIL - 1.66" 0.D. PIPE 1.84 # /FT OR "H" SECTION 1.84 # /FT 2" NOM. - TENSION BAR 3/16" x 3/4" FLAT 3/8" ROD PRESSED STEEL CONNECTIONS & TURNBUCKLE TYP. 12" SQ POST & CONCRETE FOOTER SHALL MATCH TERMINAL POST GENERAL NOTES: 1. THE INCUNATION OF FENCE EXTENSION ARM IF SPECIFIED SHALL BE AWAY FROM THE ENCLOSED AREA UNLESS SHOWN OTHERWISE ON PLANS. 2. FENCING SHALL BE FABRICATED. FURNISHED AND INSTALLED IN ACCORDANCE WITH SPECIFICATION NO. 2520. 3. CONCRETE FOR FENCE POST FOUNDATIONS SHALL BE CLASS A2 IN ACCORDANCE WITH SPECIFICATION NO. 03300. 4. LOCATION OF FENCE, GATES, GATE WIDTH AND DIRECTION OF SWING SHALL BE AS SHOWN ON THE DESIGN DRAWINGS. ALL DIMENSIONS EXCEPT GATE WIDTH SHALL BE CENTER TO CENTER OF POSTS. 5. FOR FENCE GROUNDING REFER TO MANUFACTURERS SPECIFICATIONS. 6. ONE (1) FOOT EXTENSION ARMS WITH THREE (3) STRANDS OF BARBED WIRE SHALL BE INSTALLED ALONG THE ENTIRE TOP OF THE CHAIN LINK FENCE AND GATES. 10' 3 18" LAYER TYPE 'L' RIPRAP SWALE 1 VARIES (3 MAX) 1 10' no FINISHED GRADE VARIES 1' -6" MIN. 1" PIPE 1.68 # /FT PLUNGER PIPE SLEEVE PLUNGER CATCH 12" SQ. DOUBLE SWING GATE NOT TO SCALE ACCESS ROAD 2 2% 6" LAYER CLASS 6 AGGREGATE BASE COURSE 24" LAYER TYPE M SOIL RIPRAP TYPICAL RIPRAP DIVERSION SWALE SECTION RETENTION POND REINFORCED BERM NTS NTS RETENTION POND TOP ELEV. = 5192.00 2 —11 RETENTION POND BOTTOM ELEV. = 5184.00 a, RETENTION POND 12" SQ OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. SITE DETAILS PDC ENERGY H J_ U LL H z W 2 W J_ O 1n 0 W N J z W 0 0) z O 07 GARFIELD COUNTY. COLORADO drawn by: EC) checked by: WP approved by: LP OAiQC by: WP project no.: 011 -2627 drawing no.: 011 -2627 DET.DWG date: 02 -01 -2013 SHEET 7 of 7 CENTRALIZED SOIL TREATMENT FACILITY ACCESS ROAD PDC ENERGY PRELIMINARY PLANS LOCATED IN SECTION 25, TOWNSHIP 6 SOUTH, RANGE 96 WEST OF THE 6TH PRINCIPAL MERIDIAN GARFIELD COUNTY, STATE OF COLORADO GENERAL NOTES 1. ALL WORK WITHIN PUBLIC RIGHTS -OF -WAY AND /OR EASEMENT AND ALL ON -SITE UTIUTY WORK SHALL CONFORM TO THE TECHNICAL SPECIFICATIONS AND DESIGN CRITERIA FOR PUBLIC IMPROVEMENT PROJECTS OF GARFIELD COUNTY AND THE GRANTOR OF THE EASEMENT. 2. ALL MATERIALS AND WORKMANSHIP SHALL BE IN CONFORMANCE WITH THE LATEST STANDARDS AND SPECIFICATIONS OF THE APPROPRIATE GOVERNING AGENCY. THE CONTRACTOR SHALL HAVE IN HIS POSSESSION AT ALL TIMES (1) SIGNED COPY OF THE PLANS, STANDARDS, AND SPECIFICATIONS AS APPROVED BY THE APPROPRIATE GOVERNING AGENCY. THE CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FOR ANY VARIANCE TO THE ABOVE DOCUMENTS. 3. THE CONTRACTOR SHALL OBTAIN, AT HIS OWN EXPENSE, ALL APPLICABLE CODES, LICENSES, STANDARDS, PERMITS, BONDS, ETC. WHICH ARE NECESSARY TO PERFORM THE PROPOSED WORK. 4. THE EXISTING UTILITY LOCATIONS SHOWN ON THE PLANS ARE APPROXIMATE AND MAY NOT INCLUDE ALL LINES PRESENT. THE CONTRACTOR WILL BE RESPONSIBLE FOR CALLING THE UTIUTY NOTIFICATION CENTER OF COLORADO AT 1- 800 - 922 -1987 AND COORDINATING FIELD LOCATIONS OF EXISTING UNDERGROUND UTIUTIES PRIOR TO BEGINNING GRADING AND UTILITY WORK. 5. LOCATIONS AND ELEVATIONS OF EXISTING IMPROVEMENTS TO BE MET (OR AVOIDED) BY WORK TO BE DONE SHALL BE CONFIRMED BY THE CONTRACTOR THROUGH FIELD EXPLORATIONS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL REPORT TO THE ENGINEER ANY DISCREPANCIES BETWEEN HIS MEASUREMENTS AND THESE PLANS. 6. ANY CONSTRUC11ON DEBRIS OR MUD DROPPED INTO MANHOLES, INLETS, PIPES OR TRACKED ONTO EXISTING ROADWAYS SHALL BE REMOVED IMMEDIATELY BY THE CONTRACTOR. THE CONTRACTOR SHALL REPAIR ANY EXCAVATIONS OR PAVEMENT FAILURES CAUSED BY HIS CONSTRUCTION. THE CONTRACTOR SHALL PROPERLY BARRICADE THE CONSTRUCTION SITE UNTIL CONSTRUCTION I5 COMPLETE. 7. PRIOR TO BEGINNING THE WORK, THE CONTRACTOR SHALL OBTAIN ANY WRITTEN AGREEMENTS FOR INGRESS AND EGRESS TO THE WORK FORM ADJACENT PRIVATE PROPERTY OWNERS. ACCESS TO ANY ADJACENT PRIVATE PROPERTY SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS NOT OBTAINED BY THE OWNER OR OWNER'S REPRESENTATIVES AND PAY ALL FEES AS REQUIRED BY THE CONSTRUCTION COVERED IN THESE PLANS. 9. EXCEPT FOR MATERIALS DESIGNED TO BE RELOCATED ON THIS PLAN, ALL OTHER CONSTRUCTION MATERIALS SHALL BE NEW. 10. NO WORK SHALL BE BACKFILLED (INCLUDING BEDDING MATERIAL ABOVE THE SPRING LINE OF THE PIPE) UNTIL THE CONSTRUCTION HAS BEEN INSPECTED AND APPROVED FOR BACKFILLING BY THE APPROPRIATE GOVERNING AGENCY. 11. ALL WORK AND MATERIALS WILL BE SUBJECT TO INSPECTION AND APPROVAL BY THE OWNER OR THE OWNERS REPRESENTATIVE. 12. SHOP DRAWINGS AND MATERIAL SPECIFICATIONS SHALL BE SUBMITTED TO OWNER /ENGINEER FOR REVIEW AND APPROVAL PRIOR TO PLACEMENT OF MATERIAL. 13. ALL WORK SHALL CONFORM TO ALL LOCAL, STATE, AND FEDERAL APPLICABLE LAWS AND REGULATIONS. 14. ALL ESTIMATES OF QUANTITIES ARE FOR INFORMATIONAL PURPOSES ONLY. CONTRACTOR AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR DETERMINING ALL QUANTITIES. CONTRACTOR SHALL PROVIDE ALL WORK AND MATERIALS AS SHOWN ON THESE PLANS. 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR JOB SITE SAFETY OF HIS OWN PERSONNEL, ALL VISITORS TO THE SITE, AND THE GENERAL PUBLIC INCLUDING, BUT NOT LIMITED TO, TRENCH EXCAVATION AND SHORINGS, TRAFFIC CONTROL, AND SECURITY NOT LIMITED TO NORMAL WORKING HOURS. 16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ALL EXISTING FEATURES TO REMAIN THAT ARE DAMAGED DURING CONSTRUCTION ACTIVITIES TO EQUAL OR BETTER CONDITION, AT HIS OWN EXPENSE. 17. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL SITE IMPROVEMENTS (INCLUDING BUT NOT LIMITED TO: UTIUTIES, STRUCTURES, PAVING, LANDSCAPING, ETC.) SUCH THAT NO DAMAGE IS DONE TO SITE IMPROVEMENTS (I.E.: SAWCUTTING NEW PAVEMENT). SITE IMPROVEMENTS DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER. 18. IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE THAT A PRIOR UNIDENTIFIED SITUATION IS PRESENT, THE CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY. 19. THE CONTRACTOR SHALL REMOVE ALL DEBRIS RESULTING FROM WORK UNDER THIS CONTRACT TO A LEGAL DUMP SITE. 20. DIMENSIONS SHOWN ON THE PLANS ARE TO FACE OF CURB LINE IN CURBED AREA AND EXTERIOR FACE OF BUILDING, AND TO CENTERLINE OF UTILITIES, UNLESS OTHERWISE SPECIFIED. 21. USE ONLY DIMENSIONS PROVIDED ON THESE PLANS. DO NOT SCALE DRAWINGS. INFORM ENGINEER OF ANY DISCREPANCIES AND /OR MISSING INFORMATION. 22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ACCESS TO ADJACENT PARCELS DURING ALL HOURS OF OPERATION FOR THE BUSINESSES LOCATED ON THOSE PARCELS. 23. CONTRACTOR TO OBTAIN TEMPORARY POWER, TELEPHONE AND WATER FOR THE SITE. 24. CONTRACTOR MUST COORDINATE CONSTRUCTION WITH OWNER /ADJACENT PROPERTY OWNER'S CONSTRUCTION MANAGER. 25. THE CONTRACTOR SHALL OBTAIN A COPY OF THE STANDARD SPECIFICATIONS AND DETAILS OF ALL AGENCIES EXERCISING JURISDICTION OVER THIS PROJECT. A COPY OF THESE SPECIFICATIONS AND DETAILS SHALL BE MAINTAINED ON THE JOBSITE AT ALL TIMES. A COPY OF ALL APPLICABLE STANDARD DETAILS AND SPECIFICATIONS ARE INCORPORATED HEREIN BY REFERENCE. 26. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ADJACENT COUNTY ROADS FREE AND CLEAN OF ALL DEBRIS AND DIRT FROM THE JOB SITE. SHEET SHEET NAME NUMBER 01 1 SVY1 2 PP1 3 PP2 4 DT1 5 LEGAL DESCRIPTION VICINITY MAP NTS INDEX OF DRAWINGS SHEET DESCRIPTION COVER SHEET SURVEY PLAN AND PROFILE ALTERNATIVE NO. 1 PLAN AND PROFILE ALTERNATIVE NO. 2 DETAILS BEGINNING AT THE SOUTHWEST CORNER OF SECTION 25, T6S, R95W, U.S.B. &M., THENCE N00'55'06 "W 489.40' ALONG THE WEST SECTION LINE OF SAID SECTION 25 TO THE TRUE POINT OF BEGINNING, THENCE N00'55'06 "W 834.01' ALONG THE SAID WEST UNE, THENCE N89'19'53 "E 986.57'; THENCE S49'01'03 "W 1289.08' TO THE POINT OF BEGINNING. BASIS OF BEARING IS A GPS OBSERVATION. CONTAINS 9.445 ACRES MORE OR LESS. GRADING 1. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL PROPERTY CORNERS. ANY PROPERTY CORNERS DISTURBED OR DAMAGED BY GRADING ACTIVITIES SHALL BE RESET BY A PROFESSIONAL LAND SURVEYOR LICENSED IN THE STATE OF COLORADO, AT THE CONTRACTORS EXPENSE. 2. THE CONTOUR LINES SHOWN ARE TO FINISH GRADE FOR SURFACE OF ROADWAY, SURFACE OF LAND FARM, ETC. ALL SPOT ELEVATIONS SHOWN ARE TO FLOWUNE UNLESS OTHERWISE INDICATED. REFER TO TYPICAL SECTIONS FOR MULCH, SOD, PAVING, SLAB AND AGGREGATE BASE THICKNESS TO DEDUCT FOR GRADING UNE ELEVATIONS. 3. THE CONTRACTOR SHALL FINISH GRADE SLOPES AS SHOWN NO STEEPER THAN ONE FOOT VERTICAL IN THREE FEET HORIZONTAL. 4. THE CONTRACTOR SHALL CLEAN OUT ALL EXISTING AND PROPOSED INLETS, PIPES AND MANHOLES OF DEBRIS AND SEDIMENT AT COMPLETION OF SITEWORK. THIS WORK SHALL BE DONE TO THE SATISFACTION OF THE OWNER. 5. CONTRACTOR SHALL COORDINATE TESTING ACTIVITIES WITH THE GEOTECHNICAL ENGINEER. 6. ALL GRADING, COMPACTION, AND PAVEMENT CONSTRUCTION WILL BE IN ACCORDANCE WITH RECOMMENDATIONS FROM THE GEOTECHNICAL INVESTIGATION. GEOTECHNICAL STUDY NOTE 1. CONTRACTOR SHALL OBTAIN A GEOTECHNICAL ENGINEERING STUDY IF ANY STRUCTURES ARE PLANNED. EROSION & SEDIMENT CONTROL CONTACT LIST: OWNER: PDC ENERGY 1775 SHERMAN ST. STE 3000 DENVER, CO 80203 PHONE:(303) 860 -5800 CONTACT: RANDALL FERGUSON SURVEYOR: UNITAH ENGINEERING & LAND SURVEYING 85 SOUTH - 200 EAST VERNAL, UT 84078 PHONE: (435) 789 -1017 ENGINEER:. OLSSON ASSOCIATES 826 21 1/2 ROAD GRAND JUNCTION, CO 81505 PHONE: (970) 263 -7800 CONTACT: WYATT POPP, PE LORNE PRESCOTT 1. THIS PROJECT REQUIRES A PERMIT FOR STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITY FROM THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT. CONTRACTOR TO COMMENCE WORK ON THIS SITE ONLY AFTER AN ACTIVE PERMIT NUMBER HAS BEEN OBTAINED FROM THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT. 2. THE CONTRACTOR SHALL INSTALL EROSION /SEDIMENTATION CONTROLS PRIOR TO ANY SITE PREPARATION WORK (E.G., CLEARING, GRUBBING, OR EXCAVATION). 3. THE PLACEMENT OF EROSION /SEDIMENTATION CONTROLS SHALL BE IN ACCORDANCE WITH THE STORMWATER POLLUTION PREVENTION PLAN PREPARED FOR THE PROJECT BY THE CONTRACTOR. 4. CONTRACTOR TO ADJUST EROSION CONTROL MEASURES AS NEEDED FOR VARIOUS PHASES OF WORK. 5. CONTRACTOR TO ENSURE THAT NO DIRT AND SEDIMENT IS TRACKED ONTO ADJACENT ROADWAYS AND WATERWAYS. 6. APPROVED EROSION AND SEDIMENT CONTROL "BEST MANAGEMENT PRACTICES" (BMPS) SHALL BE MAINTAINED AND KEPT IN GOOD REPAIR FOR THE DURATION OF THIS PROJECT. AT A MINIMUM, THE CONTRACTOR SHALL INSPECT ALL BMPS EVERY 14 DAYS, AND AFTER ALL SIGNIFICANT PRECIPITATION EVENTS I.E. RAINFALL, SNOWMELT. ALL NECESSARY MAINTENANCE AND REPAIR ACTIVITIES SHALL BE COMPLETED WITHIN TWENTY -FOUR (24) HOURS AFTER DIRECTION BY THE INSPECTOR. ACCUMULATED SEDIMENT AND CONSTRUCTION DEBRIS SHALL BE REMOVED WEEKLY FROM ALL BMPS, OR AT ANY TIME THAT SEDIMENT OR CONSTRUCTION DEBRIS ADVERSELY IMPACTS THE FUNCTIONING OF THE BMPS. 7. TOPSOIL SHALL BE STOCKPILED WITHIN LIMITS OF CONSTRUCTION FOR USE ON AREAS TO BE RE- VEGETATED. ANY AND ALL STOCKPILES SHALL BE PLACED IN AN APPROVED LOCATION AND PROTECTED FROM EROSIVE ELEMENTS USING MEASURES SHOWN ON THE PLAN AND PROFILE SHEETS. 8. SOILS THAT WILL BE STOCKPILED FOR MORE THAN THIRTY (30) DAYS SHALL BE MULCHED AND SEEDED WITH A TEMPORARY OR PERMANENT GRASS COVER WITHIN FOURTEEN (14) DAYS OF STOCKPILE CONSTRUCTION. 9. ANY SETTLEMENT OR SOIL ACCUMULATIONS BEYOND THE LIMITS OF CONSTRUC11ON DUE TO GRADING OR EROSION SHALL BE REPAIRED IMMEDIATELY BY THE CONTRACTOR. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR REMEDIATION OF ANY ADVERSE IMPACTS TO ADJACENT WATERWAYS, WETLANDS, PROPERTIES, ETC. RESULTING FROM WORK DONE AS PART OF THIS PROJECT. 10. A WATER SOURCE MUST BE AVAILABLE ON SITE DURING EARTHWORK OPERATIONS AND UTILIZED AS REQUIRED TO MINIMIZE DUST FROM EARTHWORK EQUIPMENT AND WIND. 11. THE CONTRACTOR MUST KEEP ALL POLLUTANTS, INCLUDING SEDIMENT, CONSTRUCTION DEBRIS, AND TRENCH BACKFILL MATERIALS FROM ENTERING THE STORM SEWER SYSTEM AND ADJACENT WATERWAYS. 12. ALL SPILLS INCLUDING, BUT NOT LIMITED TO, PETROLEUM PRODUCTS, SOLVENTS, AND CEMENT SHALL BE CLEANED UP IMMEDIATELY. GARFIELD COUNTY ENGINEERING DIVISION SHALL BE NOTIFIED IMMEDIATELY. 13. THE CONTRACTOR SHALL ENSURE THAT ALL LOADS OF CUT AND FILL MATERIAL IMPORTED TO OR EXPORTED FROM THE SITE SHALL BE PROPERLY COVERED TO PREVENT LOSS OF THE MATERIAL DURING TRANSPORT ON PUBLIC RIGHT -OF -WAY. 14. THE CONTRACTOR SHALL ENSURE THAT ALL MATERIAL EXPORTED FROM THE SITE, IS DISPOSED OF AT A SITE PERMITTED TO ACCEPT SUCH MATERIAL. 15. THE USE OF REBAR, STEEL STAKES OR STEEL FENCE POSTS FOR STAKING DOWN STRAW OR HAY BALES, OR TO SUPPORT SILT FENCING USED AS AN EROSION CONTROL MEASURE, IS PROHIBITED. 16. THE CLEANING OF CONCRETE DELIVERY TRUCK CHUTES IS RESTRICTED TO APPROVED LOCATIONS ON THE JOB SITE. THE DISCHARGE OF WATER CONTAINING WASTE CEMENT TO THE STORM SEWER SYSTEM OR ADJACENT WATERWAYS IS PROHIBITED. ALL CONCRETE WASTE SHALL BE PROPERLY CLEANED UP AND DISPOSED OF AT AN APPROPRIATE LOCATION. 17. PRIOR TO ACTUAL CONSTRUCTION, THE CONTRACTOR SHALL VERIFY THE LOCATION OF EXISTING UTIUTIES. FOR INFORMATION, CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO AT 1- 800 - 922 -1987. 18. CONTRACTOR TO FILE "NOTICE OF TERMINATION" WITH CDPHE ONCE PROJECT IS COMPLETE AND ALL DISTURBED AREAS HAVE BEEN STABILIZED INCLUDING TEMPORARY BMPS REMOVED. OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. REVISIONS DESCRIPTION REVISIONS U W 0 Z Q W w Z 0 W U 0 0 Z aco cn W w W = U Q W 0 U H J_ U w H Z w >- 2 UI- O_ Q w w Z wH 0 0 0 U) 0 w N J Z W 0 M N GARFIELD COUNTY, COLORADO CALL UTILITY NOTIFICATION CENTER OF COLORADO 811 CALL 3- BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. d by _ CU checked by: DK approved by: WP 0A/QC by: WP project no.: 011 -2627 drawing no.: date: 02.01.2013 SHEET 1 of 5 Sec. 26 —SE 1/4— ( Buried &15 0 Ppeline Existing Road Existing Buried Pipeline Existing Drainage le Existing Low Water Crossing 1,48 Section Line Existing Drainage POINT OF BEGINNING W 1/4 Cor. Sec. 25, 1921 Brass Cop, 1.0' High, Pile of Slane, / Steel Post / Property Corner (507 by Others) 1 a Existing °9e ing A ` LH ~ Exisiing Drama ,, / �Exisfing Ory noge SW 1/4 fisting Fence \ \l, Pr erty Comer (Set by Others) 1/16 section Line E /sting l Existing 4., SHADED AREA T S REAS + 2 n9 4, tae; z Existing Bun Pipeline ea z /oe �s,q, / / 7, 2 / �// / �/� // / // / /istin9 1 / / / 2— Trgck> /f'/ ,, / s„ �.���Buried Ppeline // Existing 4 / &1 nag Existing loam tl Rood NE 1/4 Sec. 35 Section 25 Sec. 25 Section Line PETROLEUM DEVELOPMENT CORP. LAND FARM LOCATED IN SECTION 25, T6S, R95W, 6th P.M. GARFIELD COUNTY, COLORADO r S C A L E BASIS OF BEARINGS BASIS OF BEARINGS IS A G.P.S. OBSERVATION LAND FARM DESCRIPTION BEGINNING AT THE SOUTHWEST CORNER OF SECTION 25, T6S, 9959, U.S.O. &M., THENCE N00'S5'06 "W 489.40' ALONG THE WEST SECTION LINE OF SAID SECTION 25 TO THE TRUE POINT OF BEGINNING, THENCE N00'S5'06 "W 834.01' ALONG THE SAID WEST LINE, THENCE 08919'53 9E 986.57'; THENCE 549'01'03 "W 1289.08' TO THE POINT OF BEGINNING. BASIS OF BEARING IS A CRS OBSERVATION. CONTAINS 9.445 ACRES MORE OR LESS. SW Coo Sec. 25, 1921 Brass Cop, 7.0' High Sec. 36 NW 1 /4 Section 36 WEST — 528000' (G.L.O.) ] F.GFND: t♦ — — = EXISTING POWERLINE - = EXISTING BURIED PIPELINE --- x x- = EXISTING FENCE = PROPERTY CORNER (SET BY OTHERS) = SECTION CORNERS LOCATED CERTIFICATE THE BEST of Inv rcxom£cEATg BELIEF. Revised 03 -16 -12 C.A.G. Revised: 03 -13 -12 UINTAH ENGINEERING at LAND 6685160 85 SOUTH — 200 0A57 • (435) 789 -1017 VEItNAi, UTAH — 04078 00' pn 09-18-09 G.L cE .O. sPLAT WAR 2 3 1 8 1 w 10 a 0_ 20 N i� � v i t - 10' WIDE 24" LAYER TYPE M / "' \ V v � � -�-- _�� III // ,- �/�� EXTENDED 5' HORIZONTALLY INTO THE CREEK BED �� �� A� �� -��- V A v V \ HIGH PRESSURE GAS UNE / / / //,: SEDIMENT TRAP OUTLET PIPE // AN \ vV - `' °� �• v \ �v 1 \ � 42" LAYER TYPE VH RIPRAP J II. / INV. ELEV. = 5166.00 \ / \ \ \ ryt - - - - - - � \- _ \ \ - _ - ' \ \ i HIGH PRESSURE GAS LINE / - \ \ \ v 10' UPSTREAM OF CONCRETE. `_ _ SEDIMENT TRAP . , v -- v v A v _� V A v __ \\ \V ® O\OLSSON ASSOCIATES 4690 Table Mountain Drive, Suite 200 TEL 303.237.2072 Golden, CO 80403 FAX 303.237.2659 www.oaconsulting.com v LOW WATER CROSSING SEE DETAILS 4 AND 5 ON SHEET DT1 /vV _ _ _- - -- V I ) I _ V �- • \ \ ` �) / - _� - \ - - 1 \ \ SEE THE PLAN SET TITLED "CENTRALIZED SOIL TREATMENT \ I - \ _ - - - b��i a�. "`' N ASSOCIATES FOR ACCESS CORPORATION" _ - _ _ _ ROAD 1 - ���, - %/ \ T T OLSSON O \ (\ \ `/ \ .. \ �\/ X12 +00 13 +00_ - / ___4-- / �4 Sx0 \` / =/ ,\ \ '� OVERHEAD POWER \ \ \ \ \ - _ 10 +00 - - - -1Go I'Sa�Stu� r• s I I II / �i // -1 , / -- V V ACCESS ROAD DRAINAGE SWALE V A 1 ,, - / I bl { v / a x V / /U / /ll _ -, CONCRETE LINED A N / V A HIGH PRESSURE GAS LINE V v A I _ _ _ 250 LF SILT FENCE Il�lj/ %� LOW WATER CROSSING '/ v A v A v r v \ _ _ ---__ SEE DETAIL ON SHEET DT1 - b) // / / x- - - i Iv -- _ �-- / 0 _ - A _ �� - �� �� %// �Ia��� __ �✓ HIGH PRESSURE GAS LINE / / AA 1V DOWNSTREAM OF CONCRETE C417 I I - /fj 1 vAVAV LOW WATER CROSSING .. +00 _ 1 23 +00 - 1 24 +00 - '� 24 +75- - -- - / / // /l \ A A ___ 18 +00 19 +00 ; 20 +00. 22 +00 _ �v _ -_ J/ l /l/ i� �/ ,CHECK DAM _ fi , -T - / \ - -4. - - - // / / /i,_,\ \,- I__ _ - _ - -� -, s`�S ': ... . -. ... ....,._ . _ _ .... _ 1 / /// /rte // / /{f /7 _! -' / /SEE DETAIL ON SHEET DT1 / � � v V , _ _ _ // %� l///%// /� . _ �' I iy�„if /// V / / / HIGH PRESSURE GAS LINE I V �� A V A \ xv x, I ii /�j / - /__ l �� �� ■N v �_ - -� A i �i/ � / ACCESS _ _ _ - 1 ram f V -) ACCES ROAD \ v v 'V v v v v G/��/ / \\ \ \� N\ \ \\ I \ \� \\ \ \ \ \-- x \ �� -- __.._, td/J)1/ ( (III / \ \� \max �\ \ \ \ , \ \\� �\ _ ...,. N /:%"'':. • 38514 ! �1 13. ' SIONA4:: •••••• ^ n / *NOTE: // / SEE TYPICAL SECTIONS ON SHEET DT1 FOR ACCESS ROAD AND ROADSIDE SWALE SECTION. A / OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN DRAWING BEEN PLOTTED FR M THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. CENTERLINE DATA TABLE fif CURVE DATA TABLE HORIZONTAL: 1" = 60' VERTICAL: 1" = 10' NO. LENGTH BEARING START NORTHING START EASTING END NORTHING END EASTING L1 94.08' N52' 46' 44 "E 12212.77 92320.33 12269.68 92395.25 NO. LENGTH RADIUS CHORD BEARING START NORTHING START EASTING END NORTHING END EASTING L2 38.77' N30' 5V 12 °E 12297.98 92420.58 12331.25 92440.48 C1 38.21' 100.00' 37.98' N41' 49' 58 °E 12269.68 92395.25 12297.98 92420.58 L3 195.64' N53'16' 10 "E 12360.06 92466.49 12477.07 92623.29 C2 39.07' 100.00' 38.82' N42' 04' 41 °E 12331.25 92440.48 12360.06 92466.49 C3 37.81' 100.00' 37.58' N64' 05' 59 °E 12477.07 92623.29 12493.48 92657.10 0 30' 60' 120' SCALE IN FEET CALL UTILIQ�NOTIFICATION CENTER OF COLORADO UU II CALL 3- BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. �� L4 138.24' N74' 55' 49 "E 12493.48 92657.10 12529.42 92790.58 REVISIONS DESCRIPTION 0) Z 0 0) in Ce L5 696.53' N52' 22' 12 °E 12616.24 92965.86 13041.52 93517.49 C4 196.87' 500.00' 195.60' N63' 39' 00 °E 12529.42 92790.58 12616.24 92965.86 -- = =_ ` °- 5230 5220 5230 W 0 5220 N^. 5210 �z r - PLAN AND PROFILE ALTERNATIVE NO. 1 ACCESS ROAD DESIGN PDC ENERGY CENTRALIZED SOIL TREATMENT FACILITY GARFIELD COUNTY, COLORADO 2013 HIGH PT. ST 11+67.65 B 5210 HIGH PT LL 1' 5167.83 ii' 5200 • • 1(:913 1 a.00' i ao 5200 n n IA 1 VDI C, • ,a lO �L9 • 5190 5180 5170 ••. ..c•... INIIiiUJ•x•i• .11.1=11AS• ice•' �14IMMI "MIJi71y1ii. .111 lb C���' '!}7 �•�. °•• • X111 I5.1M -1 1 GiV � -- 5190 ?'� �il.•7,JM1y>i1M-�Lti•ti1∎101L ■Ili^ :i�•ll'F��WR sir s1 lL•J!•pl1�41 it sac Vf`.�'•J� im 11''._il Ef11�i7 �YI►�TYI. .. - _ i� w a.. _ �� •II �y ��rlGe� ijI'• �Ce�' JL'Jie1L'J ilei Ct �• L'i�il0 -I _ - WilFirl'•i1■1■PqFA�JR/!.'JF•• l9li- MEt.lirdE, !911��MJ IGe��I ��� n� In Sa1L^�S•11L^� 1:�� - -- 5180 R .9 i•VGi��•A 1•u•�� -al' l' - illp�llC�� 1----.- IlialMiiirliMMI ME 5170 1 E 5160 MI 5160 ''',.,� 5150 5140 ■ drawn CU 5150 checked by: DK approved by: WP OA/QC by: WP STA. 12 +49.90 TO STA 13+71_05 project no.: 011 -2627 drawing no.: 2Ll 9M= 'Ii li•1'MIT1I.1.eq.1Y271LL date: 02101.2013 SEE DETAIL 3 ON SHEET DT1 SHEET 3 of 5 5140 10 +00 15 +00 20 +00 25 +00 10 a CO 10 N N \''■ `, I' / IIII11` ( / li_ A �� AV - 1v �v INV. ELEV. = 5161.00 . 4- , / 10' WIDE 24" LAYER TYPE M RIPRAP // `��\ _ A v ` / N:12449.24 ,, r / / / ` �. l _ -� - V v v A /\ �� �� � E: 92551.40 III / .,� !/ '/ EXTENDED 5' HORIZONTALLY INTO THE CREEK BED / \\ \ \ \ \ \ "' "° �, \ _ _ HIGH PRESSURE GAS LINE - INV. ELEV. 5161.0011 /// SEDIMENT TRAP OUTLET PIPE �� v v V A A -- N• \ \ / N:12449.48 I INV. ELEV. = 5166.00 - - - - - - - - - - - - - - - - - -- - -. - - ' \ \ / HIGH PRESSURE GAS LINE \ \ \ EI . SEDIMENT TRAP A A V v E: 92545.90 / v v - V A A v V CHECK DAM- / '�' i� SEE DETAILS 4 AND 5 ON SHEET DT1 /" __ V I �, U� \T \\ \I 1 \ �- - -- �� - - - - - \ T \ / \ \ FACILITY, PETROLEUM DEVELOPMENT CORPORATION' BY 1 1 \ I ` \ \ \ \ ` _ , 52 +00 `53 +00 - I ` - -'(- - - \ \ / _ \ \ OLSSON ASSOCIATES FOR ACCESS ROAD CONSTRUCTION \ \ l \w a /��_.,./ A w -� - A 51 +00 z .�} \ 5 v 14, ,. 00 - A __� / OVERHEAD POWER \ V A �' 50+00 - -; - [Tj . -1 - i� A v v V A \ V I v V / - - _ -�- 4 - v / ' ACCESS ROAD DRAINAGE SWALE \ vv 4 " v ..._' k � ,.... _ v III fl T 1 - lIIG =- - V v - ES A HIGH PR GAS LINE V / /Ii V 1 \ SURE GA V A / \_ \ A � A _ � \ �� 250 LF SILT FENCE ..�- v 2x48" CMP` � V v� = -�. i ��- - \- L V - - - - - .__ S \ SEE DETAIL ON SHEET DT1 INV. ELEV. = 5158.00 \ -\6 +pp. .- - \ = - - } - = - \ - T \ - - - - 4, \ I ' - -- \ N:12388.32 ` 36" LAYER OF TYPE H RIPRAP - , \ - _ - - -� HIGH PRESSURE GAS LINE E:92543.28 EXTEND TO ELEVATION OF 5162 ON THE EAST - - \ _ - ' 00 60 +00 - _ -_ 61 +00`L10 _ 63 +00 :64 +00 - ..64 +75- - _ - - v ! "" " 8 AND 10' WEST OF THE WEST CULVERT EDGE ,,,.c57+ __ 58+00 - 59 +00 _: ` _--L _ -INV. ELEV. = 5158.00.- _ _�- - -�- - ,� - _ I _ - - - - - - / N:12388.08 - ., s,_ -__ - 9 _ { - ... . .. .,., ,. ._ �_. ... . .._. ... .7.. 4 -' _ 1 - �� I / E:92548.78 F� - / I / 1 iii /� v // \\ Yom, 1 ACCESS ROAD I/4 // i4/ /// \ V A V ' . - t --- "--- *--- "--- "-L- ._ -_*-__ - 1 -x • __ _• V A A �� - -- HIGH PRESSURE GAS LINE I \ �� \\ \ \ \ •\ 1\ 1 �� �V A V vv �v v - - -�- �--�_- v \ I V 1 V - - - --- v --- 4 - - \ v V ... -•; O /1 ' C' 4 ;o AII13,i S�4VN - " " "" __ / _( 1 "i- -- - x - - -*-- - - * / / // *NOTE: // SEE TYPICAL SECTIONS ON SHEET DT1 FOR ' ACCESS ROAD AND ROADSIDE SWALE SECTION. OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE C MMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. CENTERLINE DATA TABLE CURVE DATA TABLE HORIZONTAL: 1" = 60' VERTICAL: 1" = 10' NO. LENGTH BEARING START NORTHING START EASTING END NORTHING END FASTING L6 94.08' N57 46' 44 "E 12212.77 92320.33 12269.68 92395.25 NO. LENGTH RADIUS CHORD BEARING START NORTHING START EASTING END NORTHING END EASTING L7 38.77' N30• 53' 12 "E 12297.98 92420.58 12331.25 92440.48 05 38.21' 100.00' 37.98' N41' 49' 58"E 12269.68 92395.25 12297.98 92420.58 L8 195.64' N53' 16' 10 "E 12360.06 92466.49 12477.07 92623.29 C6 39.07' 100.00' 38.82' N42' 04' 41 "E 12331.25 92440.48 12360.06 92466.49 C7 37.81' 100.00' 37.58' N64' 05' 59 "E 12477.07 92623.29 12493.48 92657.10 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 3-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. 111" L9 138.24' N74' 55' 49 "E 12493.48 92657.10 12529.42 92790.58 0' 30' 60' 120' SCALE IN FEET 0) Z 0 0) w E L10 696.53' N52• 22' 12 "E 12616.24 92965.86 13041.52 93517.49 C8 196.87' 500.00' 195.60' N63' 39' 00 "E 12529.42 92790.58 12616.24 92965.86 5230 _ 5230 5220 W 0 5220 ,0,0 5210 �d corn M t01 p 5210 a 5200 5200 VPI STA. 58 +79.09 VPI ELEV• 5178 62 5190 5180 5170 K` 95 48 VPI STA: 56 +08.91 VPI STA: 51 +62.16 _ LVC: 100.00' .,L.: Vfl STA. 53 +14.13 VI'I STA. 54 +01.30 K. 208.96 rn.." ca # 0' a ca __ -- 5190 VPI ELEV: 5167.9: "PI E K - LVC: EV:- 5167 • _ •• e' ro �- - _ 1<.' 39 74 30,64 �. n c, n �, + LVC: 100.00' 100.00' • •. _ m 0 cn 7, - J Ol .• � to ii, Ih� • Q NJ W • Nd W 5180 m � ..r o J Z7) _ o * 3.Z i//W HJ HJ W�. - J dU S S g g' " 5170 5160 5160 5150 2x48" CMP drawn by: CU s'" - 275 -CFS checked by: DK 5150 approved by: WP 5140 OA/QC by: WP project no.: 011 -2627 drawing no.: date: 02.01.2013 SHEET 4 of 5 5140 50 +00 55 +00 60 +00 65 +00 CONNECT TO EXISTING A.• errIV,VVVW400" 24' ACCESS ROAD 2% VARIES 1:1 6" LAYER CLASS 6 1.1 AGGREGATE BASE COURSE WITH TenCate MIRAFI WOVEN GEOTEXTILE FABRIC OR APPROVED EQUAL CONNECT TO EXISTING �11 ACCESS ROAD TYPICAL SECTION STA. 50 +00 TO STA. 53 +50 �i Scale:1 " =5' CONNECT TO EXISTING — 2' MIN. es- 4 1 1 3' VARIES VARIES 24' ACCESS ROAD 2% 1:1 VARIES CONNECT TO EXISTING 6" LAYER CLASS 6 AGGREGATE BASE COURSE WITH TenCate MIRAFI WOVEN GEOTEX11LE FABRIC OR APPROVED EQUAL X21 ACCESS ROAD TYPICAL SECTION STA. 53 +50 TO STA. 63 +90 Scale:1 " =5' 30' 15' TYP. SEE PLAN AND PROFILE SHEET FOR LIMITS OF CONCRETE LOW WATER CROSSING CONSTRUCTION JOINTS', INSTALL PER CDOT STANDARD PLAN M -412 - 12' TYP. 1 X31 CONCRETE LOW WATER CROSSING TYPICAL DETAIL Scale:1 " =5' 12" THICK CDOT CLASS P CONCRETE LOW WATER CROSSING 10' FLOW 30' 10' FLOW v 1 y�,� N.. ,��' 1, 12" THICK CDOT CLASS P CONCRETE LOW WATER CROSSING 42" LAYER TYPE VH RIPRAP OCONCRETE LOW WATER CROSSING TYPICAL SECTION Scale:1 " =5 42" LAYER TYPE VH RIPRAP EMERGENCY SPILLWAY ELEV. = 5170.52 1:1 SLOPE SINGLE COLUMN OF FIVE 352" HOLES NO. 67 AGGREGATE FLOW „ VA 4" TYP. ELEV. = 5170.52 FLOW 2' ELEV. = 5168.52 v //v /,v'/ !i 'v// 8" PVC OUTLET PIPE CD 0.5% SLOPE MIN. X41 SEDIMENT TRAP PROFILE Scale:1 " =3' 30' 24" LAYER TYPE M RIPRAP MIN. ELEV. = 5171.52 MIN. ELEV. = 5171.52 ELEV. = 5168.52 / ? \ X51 SEDIMENT TRAP SECTION Scale:1"=3' WSE = 5170.52 v \\ \\. \\� \\ 2> / /\\� \ 15' VARIES — STORMWATER MANAGEMENT MANUAL EDITCH SUBEXCAVATE BELOW FLOWLINE CHECK DAM (RIPRAP) PDITCH FLOW___) L =THE DISTANCE SUCH THAT POINTS A 8 B ARE OF EQUAL ELEVATION. POINT A PROFILE VIEW ALONG DITCH FLOWLINE ROCK'A'�.��, 7�C B GEOTEXTILE EROSION CONTROL (CLASS 5) PROFILE RIPRAP CHECK DAM Rens., Date awcr.0 ISSUE W IC BNICIERING. NE REFERENCE: CDOT 2000 S MTANDARD PLA M 8, 0F 75 - 208 -1, SHEET NS 4 OF 7 FIGURE 1505 STORMWATER MANAGEMENT MANUAL SILT FENCE FABRIC ANCHORED IN TRENCH AND ATTACHED FIRMLY TO POST SILT FENCE 10' MAX SILT FABRIC STAPLED TO POSTS 24" MIN. COMPACTED BACKFILL POST (2" X 2" NOMINAL)......„ 42" MIN. 21" MIN. TRENCH SILT FENCE FABRIC ANCHORED IN TRENCH AND FIRMLY ATTACHED TO POST �6" x 6" TRENCH <FLOW 18 MIN. 0 SEDIMENT REMOVAL SHALL BE PERFORMED CONTINUOUSLY FOR PROPER FUNCTION. Notes: 1. Silt fence shou d not be used in areas of concentrated flow. 2. Where stormwater is within a Swale and a silt fence is used to trap sediment, the silt fence is to be reinforced such as with straw bales, or a double silt fence arrangement. RV 5c REFERENCE: COOT 2000 STANDARD PLANS M 85 STANDARDS M- 208 -1, SHEET 2 OF 7 FIGURE 1508 t ZLU v, 0 1- Q O0 tJf JQ OLSSON ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. J a H w 0 ACCESS ROAD DESIGN PDC ENERGY H J_ U Q w H Z W 2 Q W 0 (n 0 w N J a z w 0 GARFIELD COUNTY. COLORADO drawn by: checked by: approved by: QA/QC by project no.: drawing no.: date: CU DK WP WP 011 -2827 02.01.2013 SHEET 5 of 5