HomeMy WebLinkAbout1.15 Land grantsSTANDARD FORM 298 (112008) Pre8crlbed by DOl/USDA/DOT P.l. 96-487 and Federal Register NoUce 6·22·95 FORM APPROVED APPLICATION FOR TRANSPORTATION AND OMS No. 1004·0189 UTILITY SYSTEMS
AND FACILITIES ExpIres: November 3D, 2008 ON FEDERAL LANDS FOR AGENCY USE ONLY NOTE: Before completing and fiUng the application, the applicant should completely review this packAge
and schedule a Application Number preapplication meeting with representatives of tile agency responsible for processing the application. Each agency may have specific and unique requirements
to be met in preparing and processing the application. Many times, with the help of the agency DllteFiled representative. the application can be completed at the prctl )ioalian meeting,
J. Name and address ofapplicBnt (include zip code) 2. Name, tille, and address ofaulhorized agent if different from item I 3. TELEPHONE (area code) (include zip code) Art Smith Jimmy
Smith Applicant: ETC CAllyon Pipeline, LLC Wagon Wheel Consulting. Inc. Ar! Smith: 720·225·4011 1600 Broadway, Suite 1900 III E/tst 3rd Street, Suite 213 Authorized Agent Dem'er, CO
80202 RlOe, CO 81650 Jimmy Smith: 970-615·8433 4. As Applicant are you? (check one) 5. SpecifY what application is for: (check one) a. D IndividulIl a. D New Allihorizalion b. t8:J Corporation·
b. 0 Renewing existing Authorizalion No c. D Partnership/Association· c. 0 Amend existing 8ul11Orizatitli No, d. D State Government/State Agency d. 0 Assign existing authorization No.
e. D Local Government e. 0 Existing use for which no authorization has been receivcd. f. D Federal Agency f. ~ Other· • if checked, complete stlpplemental page • if checked, provide
details tinder item 7 6. If an individual, or pArtnership are YOII a citizen(s) of the United States? 0 Yes 0 No 7. Project description (describe in detail): (a) 1'ype ofsystem or facility.(e.g.,
canal, pipeline, road); (b) related slmctures and facilities; (c) physical specifications (length, width, grading, etc.); (d) term of years needed; (e) time of yea of use or opemtion;
(t) Volume or amount ofptoduct to be transported; (g) duration and liming of eonstmclion; and (h) temporary work areas needed for conslmclion (Attach additional sheets, iflldditional
spAce is needed.) ETC CAnyon Pipeline, LLC (UETC"), respectfully requests NEPA Categorical Exdusloll for the following proposed pr()ject: (a) Up to a 16" steel, burled, natural gas galhering
pipeline, (b) Typical above-ground flppurtcllances associated with pipelines such as IRuntilcrst rccch'ers, block valvesJ pipeline markers, flnd CP test StfitiOlIS (c) Pipelille Lellgth:
~ 2.6 miles ( .... 0.1 mile on nLM LAuds find --2.5 miles on Private Lands)J ROW width will consist ofa 30ft permanent easement and 1m additional 30ft temporary work space (d) 30-yeaf
term requested (e) Year·rOllnd operation (f) .... 45,000 to 100,000 IUseri'd depending OD operating pressures (g) IfapPl'oved, the construction phflSC ofthe pipeline will begin 1'1$
soon as reasonably possible, wUh construction duration of 4 weeks. (h) Use of temporary work ftreas is not anticipated. 8. AUach a map covering area and show location of project proposal.
A topographicRI base nlilp Is AttRched for yonruse. 9, Stllte or Local government approval: 0 Attached 1:8] Applied for D Not required Garfield COUll Administrative Permit Ci 'of Rifle
Watershed Permit 10. Non-returnable application fee: Attached 0 Not required I I. Docs project cross international bOllndal)' or affect international waterways? DYes 181 No (If")'es,"
indicate on mflp) 12. Give stfltement of your technic II! and financial capability to construct, operate, maintain, and terminate system for which authorizfttion is being requested.
Effective on November 5, 2001, CRuyon GRS Resources, LLC, R Delaware Limited Liability CompRuy, changcd its name to ETC CRllyon Pipeline, LLC ("ETC"). ETC's midstream business Is concentrated
In Utah Rnd Colorado, and consists of the construction, operation. and maintenance of midstream gathering pipelines, pr(lcesslng Rnd treRting facllllles. As such. ETC hAS the technical
capabilities necessary for the proposed acUon. This fomt is fluthorized for local reproduction.
13a. Describe other reasooablc alternative routes and modes considered. The proposed route utilizes existing pIpeline aud roadway corridorsJ therefore other routts were not consldcred.
Proper temporary and permanent BMPs would be installed to adequately protect Beaver Creek and the City ofRltle Watershed. b. Why were these alternalives not selected? 01l1l:r routes
would not follow uisting disturbance corridors. c. Give explanation as to why It is necessary to cross Federal Lands. The proposed pipeline must Interconnect to exlstlllg pipeline Infrastructures
located on Federal lands. 14. List authorizations and pending applications filed for similar projects, which may provide information to the authorizing agency(SpecWllUnlher. dare. code.
orname) SOllih Parachute Pipeline -COC-66335; Bentley Pipeline -COC-66088; Porcupine Loop -COC-SIOOJ 15. Provide stfltemcnt of need for project. including the economic feasibility and
items such as: (a) cost ofproposa\'ccl1s{n/Cl/olI, operaliO/I, olldma;ntellallce); (b) estimated cost of next best alternative; and (c) expected public benefits. ETC has the contractual
obligation to gather a producer's dedicated gas in Section 24 Township 7S Range 94W. The proposed pipeline would provide service to this producer Ilnd potentially other producers In
Ihe future. The utillziltion of existing tJislUrbance corridors And roads will minimize new disturbance. The capacity provided by a pipeline, up to 16" In diameter, Is expected to hrmdle
significant fulure volumes, which should minimize the need for pipeline looping. (a) $2,500,000 (b) NA (c) The new pipelinc construcllon allows an Increase In area natural gfls production
aud the pipeline size allows capRclty for fnture production in the artR, providing benefit to royalty owners and increasing the availability of natural gas and IUllural gas b),proclnets
to tOIlSllmers. 16. Describe probable effects onlhe population in the Area, including the social and economio aspects, and the nJrallifeslylcs. No effects arc anticipated on the population
within the project area. 17. Describe likely environmental effects that the proposed project will have on: (a) air quality; (b) visual impact; (c) surface and ground wHleT quality and
quantity; (d) the control or structural change all any stream or other body of water; (e) existing noise levels; and (1) the surface oflhe land, including vegetation, permAfrost. soil.
alld soil stability. No substalltlal effccts are anticipated. Appropriate mitigation measures will be applied. 18. Describe Ihe probable effects that the proposed project will have on
(a) populations offish, plRnllife, wildlife, and marine life, including threatened and endangered species; and (b)marlne mammals, including hunting, capturing, collecting, or killing
these animals. No substantial effeds arc anticipated. Appropriate mitigation measures wlll be appJied, 19. State whe~ter any hllzardous mille rial, as defined in this pmgraph ..... ill
be \lsed, produced. transported Of stored on or within the right·of-wIIY or any of the right·of-way facilities. or used in the construction. operation, maintenance or temlination of
the right·of·way or any of its facilities. ''Hazardous material" means any substance, pollutant or contaminant tbat is listed as hal..'lTdous under the COlnprehensiveEnvironmental Response,
Compensation, and Liability Act of 1980. liS amended, 42 U.S.C. 9601 et seq., and its regulations. The definition of hazardous substances under CERCLA includes any ''hazardous waste"
as defined in the Resource COIlS(:rvation and Recove'Y Act of 1976 (RCRA), as amended 42 U.S.C. 960 I eI seq., and its regulation~. The terlll hazardous materials also includes any nuclear
or byproduct materinl II!> defined by the Atomic Energy Act of J9S4. as amended. 42 U.S.C. 2011 el seq. The tnm doc.!! not include pelrOleum. includng enlde oil or any fraction thereof
that is not othen\1Se specifically listed or designated as a hazardous 5ubslance IIIlder CERCLA Section 101(14), 42 U.S.C. 9601(14), nor does the leoo include natural gas. There will
be no hazardous material(s) transportd acrou, contained within orslored upon the Right or Way. 20. Name all the Department(s) IAgency(ics) where this application is being filed. OrlgillAI
Filing with: Bureau of LAnd Management Glenwood Springs Energy Office 2425 S. Grand Ave" Suile 101 Glenwood Springs, CO 81601 I HEREBY CERTIFY, That I am of legal age and authorized
(0 do business in the State and that I have personally examined the information contained in the application and believe lliat the infonnAlion submitted is correct 10 he be \ knowledge.
Signature of Applicant Date Art Smith, Manager of En ineerin Pro' eets Tille 18, U.S.C. Section 1001, makes It a tme for any parso nd willfully to make to any department or agency of
the United States any false, fictitious, or fraudulent statements 01 representations as to any matter within its jurisdiction.
SUPPLEMENTAL CHECK APPROPRIATE NOTE: The responsible agencv(ies) will provide additional instructions BLOCK I -PRIVATE CORPORATIONS ATIA CIIED FILED" a, Articles oflncorporation 011
file fit BLJ\I D Bl b. Corporation Bylaws D 0 c, A certification from the State showing the corporation Is in good standing and is entitled b operate within the State. D Bl On flIe at
DLM d. Copy of resolution authorizing filing U D c. The nrune Bnd address of each shareholder owning 3 percent or more of the shares. tog:lhcrwith the number and percentage orany class
of voting shares of the entity which such shareholder is authorized to vote and the name and address oreach affiliate of tho entity together with, in the case ofan affilil'lte controlled
by thecnlity, the nnmber of shares and the percentage of any class of voting stock of D D Ihllt affiliate owned, directly or indirectly. by that entity. lind in the case of an affiliate
which conlrols that entity, the number ofsilares and the percentage of any class of voting stock of thai entity owned, directly or indireelly. by the affiliate. f. If application is
for an oil or gas pipeline, describe any related right·of-way or temporary use pcmlit applicatims, and identifY D D previous applications. g. Ifflpplication is for an oil and gas pipeline,
identify all Federal lands by agency impacted by proposal. D [J 11-PUBLIC CORPORATIONS a. Copy of law forming corporation U 0 b. Proofoforg!lnization [J U c. Copy (If Bylaws D D d. Copy
of resolution authorizing filing D 0 e. If application is for an oil and gas pipeline, provide information required by item ''If'and "l-g" above. D D III -PARTNERSHIP OR OTHER UNINCORPORATED
ENTITY II. Articles of association, ifany U 0 b. If one partner is authorized to sign, resolution authorizing action is U D c, Name and address of each participant. partner. association,
or other D D d.lfapplication is for an oil and gas pipeline, provide infonnlltion required by item "If' and "I-g" above. D D • If Ihe reqUIred mfonnatlOn IS already filed with the agency
processmg this application and IS current. check block enlltled "F,i'l ed. " PrOVide the file IdentlficallOn infonnatioll (e.g., number, date, code. name). Tfnot on file or current,
athlcb Ihe requested infornlalion.