Loading...
HomeMy WebLinkAboutConditions of Permit.pdfCONDITIONS OF PERMIT BLCO-9-13-2991 Howdy Robertson Warehouse/Storage Building 1879 CR 264 Rifle, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC, AND THE MANUFACTURERS INSTALLATION SPECIFICATIONS. 2) ALL WORK SHALL COMPLY WITH THE CURRENT LAND USE CHANGE PERMITS. 3) REVIEWED AS SEPARATE BUILDINGS, TYPE SB CONSTRUCTION, S-l OCCUPANCY. PER IBC, TABLE 705.8, OPENINGS ARE NOT PERMITIED AT ADJOINING WALLS. EXTERIOR SHEETING IS REQUIRED PER MANUFACURER, SPECIFICALLY AT ADJOINING WALLS. 4) CONTACT LOCAL FIRE DISTRICT FOR SPECIAL REQUIREMENTS PRIOR TO CONSTRUCTION. FIRE DISTRICT FINAL APPROVAL IS REQUIRED FOR CO/FINAL INSPECTION. 5) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR. FINAL APPROVAL REPORT IS REQUIRED AT FRAME INSPECTION. 6) LOCKS, LATCHES, AND LANDINGS PER 20091BC, SECTION 1008. 7) LIGHT AND VENTILATION PER 20091BC, CHAPTER 12. 8) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED PRIOR TO FRAME INSPECTION. 9) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR CERTIFICATE OF OCCUPANCY.