HomeMy WebLinkAboutRock Solid Solutions- Certificate of Compliance.pdfTo: Project: RE: Rocky: DESIGN' BUILD Rocky Gabossi Certificate of Compliance October 14, 2013 Red Canyon Road Storage Facilily, Rockfall Catchment Fence; Glenwood Springs Colorado Cert
ifi cale of Compliance for Fence Construction Rock Solid Solutions, as the rockfall catchment fence installer, completed construction in accordance with the specifications provided in
the design by ROTEC International. Rock Solid was responsible for the cable anchorage systems. Twelve ground anchors were installed at the locations shown on the drawings. The anchors
were installed using a Marini wagon Drill with a 4" dia Down Hole Hammer to drill the holes 12 f\ deep, the anchors supplied by ROTEC International were installed in the holes and the
holes tremie grouted with a neat Portland cement to the surface. See Photos anached. The fence system was installed and inspected by the Manufacturer ROTEC International. The fence anchorage
system was installed in accordance with the Manufacturer's speci fi cations and as such shall meet the required speci fi ed design capacity. Rock Solid also assisted the owner, Mr. Gabossi
during the post installation to assist in inspecting the posts installation, alignment and orientation. The post holes were drilled by a caisson drilling contractor out of Utah and Pitkin
Iron placed the posts and concrete for that work. In our opinion, the fence posts were installed in accordance with the manufacturer's specifi cations as well. RSS is confident that
the fence anchorage system constructed for the Gabossi Storage Faci lity will meet the des ign requirements. The anchorage des ign and installation of the rockfall catchment system for
the proj ect anchorage and installation w ill meet or exceed the design requirements set forth by ROTEC International and HP Geotech for the project. Please call Or email if you have
a,n y questions. Respectfnlly .. . ... .. . ", . : .1. { . ~ ~.~. ,~/./,!? :-. . ..10 .. ,, ~ Donald J, .Berger, y. fl:'~:,'; Presideiilf . IinSi.! ."'5 "'I' , '. It" Rock Solid Solutions.
(970) 987-i'743 ' 195 Lodgepole Circle, Parachute, CO 81635 Office: (970) 987-4247 Fax: (970) 712-5715
· Gabossi Storage Facility; Rockfall Catchment Fence; Glenwood Springs, Colorado Photo #1-Rockfall Catchment Fence cables to Anchorage System South End Photo #2 -Fence at South end Page
1 of 1
Gabossi Storage Facility; Rockfall Catchment Fence; Glenwood Springs, Colorado , ' ~·~:~:·~~t:1:' t -~~·t J.'-':"~ ,;,'.:d :~~c;~::::-;~j, ~ .'.~~~j ." (:. .:; : . . , Photo #3 -Rockfall
Catchment System looking South from Red Canyon Road Photo #4 -Fence with Storage Area bench below Page 2 of 1
· Gabossi Storage Facility; Rockfall Catchment Fence; Glenwood Springs, Colorado Photo #5 -Fence alignment adjacent to Red Canyon Road Photo #6 -North End of Fence Page 3 of 1
:Gabossi Storage Facility; Rockfall Catchment Fence; Glenwood Springs, Colorado Photo #7 -Fence with Storage Bench Below Road Page 4 of 1
September 12, 2013 Rock Solid Solutions 195 Lodge Pole Circle Parachute, CO 81635 Attention: Subject: Mr. Patrick Breagy Grout Cubes Gabossi Fence Project Glenwood Springs, Colorado
Project No. GS05650-365 1r CTLI~HOMPSON As requested, we have performed compressive strength testing of grout cubes cast by your personnel on August 29,2013 during grouting operations.
The specified strength is 3,000 psi at 28 days. Below are the results of the 14 day compressive strength tests. The 28 day results will be presented upon completion. Age Dimension Compressive
Cube No. Strength (days) (inches) (psi) 1 14 2x2 3,000 We appreciate the opportunity to work with you on this project. If you have questions or we can be of further service, please call.
Very truly yours, CTL I THOMPSON, INC. I};JJ~'A-I Dan Downing Laboratory/Field Manager DD:cd