Loading...
HomeMy WebLinkAboutEmail Correspondence.pdfJim Wilson From: Sent: To: Cc: Andy Schwaller Tuesday, September 10, 2013 1:29 PM Jim Wilson; Matt Provost David Bartholomew Subject: Building Permit 6-13-2883 100 Riverbend Way Ironbridge They amended their permit to include the repair of gas water and sewer lines. I lined AOK Plumbing out to call for inspections. Thanks, Andy l/;I!jJ£K C-tf:OtJ;r/V nif;11pIAJG-w/ls /!fI:3 lAl-i/Cf/+--Coi/lCK/rp WIt? Jim Wilson From: Sent: To: Jim Pidcock Uim@highmarkaspen.com] Wednesday, August 28, 2013 2:27 PM Jim Wilson Subject: 100 River Bend Attachments: 100 River Bend-Post Lift Stuctural Engineer Report. pdf; 100 River Bend Final Engineer's Report.pdf Jim, Per your request, I spoke to Source Gas. They do not have a form to send to you to approve the gas service, but they inspected it last week. Lorenzo (Technician) said that he would send you an e-mail stating that he has inspected the service line to the house, should you request one. Xcel was at the house and they also inspected the utility trench. They are fine with what is happening at the house. We did not ask them about the transformer, but asked the homeowner to do so. Attached are 2 reports from the structural engineer, post-lift. I have a wet stamped copy being sent to me, which I will submit to you for your records. The H20 curb stop was replaced a couple of months ago by the local water department. They will have a record of that work. The sewer pipe will be checked with a camera next week by the plumber. We will verify the results. Please let me know if you need anything else. Regards, Jim Jim fidcock High Mark Construction Compan!.J f.O.!)ox2121 Aspen, CO 81 61 2 970-;' 79-5 6 17 Cell 970-9+5-58880Uice/Fax ,)im@HighMarkAspen.com www.HighMarkAspen.com 1