FIRST AMENDED
LAND USE CHANGE PERMIT
issued to
Bargath LLC
for the
Parachute to Noble Pipeline
(County Project No. PDPA 6999)
In accordance with and pursuant to Article IX of the Garfield County Unified Land Use
Resolution of 2008, as amended, the Director of the Building and Planning Department
hereby authorizes, by this Administrative Pipeline Development Permit, the following
activity:
Amend the approved Williams Production RMT
Parachute to Noble Pipeline by abandoning and
removing a portion of the existing 12" pipeline
that crosses the Colorado River and constructing
0.51 miles of new 12" pipeline with an
alternative alignment located in the SW1 /4 of
Section 13 and NW1 /4 of Section 24, T7S, R96W,
6`h p.m,
Garfield County, Colorado.
This Administrative Permit is issued subject to the conditions set forth in Exhibits A -C
(attached hereto) and site plan/profile set forth in Exhibit D (attached hereto), and shall be
valid only during compliance with such conditions and other applicable provisions of the
Garfield County Unified Land Use Resolution of 2008, the Building Code, and other
regulations of the Board of County Commissioners of Garfield County, Colorado.
BUILDING AND PLANNING DEPARTMENT,
GARFIELD COUNTY, COLORADO
Fred A. Jarman, AICP
Building & Planning Depart t, Director
Date
/U
�IIl ill ih 1 ■lM:Mll ifirrliirIARI iw :lgit 'il 11111
Reception #: 809190
10112/2011 09:42:15 AM Jean A1berico
2 of 10 Rec Fee :$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
FAO ltA
1. Any equipment. used in construction or operation vf'a pipeline must comply with
the Colarade Oil and Gas Conservation Comm,ssk,n Rules and Regulations,
Section 602, *Ise Abatement Addhronally, a1f power sources used in pipeline
operations shall have electric motors o mufed Tfemai eeMbustion ernes.
2. Pipeline operations shad be located !l1 a marthevtb minimize their visual impact
and disturbance of the lend Sulam. FaC11i1Ms shall be painted in a uniform, non -
contras(ing, norKetlectrve color, ta blend with the adjacent landscape. Rightrof-
way shad be located &7. exist* g disturbed areas unless safety or visual concerns
or other adverse ce impacts pfeprly d ate otherwise.
a All "special provteJons" ,speailed in the tarfield County Road and Bridge
Department's uN ICy permit mgl5esatlsfled (See Exhibit and Exhibit C).
4. All acCbss and oversize , r Overweight vehicle peimits'_shel/ be obtalned/torri Lie
Coern y Road &: Bridge Department prior to beginning tion -Any new roads
or intensified driveway aooesses. created ea a re** of the pipeline construction,
intended to be permanent for malntenanoe: and repair operegr ne shall be placed
behind a lacked gale or other-hoofers preventing use by recreational vehicles
Any gates orbartier$ need to-be consistent with the siege comer's preferences.
S. Revegetetoe aloes the pipelne corzidrr and along the ;f ur?ty d for the
crDssinga shall be tequlred to be approved by Garfield County Vegetation
Manager and the ROW restoration will be approved by Barfield C Unty IRoad &
Bridge Department representative.
6. All vehicles working within Garfield County. Right of Was will be Weasel and
registered in the State. of Colorado. All vehicles hauling egwigrnenf and Materials
for the pipeline constn,adon will abide by Garfield County Road & Bridge
Departments oVersrzelayetweght regelatlans. ,4i1 vehicles regWring an
ovafsize/overwelgirt pe It 011 Send a letter showing pmts.? that they can'operate
under ,a knob n bard holder on file with Garfield COmity Read & ar dge
Depertrnetit.befete a ,peri `w'll be. tssrrOri
7, A ROW survey thawing the pipeline location and 0 tea* control plan will be
submitted to Garfield County Read & Bridge Department prior to Starting the
pmject: In addition, the applicant shall provide digital `as -bu:lr drawings to be
provkfed to the County upon completion.
8. The applicant shall construct a Weshing station w:Nl west, vehicles and
equipment prior to ,entering end exibing,me work age, Plass, connect the Garfield
County Vegetation Manager at 6254601 when the suctions are On site.
9. The Applicant shall . provide the County With a revergetation security for fee:;l&Ids
in the amount of $2,50000 per sem disturbed on private land. The applloant has
indicated that 7317 cures of private land will be disturbed. Based on them
figures, the applicant must provide a revegetation security in the amount of
$18Z925. The seed mix in the Plan shall match the seed mix used m the. field.
1
1111 le I 11111
Reception#: 809190
10/1212011 09:42:15 AM Jean Alberlco
3 of 10 Reo Fee :$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
the field Seed mix containing yellow sweet clover (Meltlotus olkinalfs) or annual
yellow sweetcfover (M. lndious) shall not be use The amount of seed specified
to be planted in the Platt shall match the quantity of seed used in the mod The
secudty shall be held by Garlleld: County until vegetation has been successfully
reestablished according to the Reclamation Standards is the Garfield County
Weed Management Plan. It Is the responsibility of the applkent to contact the
County, upon suo essful temptation establishment to request an inspection for
security release consideration.
10. The Applicant shell provide the Courtly with a digital alignment of the pipeline
once constructed to e format readable to the County.
11. In no case shall an operator engage in activities which impact Federal or State
Threatened and endangered species.
12. Air contaminant emissions shall be in compliance with the applicable permit end
control provtsivns of the Colorado Air Qualrty Control Program, Me 25,
Resolution '7 C.R.S.
13 All opetatlons shall comply with all appIk,bl� Federal arid-.State Publk Health
andEnvlronnrant, Noise, and Air and Wale :Quality Coribvi- standard.*.
14. Should an abandoned pipeline be removed, !t wh be subject to the original
revegetation and weed management requirements in the original application.
2
1111 MeV u II I
Receptionq: 809190
10112(2011 09:42:15 AM Jean Alberico
4 of 10 Ree Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
Garfield .Cozen , J
To: BOCC
Re: Williams Pipeline Request
Date: November Si 2006
BOCC:
Jtoad andi3ridlge D_ epar� rent
0567 CottrltyRoad 352
Williams Gathering Division of Williams Producthn has rerptested pettoiss ou tiff ostai1
three pipelines is a single trench within the County ROW along Cr-300 'arachute Ona
Road). The pipelines will include a 12-inchbigh pressure .gas, a 16-mob I*w suie gas
and a &- ilia► water fine to li ultrfle need for water.t rucks.:'Theare wtl! alouto a d' bore
under Cr. 300 on the cast end of the pipeline to turn the' pipeline to cross the Colorado
River Ihe length of the pipeline within the County,ROW will be 5625 .feet; The water
lute will be cased and vented .to atmosphere.
Williams has made many atteJripts to seek private easel eat for the' installation of this
pipeline and hale inadel agreements with. some lendo'wnei outside of our ROW, but no
agreements can be reached for tbia section ofthe pipeline. For this rat Williams is
requesting permission to install this section of pipelines within the Comity ROW.
Williams will submit certified traffic control plan to Geld County Road & Bridge
Department. No ttencbes"will be Left open and certified traffic cont[ui Will be usita at all
times during working hours. Winiams will Mars this section of with a 4-inch mat
after completion of the pipeline, The approximate M fir the protect is August 1,
2006. The project will be completed with the paving before the frost season.
Garfield County Road &-Bridge Department recom tends approval of this request with
adherence to all provision s specified by the issued utility pertbit and any
recommendations made lay the DOCC.
Jake B. Mail Marvin Stephens
Administrative Foreman Road and Bridge Director
Garfield County Road & Bridge Dept. Garfield County Road & Bridge Dept.
PO. Box 426
Rifle, CO 81650
Phone: 97o- 625 -8601, Pax: 974425 -8627
IK�r'rv,irmii • ill
Recept ion# : 809190
10/12/2011 09:42:15 Aft Jean Alberico
5 of 10 Reo Fee:$0.00 Doc Fee:0 00 GARFIELD COUNTY CO
Special Provisions for Pipeline
1. Starting date. Within 14 days after issuance of utility permit by Cratfield County
Road &Bridge Department.
2. Complefion Date; 90 days after connsrtoncoment, wee r.pee !miring. If
project is not completed within the , days the contractor will apply to
Garfield County Road & Bridge Department for an extension to the permit.
3. Metter oa ered t for construction purposes will be submitted to Garfield County
Road & Bridge Department in the amount of S65,000.00 (Sixty Five Thousand
Dollars), The letter of credit will be held for one year after completion of the
project.
4. Company will furnish on electronic foimart.to .Garfield County d. :& Dddge
Department an as- built survey upon completion of the project.
5. CoAlliactor wall. furnislt:to Garfield County Road $ridge Departaaeat a .list of
contact names and-numbers of all companies working bathe project. Garfield
County Road & Bridge Department will finnish to contractor the same.
6. A traffic control plan will be submitted and approved by Garfield County Road &
Bridge .Department prior to permit being issued:
7. The buried depth of the pipeline shall be 64-inches to tap: of pipe _within County
Right of Way.
8. & 00J me 1 ute Una Road will be kept open to traffic at all time& Raffle
delays of 10 minuets are acceptable, except for emergency vehicles. Road
crossings will . be bored. lfbore fails 3 times or boring tool becomes stuck, road
way may be cut with special permission of Garfield County Road & Bridge
Department.
9. Affected areas will be,graded and shaped to include road surface and barrow
ditches. This will include replacement of road surface with a 4-inch asphalt mat if
contaminated or deemed ne easalry by Garfield County Representative. Areas of
construction will be inspected and approved by Garfield County Representative.
10. Backfilling will be with excavated and imported material at 95% compaction with
moisture. Testing intervals will be determined on site by Geo-Teeh hired by
contractor and agreed to by Garfield County representative. Test results will be
11. sent to Garfield County Road & Bridge Department, P. 0. Box 426, Rifle, CO
81650 to be reviewed and approved by Garfield County engineering department
1111 r• iliON i# 11111
Reception #: 809190
10112/2011 09:42:15 AM Jean Alberico
6 of 10 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
12. Rocks exceeding 10-inches in diameter shall 1tererriioved from site. It is the
mittractar's responsibility to Locate place to discard rocks.
13. Affected areas outside of road driving surface will be reseeded with a mix
submitted by contractor smd approved by Garfield County Vegetation: Manager.
Contact Steve Anthony at 970-625-8601 Ext. 105 or 970-37946C List plant
Material, be speeific (scientific and common names required). Planting schedule
(to include timing and methods). A rnap of area impacted (where the SOH will
be (hsturbed).
14. A letter of Credit for revegatttion will he submitted ,to Garfield County Vegetation
Department in the amount of$8000.00 (eightthotyswld dollars). After:initial
planting 'letter of coedit will held for It maximum of two years.
15. Contractor will notify Garfield Cotmty Road & Bridge Aepartmeut 48 hours prior
to starting project.and of any problems arising during the prQject..Contact Jake
, Vlall:at:970 25-8601 Ext 164 or 970- 618 =61
16, Glut* 'County Road A Bridge Department reserves the right .- to,shut the project
down if road :damage sta<rtsto actclr, dust becomes ap 1 n t: during ::inclement
weather -MO could etoine.: a suety issue for the traveling public.
17. Garfield County Road & Bridge Department representative will do a final
inspection upon completion of the project. :.
18. Vehicles and equipment used by employees c( acting the pipeline will be
hemmed and regittered in the state of Colorado.
19. AU vehicles transporting equipment and material used for the project will abide
by Garfield County's o iersizetot+erweigl t regulations afld follow' approved haul
mutes..
20. A letter of commitment stating that the asphaltrep1acementwlll be in place prior
to the frost season.
21. Utility permit wilt'be issued upon approval of Oil Admi tistratiVe review process.
• 1111 rm. 11,11E14IMK LI LI'lhLtALUV AIIN 11111
Reception : 809190
10/12/2011 09:42:15 AM Jean llberico
7 of 10 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
r
Garfield County
To: BOCC
Re: Williams Pipeline Addition Request
Date: November 8.2006
BOCC:
Road and Bridge .Depa mem'
0567 County Road 352
Williams Gathering. Division of Williams Production bas requested Peru fission for an
addition to install thaw pipelines in a single trench within the County ROW along Cr. 300
(Parachute trna Road). The pipelines will include a 12 -inch high pleasure gas, a 116 -inch
low pressure gas and a 44inch water line to limit the ;need for water trucks. There will also
be a road bore under Cr. 300 an the east end of the pipeline to turn the pipeline to cross
the Colorado Itivtit, The length of the pipeline within the CountyROW wilt be 2709 -feet.
The water line will be.eased and vented to,etmosphere.:
A land owner that Williams made an agreement with has decided not to allow this section
of pipeline on his property. for this reason: Williams is requesting perimssion to install
this section of pipelines Within the County ROW.
Williema will submit an updated certified his control p lan -tit include 64 sct{On of
pipeline 'IA Garfield County Road & Bridge Department. No trenches will be le open
and certified traffic, control will be onsite at all thins during working hours, Williams will
repave thiasection of'road with a 44mcli mat after compleiionof thapipeline. T'he
approximate start date for the *Oct is October 2606. The project Will be completed
before the frost season. Due to asphalt constraints the paving may have to take place in
2007 with necessary road repairs made in 2006.
Garfield County' Road & Bridge Deportment recommends approvalof this request with
adherence to all provisions specified by the issued utility permit and any
recommendations made by the DOCC,
Jake B W1 Marvin Stephens
Administrative Foreman Road and Bridge Director
Garfield: County Road & Bridge Dept. Garfield County Road & Bridge Dept.
■IIIl 'iFIAIMM I WiMrRf iNI *CNN 111 111
Reception #; 809190
10/1212011 09:42:15 AM Jean Alberlco
8 of 10 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
Special Provisions for Pipeline
Includes addition to original pipeline
1. Starting Date: Within 14 clays after issuance of utility permit by Garfield County
Road & Bridge Department
2. Completion. Date: 90 days after commencement, Weather pen:fl tting.If
project is not completed within the JD_ days the contractor will apply to
Garfield County Road & Bridge Department for an extension to the permit.
3. A letter of credit for construction prrrpases will be submitted to Cold County
Road & Bridge Department in the amount of S100,000.00 (One Mated
Thousand Milers). The letter of credit will be held for one year after completion
of pmject.
4. Company w .l futnfsh on electronic is fbr t to Garfield :County Road & $ridge
Department an °abuitt survey upon. completion oftl project
5. contractor will furnish to field County Road & Bridge °Department-and Qf
contact names aril ►uo boas of all companies,working onthe project. Crarfteld
County Road & Bridge Department will furnish to contciactor the same.
6. A traffic control plan will be submitted and approved, by Garfield County Road &
Bridge Department prior to permit being 'lewd.
7. The tarried, depth of the pipelim ' Slra1,1 be 60i.inohes to top of pipe within County
Right of Way.
8. Cr:,,,300 fParaeltute 1 Jna..ltea4) will be kept open to trafic at 41r4i aes. Traffic
delays of 10 meets are acceptable, except for emergency vehicles. Road
crossing8 will be bored..Ifborefails 3 times or belting tool becomes.stuck road
way may be cut with specrat.pemiission of Garfield County kets:1 4 Bdtige
Department.
9. Affected areas ,will be graded and shaped to include mad surfeee and barrow
ditch. his will incltjde replacement offload suttee with a 44nch asphalt mat if
contaminated or deemed neeeasary by Ga rfreld County Ill:Presentative. :Areas of
conatructio>n'vviil be inspected cad approved by Qarfreld County Representative.
10. Backfllling will be with excavated and imported material at 95% cempacdon with
moisture.' Testing intervals will be.detea fined on site by Geo -Tech hired by
contractor azid agreed to.by Oar4e4 County representative. Test iesulis'will be
l I. sent to Garfield County Road & .Bridge Department, P. fa. Box 426, Ride, CO
S1650 to be reviewed and approved by Garfield County engineering department
• 1111In111%1Iti% lid WI1111i MUM I rmii 11111
Reception #: 809190
10,12/2011 09:42:16 AM Jean Alberioo
9 of 10 Rao Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
12. Rock exceeding 10-inches in diameter shall be removed from site. It is the
contractor's responsibility to locate place to discard rocks.
13. Affected areal outside of road driving surface will be reseeded with a mix
submitted by contractor and approved by Garfield County Vegetation Manager.
Contact Steve Anthony' at 970425 -8601 Ext.105 or 970:319 -4456: List plant
material, be specific (scientific and common names required). Planting schedule
(to include timing and methods). A map of the area impacted (where the soil will
be disturbed).
14. A letter of credit for-revegatation will be submitted to Garfield County Vegetation
Depa&tmentin the amount of$11000.00 (Bleven Thousand Dollars). After initial
planting letter of credit .will held for a maximum of two years.
15. Contractor will notify Garfield County Road & Bridge Department 48 hours prior
to starting proje t and of any problems arising during the project. Contact Jake
B. Mau at 970.625 -8601 Ext. 104 or 970 -6i8 -6194.
16. Garfield Gourity Road & Bridge. Department reserves the right to shut the project
down if road damage starts to oar; dust becomes aproblem or during inclement
weather -that ctruld';becom.e a safety issue for the traveling public.
17. Garfield County, Road & Bridge Department representative will do a final
inspection upon completion of the project.
18. Vehicles and equipment used by employees constructing the pipeline will be
licensed and registered in the state of Colorado.
19. All vehicles transporting equipment and material used for the project will abide
by Garfield County's oversizeloverwelght regulations and follow approved haul
mutes.
20. All utilities within n County right of ways shall be removed at the owners expense
upon request from Garfield County Road & Bridge Department for road
improvements or other construction projects.
21. Utility permit will be issued upon approval of an Administrative review process.
• • •
oo =
c, 17.0
+601. III
00i.
°
0 3
0 04*
0 0 co
M••
o
fob-
• U3
OD C3
0
00
D
••
•
On
0
00
-n
z
rn
rn
X
71:
0
111 11 V1911.11f1M113111211,Pil
.,. , e,„v: A.t„.• • _
''''.:414r ' .*:?• .
•-• ■ • ',.**taii......••• .
'
,
.. ..7) -t'-' ... eon, ......G
'
,:•„,..,,'"-' -".:, C\,,,.. ''.‘1',,,\%.,;4,"'
,aii•iii: • , ... ` ) ,....%. ‘. 1,
I., \ ,N, ,
'01; N.
„ ...•
,
L, \ 4 ' / . '', ''' gh
'• . \
..
. 49..,,,„.,:„.1!.:,.....e.".
. . „-___.4. -.-, - ,
:•,,:-..„-.14., ' ^.,- ..: ' '.1 i■.11,
i:'.> \ I ''•':-S ' ' - ' . . * 4„, kt§;-..,., , .
'10; . -. 1-7--'N. t".•••• . . ''111,
• '...- '".■ • ' "9-•'•'.4--*• ----.-^•------.. _ -* ..
_•••-, - --••
':-.. , '''''.' ."0,-.' - "' :
10141.1.1.10.4.0............1.0
011.11•01,01.0100::100017.101=11•0111..r..
0.0.1.10...............
.....,.........A.,..................•....,
oul....1010117...............
0.001....0111200....• 0.110.....
.•■■••10.10•00.10.0.......1.00.
..................,....m.....-
-
• --• `,..''--ti--:4 .. v., - ir" __ ,t . _
\ 4111111101110 , .
' `.."`t„ - '. • .I.-
,,, ..:?...7....
' \ 'X''--. - I
v c'r.'".'-'..----_-.\-, . ..
,,w;..-i.'2'
)
• I
ISI lha. -.N...ile.
, .
•-••-_______.::....„...........,1- ...._,...__,,..._„_,..._.,
' •:;*;*r.'
••••-•••••, ,.. ■ .
• \ ; ,
1 \ ,, -:::::_......,
N
t *X ..,
\ * ,-. ••••-•
\ i\ 1 *1 • ..:, :. ....-4:7---,.."--)rt16:''• ,
/-, • • .
i - ' 7%. 4..,...c.,L. .'-' . •
::,
r.._
N+ \ '. .
'•••• ..... 6....
% %
as,..',1 , _ , -
a " • • ,
\ \ 6,, .„......,...„.
. -‘1/ \ •••••--_, •
•
.
.. \'
N
\•11,
•
.
'1 - . - ' 8'11 11"-:“.
, . ,,......„,
v v,.,
4.,
*4414Tr
Ilki
l • .`
_ , -• •,,,,
......
.0. .1.1
• \ N 0 _....1__ ......,
..
..oe n..0 e+-do e.,.. OM W. 0.16 01. 1.10 1.01 .3-v.1 1.4c w-ao .02 .01 .01 ..
•
.. 01. 40,1 .0 01. 111. 0.1 110. 0. 1.0 'V. •••••• 0. .01 0.
.010/Tos mg-. ow.. ■,
lit ' I
''''...-• - 1 HI
1
\
---
NM
\ kr
-
-...............
........ Y
••••••:.
04-
:-.......====."" =■.■.,..................
••-r.-=----
W., .6,,
101...•••-1.
....
t....- ,
i . ■
,
/ • • :1 .
(,_ ' ••••••- a.. ....
07.2 -•-•
:
,• ....011.1... '''''-dia."'1..""..""*..."'=1C; ' ..... ;
..:-.., .---
t===...........=.... ..........., ....'''.
1r====EEE•Mm======7. ...l===.===a.=========
...
El:'•...
;. .11...
0..0,
...,===
...
_ .2......ZZE„..-.
__ . ..
• 4 i
-,--I-1--J
. r
=
`=••
■..... ...,■...■
•••,_
- PRELIMINARY
••■■• ••••000.
=
..........-.......................,,,........,......................................
MINIA.011011.011{1.1011001111.1.11.11.011100000.101.111100.111.110011.11•00101..
••••••10.
......;Tm.m.........r.=..............
CONCEPT DESIGN ONLY
'
44 ••• - -
ar......0.. M.I.....11=1.•01M•••■•■11[M.7**0.1.9.11•11.M.1.11140,111
• s..11041.4.11.0....111.4.41.0.0.01.1.........WIK • r11.1.,,11.1,41111......
.0..0.00101.01101,11,14 .0.0.1.0.01.....1.00...............
.....................................1
2- ,_,„__,,,,L.,..,1
• I -'-***-
■
*'*-."*-.---
. •-.1R
1000 WN WM Wel N. N. Ie. W. 21. N. -.cc - .01 - -liar 164,- - we
erFEREN 01.014C S
..910.
. ..
' ,..•-•nr•M
. 1 6 ,
r In'
"ill -I"
canc.'''. Am.
4101411041, AMA OKOOPIIC
I
Ilia
EM
11100.11,
.,...-==0.-r.
=IIMG3111 -. ,
VlSerS :-.1',I14: T fi'xr,..m-,--acrg. LI r Door corr*f and v,.;:1 1 r.);::.';I:'-;:l -..
vz •.--,
• • •
oo =
c, 17.0
+601. III
00i.
°
0 3
0 04*
0 0 co
M••
o
fob-
• U3
OD C3
0
00
D
••
•
On
0
00
-n
z
rn
rn
X
71:
0
111 11 V1911.11f1M113111211,Pil