Loading...
HomeMy WebLinkAbout05.24.11 Letter from Chris HaleMay 24, 2011 Ms. Molly Orkild - Larson Garfield County Building & Planning 0375 County Road 352, Building 2060 Rifle, CO 81650 MOUNTAIN CROSS ENGINEERING, INC. CIVIL AND ENVIRONMENTAL CONSULTING AND DESIGN RE: PDPA -6829, Piceance Creek Loop Pipeline: Enterprise Gas Processing, LLC Dear Molly: This office has performed a review of the documents provided for the Piceance Creek Loop Pipeline of Enterprise Gas Processing. The submittal was found to be thorough and well organized. The review generated the following comment: • The plans show that there are existing pipelines that will be in conflict with the 36" pipe diameter and 48" minimum cover. No construction details were included that show how these are to be resolved. The Applicant should provide more information concerning mitigation of pipeline crossings, separation, and depths. Feel free to call if any of the above needs clarification or if you have any questions or comments. Sincerely, Mount.; n Cross Engi eering, Inc. 826 1/2 Grand Avenue • Glenwood Springs, CO 81601 PH: 970.945.5544 • FAX: 970.945.5558 • www.mountaincross- eng.com