Loading...
HomeMy WebLinkAbout1.08 Staff Billingtae, :. frs Project: American Soda, LLP - Professional Office (SUAA 7053) Owner: American Soda, LLP Representative: Renata Busch, Encan Oil and Gas Staff:: Molly Orkild- Larson Base Fee: $400 11/4/2011 TC Review (first submittal) TE 2 11/4/2011 NTC letter TE 1 Phone calllemails explaining NTC letter TE 0.5 TC Review (second submittal) 12/14/2011 TC Letter TE 1 TE 1 1/3/2012 Email to Applicant about late referral copies TE 0.5 1/4/2012 Referrals sent M 1/26/2012 Staff ReportlPowerPoint Presentation RW 1 2/6/2012 BOCC Hearing MH 0.5 2/9/2012 Resolution RW 1 3/5/2012 File Closurer M 0.5 Referral Mailing costs $3.12 Referrals sent by admin staff, .5 hours Total Hours Total Fee $ 379.50 Total Other Charges $ 11.35 Director $ 390.85 Hrs @ $ 50.50 = $ - Asst. Director Hrs @ $ 45.50 = $ - Sr. Planner 9 Hrs Co? $ 40.50 = $ 364.50 Plan. Tech. Hrs @ $ 33.75 = $ - Secretary 0.5 Hrs @ $ 30.00 = $ 15.00 Total Fee $ 379.50 Total Other Charges $ 11.35 Grand Total $ 390.85 Base Fee (Minus) $ 400.00 Balance Due _$ (9.15) NOTES: 1. Codes: a. CR(Completion Review) b. TE (Technical Compliance Review) c. AR (Application Review) d. RW (Report Writing) e. RA (Review Agency Reporting) f. SV (Site Visit) g. MH (Meetings and Hearings) h. TC (Telephone Conference) i. GIS (Geographic Information Systems) j. AS (Administrative Support) k. M (Misc., postage, copies, fax) 2. Misc. Expense: Photo Copies ($0.25 /page) 3. Fees: Base Fee is an estimate of the average number of hours of staff tir an application, multiplied by an hourly rate for the personnel involved. recognizes that the land use application process time varies and that an API pay for the total cost of the review which may require additional billing. Ho based on the hourly salary, and fringe benefits costs of the respective positic with an hourly overhead cost of the office will be used to establish the County staff time devoted to the review of a particular project.