Loading...
HomeMy WebLinkAbout1.19 Water Supply and Management PlanOXY USA WTP LP Pond 10 Water Supply and Management Plan Garfield County Limited Impact Review, 2014 Page 1 of 1 Water Supply and Management Plan Section 4-203 M. Water Supply and Management Plan The Water Management Plan, Section 4-203(M) of the Garfield County Land Use and Development Code is not applicable to the proposed site. The proposed facility will not require water for personnel or water to be supplied to the site for daily operations. During operations, personnel will not be required to be manned at the site other than during completions activities. Drinking water will be provided in the form of bottled water. Due to the minimal presence of personnel onsite, water use will not be required onsite. The Pond 10 site stored produced water extracted during drilling activities. The Non-Tributary Groundwater Analysis is provided in the Impact Analysis tab.