Loading...
HomeMy WebLinkAbout4.01 400561772 Pond 10 Form 15 submitted 3.14.14_smallSState of Colorado OOil and Gas Conservation Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894- 2109 EARTHEN PIT REPORT / PERMIT FORM 15 Rev 10/11 Document Number: OGCC RECEPTION Calculations Topo Map OGCC Operator Number: City: Name of Operator: Address: 66571 OXY USA WTP LP P O BOX 27757 HOUSTONZip:State:77227 Contact Name:Joan Proulx Phone: Email:Joan_Proulx@oxy.com (970) 263-3641 TX API Number (associated well): 05- Pit Location (QtrQtr, Sec, Twp, Rng, Meridian):SESW-5-7S-97W-6 39.468404 00 Operator's Pit/Facility Name:Pond 10 Operator's Pit/Facility Number: Latitude:Longitude:GARFIELDCounty: OGCC Location ID (associated location): -108.244602 400561970Or Form 2A # Water Analysis Form 2A Mud Program Sensitive Area Info Form 26 This form is to be used for both reporting and permitting pits. Rule 903 describes when a Permit with prior approval, or a Report within 30 days is required for pits. Submit required attachments and forms. OGCC PIT NUMBER:Design/Cross Sec Detailed Site Plan Pit Location Information Operation Information Production: Multi-Well Pit: Pit Use/Type (Check all that apply): Flare;Emergency;Blowdown;Special Purpose:Workover;Plugging;BS&W/Tank Bottoms Produced Water Storage;Skimming/Settling;Percolation;Evaporation Pit Type: Oil-based Mud;Salt Sections or High Chloride Mud Actual or Planned:Construction Date: Method of treatment prior to discharge into pit: Lined Two and three phase separation Other Information:As discussed during a meeting on January 27, 2014 with Alex Fischer, Oxy is in the process of preparing a Form 28 Centralized E&P Waste Management Facility application for Pond 10 and will provide this to the COGCC when complete. Offsite disposal of pit contents: 05/01/2014Planned Drilling: (Ancillary, Completion, Flowback, Reserve Pits) Injection;Commercial;Reuse/Recycle;NPDES;Permit Number: Unlined Distance (in feet) to the nearest surface water:Ground Water (depth):Water Well:44350 977 Is this location in a Sensitive Area?Yes Existing Location? 400561772 ATTACHMENTS Site Conditions Primary Liner. Type: Size of Pit (in feet): Flow Rates (in bbl/day): Width: Outflow: Other Information:Oxy will install a geosynthetic clay liner as the base layer for the pond, followed by one 60-mil HDPE liner, a geocomposite base liner to allow for fluid movement between the HDPE liners to aid in fluid detection, two gravel sump and site pipe leak detection systems, and finally a second 60-mil HDPE liner, see Pond 10 Liner Configuration diagram. As discussed during meetings with Alex Fischer, Oxy is in the process of preparing a Form 28 Centralized E&P Waste Management Facility application for Pond 10. Percolation: Length: Inflow: 286 278 HDPE HDPE 194Depth: 0 9174918 1 60 60 Calculated Working Volume (in barrels): Evaporation: YesIs Pit Fenced?Yes Is Pit Netted?Yes Leak Detection? Thickness (mil): Thickness (mil): Seconday Liner (if present): Type: Pit Design and Construction NOTE: Operator to provide OGCC Pit Number only if available on an existing pit for pit report Form Type:PERMITREPORT Page 1 of 2Date Run: 3/14/2014 Doc [#400561772] Blair RollinsSigned: Title: Print Name: Email:Date:blair_rollins@oxy.com I hereby certify all statements made in this form are, to the best of my knowledge, true, correct, and complete. 03/14/2014Regulatory Consultant Oxy is preparing and will provide the COGCC with the Form 28 Centralized E&P Facility application once complete, as discussed with A. fischer on January 27, 2014. Certification Operator Comments: Title:Date:Signed:Director of Cogcc Approval CONDITIONS OF APPROVAL: COA TypeDescription NoBMP/COA TypeDescription 1WildlifeThe pond will be netted to prevent birds from entering the Facility. 2WildlifeThe pond will have an eight foot tall chainlink perimeter fence to prevent wildlife and un-authorized personnel from entering the pond. Additionally, Oxy will install a mesh fence to extend one foot below grade and two feet above grade to prevent small animals from entering the pond. 3Storm Water/Erosion Control The location will be monitored and managed for storm water/erosion control as part of Oxy's stormwater management plan. 4Material Handling and Spill Prevention The Facility will receive produced water treated on the well pad location by initial separation by 2- and 3-phase separators, and by gravity separation and skimming inside storage tanks prior to transfer and receipt by Pond 10. Hydrocarbons on the fluid surface of the Facility will be removed and recovered within 24 hours of discovery. Recovered oil will be stored in oil tanks which will go to market for sale, while solids separated from the produced water will be disposed of in accordance with applicable COGCC regulations. 5Material Handling and Spill Prevention Oxy estimates the total throughput for 2014 to be approximately 250,000 barrels of produced water over a five-day period to support completions operations. Aside from the planned 5-day completions support operation, Pond 10 will operate with de minimis amounts of produced water storage for reuse and rely on disposal as normal operations for the remainder of 2014. Oxy extrapolated the average daily inflow from the 250,000 bbl of produced water required for drilling and completions activities to determine the average daily inflow of 278 bbls/day. The daily inflow of 278 bbls is not representative of the daily volume of produced water inflow which will be transferred during the planned 5-day drilling and completions activities, due to the volume of produced water needed. 6Material Handling and Spill Prevention Fluid levels within the Pond will be monitored using high-level fluid alarms and Iconics, a fluid monitoring and reporting system. Oxy will operate the Facility to ensure the required two feet of freeboard is maintained at the Pond. 7Material Handling and Spill Prevention Oxy will install two leak detection site pipes between the primary 60-mil HDPE and secondary 60-mil HDPE liners to detect fluid accumulation between the liners. The site pipes will be monitored at least everyother week and any fluid accumulation will be sent to a laboratory for analysis. 8Material Handling and Spill Prevention Oxy will install a loading/unloading station (or equivalent delivery/retrieval system) located next to the multi-well/production pit, to deliver fluids or to remove fluids from the pit by truck. The loading/unloading station shall be designed and utilized to prevent hoses from being dropped into the pits and dragged over the liner, which could lead to liner damage. The loading/unloading station will be the only permitted access for manual fluids transfers to or from the pit. Vehicles will not be allowed to approach the pit any closer than the loading/unloading station. Each station will have a catch basin in case a leak occurs while operations personnel are connecting or disconnecting hoses. Signs clearly marking the truck loading/unloading station shall be provided and maintained by the operator. Total: 8 comment(s) Best Management Practices Page 2 of 2Date Run: 3/14/2014 Doc [#400561772] BLM BLM BLM OXY OXY OXY SAVAGE LIMITED PARTNERSHIP I& GEORGE M. ANDERSONREVOCABLE TRUST PROPOSED PITCE TER COORDI ATESLATITUDE: 39.468404 LO ITUDE: 108.244602 AD 83 DATUM 2000 0 1414 ELK ST., SUITE 202 ROCK SPRINGS, WY 82901(307) 362-5028 A2/06/14 ISSUED FOR PERMIT DESCRIPTION DATE - CSW SCALE: 1" = 2000'JOB No.: 20347GARFIELD COUNTY, COLORADO SHEET 1 OF 4REV 02/18/2014 J:\20000\20347 OXY Pond 10 Upgrade \FROM tp\RS Drainage Plan Map.dwg ..\Logo\OXY.JP 296.5' X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX XX X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXX 400 1414 ELK ST., SUITE 202 ROCK SPRINGS, WY 82901 (307) 362-5028 D3/6/14 ISSUED FOR PERMIT DESCRIPTION REVISIONS DATE LGBCSW SCALE: 1" = 40' JOB No.: 20347 GARFIELD COUNTY, COLORADO DRG-SITEP-20347 SHEET 2 OF 5 REV D POND 10 UPGRADE DETAILED SITE PLAN 03/06/2014 J:\20000\20347\Drainage Report\Drainage Plan Map.dwg SAVAGE LIMITED PARTNERSHIP I & GEORGE M. ANDERSON REVOCABLE TRUST OXY USA INC. SAVAGE LIMITED PARTNERSHIP I & GEORGE M. ANDERSON REVOCABLE TRUST OXY USA INC. OXY USA INC. OWNERSHIP BOUNDARY PUMP PAD OWNERSHIP BOUNDARY OXY USA INC. POND 10 N 607270.18 E 1225403.78 N 607104.70 E 1225416.89 N 607110.54 E 1225490.66 N 607276.02 E 1225477.55 BIRD NETTING FENCE 10' BUFFER (TYPICAL) 10' ACCESS ROAD (TYPICAL) CEMENT PAD GENERATOR ELECTRIC RISER FUEL GAS RISER EXTERIOR FENCE (TYPICAL) EXISTING OXY LEASE ROAD2' FREEBOAR D MAXIMUM HIGH WATER MARKTOP OF FREEBOARD TOP OF PIT 2' FREEBOAR D 2' FREEBOARD2' FREEBOARD SAVAGE POND 3:1 INTERIOR SLOPES 3:1 INTERIOR SLOPES 3:1 INTERIOR SLOPES3:1 INTERIOR SLOPES 2:1 SLOPES2:1 SLOPES SEDIMENT TRAP 1 RETENTION POND FUTURE TANKS SEDIMENT TRAP 3 NOTES: 1.NORTHING AND EASTINGS REFERENCED TO STATE PLANE COORDINATES, COLORADO CENTRAL ZONE, U.S. SURVEY FEET, NAD 27. 2.FACILITY BOUNDARY ±4.678 ACRES. S 85°49'51" WSW COR SE C 5T.7S, R. 97W, 6TH P.M. 2285.01' S 47°21'59" ES1/4 COR SEC 5 T.7S, R. 97W, 6TH P.M.379.26' THE BASIS OF BEARINGS FOR THIS PLAT IS THE COMMON LINE BETWEEN TRACT 83-B AND TRACT 39, TOWNSHIP 7 SOUTH, RANGE 97 WEST, OF THE 6TH PRINCIPAL MERIDIAN, GARFIELD COUNTY, COLORADO, BEING MONUMENTED ON THE WEST WITH AN ALUMINUM CAP L.S. 37897 AND BEING MONUMENTED ON THE EAST BY A 2.5" GLO BRASS CAP WHICH BEARS SOUTH 88°34'30" EAST. FACILITY BOUNDARY (TYPICAL) FACILITY BOUNDARY FACILITY BOUNDARY SEDIMENT TRAP 2 182.0' 274.0' 74.0' 166.0' 215.5' 20 4.0' 296.5' 194.0' 286.0'307.7' X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXX X X XX X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXX 300 1414 ELK ST., SUITE 202 ROCK SPRINGS, WY 82901 (307) 362-5028 13/6/14 ISSUED FOR BID DESCRIPTION REVISIONS DATE LGBCSW SCALE: AS SHOWN JOB No.: 20347 GARFIELD COUNTY, COLORADO DRG-PIT-20347 SHEET 3 OF 6 REV 1 POND 10 SITE DIAGRAM DETAILED PIT PLAN 03/06/2014 J:\20000\20347\Drainage Report\Drainage Plan Map.dwg PRIMARY PIT INSIDE TOP286'+ x 194'+TOTAL PIT VOLUME (INCLUDING 2' OF FREEBOARD) INSIDE BOTTOM166' x 74'22,978 CU. YDS. 14.243 ACRE FEET110,499 BBL INSIDE SLOPES3:1 OUTSIDE PAD SLOPES2:1 LIQUID PIT VOLUME (EXCLUDING FREEBOARD) DEPTH OF PIT20.0' MINIMUM19,079 CU. YDS. 11.826 ACRE FEET91,749 BBL MAX LIQUID DEPTH18.0' FREEBOARD DEPTH2.0' MINIMUMSURFACE AREA AT MAX. LIQUID DEPTH OF 18.0' 49,868 SQUARE FEET 1.145± ACRES RETENTION POND_______________ INSIDE TOP90'± x 65'±TOTAL POND VOLUME INSIDE BOTTOM65'± x 35'±1,100 CU. YDS. 0.682 ACRE FEET5,290 BBL INSIDE SLOPES2:1 OUTSIDE SLOPESN/ASURFACE AREA AT MAX LIQUID DEPTH OF 7.5' MAX LIQUID DEPTH7.5'5,994 SQUARE FEET0.138± ACRES FREEBOARD DEPTHN/A SEDIMENT TRAP 1 ___ INSIDE TOP28'± x 28'±TOTAL POND VOLUME INSIDE BOTTOM12'± x 12'±62 CU. YDS.0.038 ACRE FEET298 BBL INSIDE SLOPES2:1 OUTSIDE SLOPES2:1SURFACE AREA AT MAX LIQUID DEPTH OF 4.0' MAX LIQUID DEPTH4.0'784 SQUARE FEET0.018± ACRES FREEBOARD DEPTHN/A SEDIMENT TRAP 2 ___ INSIDE TOP40'± x 24'±TOTAL POND VOLUME INSIDE BOTTOM28'± x 12'±69 CU. YDS.0.043 ACRE FEET332 BBL INSIDE SLOPES2:1 OUTSIDE SLOPES2:1SURFACE AREA AT MAX LIQUID DEPTH OF 3.0' MAX LIQUID DEPTH3.0'960 SQUARE FEET0.022± ACRES FREEBOARD DEPTHN/A FACILITY BOUNDARY ±4.678 ACRESNOTES: 1.SLOPES SHALL BE AS SHOWN ON DRAWINGS. ALL PRIMARY PIT INTERIOR BERMS SHALL BE 3:1 (H:V). 2.NO VEGETATION OR ORGANIC MATERIAL WILL BE PERMITTED TO BE PLACED IN FILL SLOPES. 3.REGULAR MAINTENANCE OF ALL BERMS AND CHANNELS WILL BE REQUIRED. 4.ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES WILL BE STRICTLY ADHERED TO. NORTHINGEASTINGELEVATIONDESCRIPTION 606879.801226332.316068.32SE COR TRACT 83-B 606913.221224991.695806.19SW COR TRACT 83-B 606853.671225769.685849.02S 1/4 COR SEC 5 606872.751223655.466154.29SW COR TRACT 38 606938.571223137.936327.90SW COR SEC 5 609574.891223217.726408.19W 1/4 COR SEC 5 612126.771223286.246131.69NW COR SEC 5 611970.091228545.888034.67NE COR SEC 5 605580.461224975.345782.16SW COR TRACT 39 607276.021225477.555825.30NE PIT BOTTOM COR 607193.631225488.445826.75EAST PIT BOTTOM 607110.541225490.665825.30SE PIT BOTTOM COR 607104.701225416.895825.30SW PIT BOTTOM COR 607187.091225406.005826.75WEST PIT BOTTOM 607270.181225403.785825.30NW PIT BOTTOM COR 607334.121225527.115843.30NE PIT COR HIGH WATER 607060.981225548.765843.30SE PIT COR HIGH WATER 607046.601225367.335843.30SW PIT COR HIGH WATER 607319.741225345.685843.30NW PIT COR HIGH WATER DATUM: STATE PLANE COORDINATES , COLORADO CENTRAL ZONE, U.S. SURVEY FEET, NAD 27 THE BASIS OF BEARINGS FOR THIS PLAT IS THE COMMON LINE BETWEEN TRACT 83-B AND TRACT 39, TOWNSHIP 7 SOUTH, RANGE 97 WEST, OF THE 6TH PRINCIPAL MERIDIAN, GARFIELD COUNTY, COLORADO, BEING MONUMENTED ON THE WEST WITH AN ALUMINUM CAP L.S. 37897 AND ON THE EAST BY A 2.5" GLO BRASS CAP HAVING A BEARING OF SOUTH 88°34'30" EAST. PRIMARY PIT, RETENTION POND, SEDIMENT TRAPS, CHANNELS, UPGRADED PAD, BERM CONSTRUCTION AND EXCESS SPOIL PILE CUT4,690 CU. YDS. FILL1,127 CU. YDS. EXCESS SPOIL PILE3,946 CU. YDS. NET FILL 383 CU. YDS. NOTE: ALL VOLUMES BANK TO BANK WITH NO BUILT IN COMPACTION CONTINGENCY.F 3.1 C 2.3 LEGEND: DESIGN FILL AMOUNT (FEET) DESIGN CUT AMOUNT (FEET) 5840.1DESIGN ELEVATION (FEET) 5840DESIGN CONTOUR (FEET) POND 10 2' FR EEBOARD MAXIMUM HIGH WATER MARK TOP OF FREEBOARD TOP OF PIT 2' FREEBO ARD 2' FREEBOARD 2' FREEBOARD 3:1 INTE RIOR SLOP ES 3:1 INTERIOR SLOPES 3:1 INTERIOR SLOPES3:1 INTERIOR SLOPES A A B B C C RETENTION POND SAVAGE LIMITED PARTN ERSHIP I &GEORGE M. ANDERSON REVOCABLE TRUST OXY USA INC. OWNERSHIP BOUNDARY SAVAG E LIMITED PARTNERSHIP I & GEORGEM. ANDERSON REVOCAB LE TRUST OWNERSHIP BOUNDARY OXY USA INC. -1.7% GRADE -1.7% GRADE 2:1 SLOPE 2:1 SLOPE 2:1 SLOPE ±7.0% GRADE ±8.0% GRADE ±15.0% GR AD E -2.0% GR AD E -2.0% G R AD E -2.0% GRADE -2.0% GRADESTORAGE AREA 3 EXISTING CONTOUR (FEET) SEDIMENT TRAP 3_______________ INSIDE TOP40'± x 25'±TOTAL POND VOLUME INSIDE BOTTOM20'± x 5'±90 CU. YDS. 0.056 ACRE FEET433 BBL INSIDE SLOPES2:1 OUTSIDE SLOPES2:1SURFACE AREA AT MAX LIQUID DEPTH OF 5.0' MAX LIQUID DEPTH5.0'1,000 SQUARE FEET0.023± ACRES FREEBOARD DEPTHN/A D E SEDIMENT TRAP 2 5825583058355840584558505855 5825583058355840584558505855 0+000+501+001+502+002+503+003+02 5825583058355840584558505855 5825583058355840584558505855 0+000+501+001+502+002+503+003+02 58205825583058355840584558505855 582058255830583558405845585058550+000+501+001+502+002+503+003+504+004+504+64-2% SLOPE (TYPICAL) 3:1 PIT INTERIOR PRIMARY LINER TEXTURED 60 MIL HDPE2' MIN. MAXIMUMWATERLEVEL GEONET SECONDARY LINER SMOOTH 60 MIL HDPECLAY LINER 2' 2' 8" PLASTIC PIPE PREPARED SOIL BACKFILL AND COMPACT BIRD NETTING POSTENSURE FENCE POSTS AREINSTALLED AT A MINIMUM 24"FROM UNDERGROUND UTILITIES 10' BUFFER MIN. 10' FIRE LANE/ACCESS ROAD TO EDGE OF PAD 5880588558905895 58805885589058950+000+501+0058705875588058855890 587058755880588558900+000+501+00 1414 ELK ST., SUITE 202 ROCK SPRINGS, WY 82901(307) 362-5028 13/6/14 ISSUED FOR BID DESCRIPTION REVISIONS DATE LGB CSW SCALE: AS SHOWNJOB No.: 20347GARFIELD COUNTY, COLORADO DRG-PROFILE-20347 SHEET 4 OF 6REV1 POND 10 UPGRADEPROFILE VIEWS 03/06/2014 J:\20000\20347\Drainage Report\Drainage Plan Map.dwg 00 HORIZONTAL SCALEVERTICAL SCALE6 30 3:1 3:1 (H:V) CUT FILL FILL FILL FILL NOTES:1.PRIMARY AND SECONDARY GEOMEMBRANE PIT LINERS SHALL BE 60 MIL THICK HDPE OR OTHER ASAPPROVED BY STATE OF COLORADO OIL & GAS CONSERVATION COMMISSION. 2.GSE BENTOLINER NWL GEOSYNTHETIC CLAY LINER OR APPROVED EQUAL SHALL BE PLACED UNDERPRIMARY AND SECONDARY PIT LINERS. INSTALLATION OF CLAY LINER SHALL BE IN ACCORDANCE WITHMANUFACTURERS INSTRUCTIONS. 3.PIT LINERS SHALL BE INSTALLED PER MANUFACTURERS INSTRUCTIONS. BEDDING FOR LINER SHALLMEET MANUFACTURERS SPECIFICATIONS. IF NO BEDDING SPECIFICATIONS ARE GIVEN, BEDDINGSHALL BE EVENLY COMPACTED TO NOT LESS THAN 95% STANDARD PROCTOR DENSITY AS DETERMINED BY ASTM D698 AT A MOISTURE CONTENT FROM -3% TO +3% OF OPTIMUM IN 8"COMPACTED LIFTS. IN SITU DENSITY TESTING SHALL BE USED TO VERIFY FIELD DENSITY ASDETERMINED BY ASTM D1556 OR ASTM D4914 PROVIDED IN SITU SOILS ARE REASONABLY CLOSE TOTHE STANDARD PROCTOR DENSITY SPECIMEN AS DETERMINED BY QUALIFIED PERSONNEL. IF FIELDTESTED SPECIMENS ARE NOT REASONABLY CLOSE TO THE STANDARD PROCTOR DENSITY SPECIMEN,ADDITIONAL STANDARD PROCTOR DENSITY TESTS SHALL BE CONDUCTED. 4.SOIL DIRECTLY UNDER THE GEOSYNTHETIC CLAY LINER SHALL BE A CLEAN, REGULAR SURFACEWITHOUT AGGRESSIVE ANGLE CHANGES, RUTS, CAVITIES, LOOSE ROCKS OR STONES IN EXCESS OF0.375" IN LARGEST DIMENSION. ALL MATERIAL USED FOR BEDDING SHALL BE FREE OF FRACTUREDFACES CAPABLE OF PUNCTURING THE LINER SYSTEM. ORGANIC MATERIAL WILL NOT BE ALLOWEDUNDER PIT LINING OR IN BERMS. GEOTEXTILE FABRIC MAY BE USED FOR BEDDING MATERIAL IFALLOWED BY MANUFACTURER. 5.SUBGRADE BELOW PROPOSED PUMP PAD AND FUTURE TANKS SHALL BE COMPACTED PER BEDDINGSPECIFICATIONS GIVEN ABOVE. 6.ALL BERM, FILL AND SUBGRADE MATERIAL SHALL BE COMPACTED TO NOT LESS THAN 90% STANDARDPROCTOR DENSITY AS DETERMINED BY ASTM D698 AT A MOISTURE CONTENT FROM -4% TO +2% OFOPTIMUM IN COMPACTED LIFTS NOT TO EXCEED 8". IN SITU DENSITY TESTING SHALL BE USED TOVERIFY FIELD DENSITY AS DETERMINED BY ASTM D1556 OR ASTM D4914 PROVIDED IN SITU SOILS ARE REASONABLY CLOSE TO THE STANDARD PROCTOR DENSITY SPECIMEN AS DETERMINED BY QUALIFIEDPERSONNEL. IF FIELD TESTED SPECIMENS ARE NOT REASONABLY CLOSE TO THE STANDARDPROCTOR DENSITY SPECIMEN, ADDITIONAL STANDARD PROCTOR DENSITY TESTS SHALL BECONDUCTED. IF COMPACTION REQUIREMENTS CANNOT BE MET WITH 8" LIFTS, LIFT THICKNESS SHALLBE REDUCED UNTIL COMPACTION REQUIREMENTS CAN BE MET. 7.DRAIN ROCK PLACED IN EACH SUMP ON THE NORTH AND SOUTH ENDS OF THE POND SHALL BEROUNDED TO PREVENT LINER PUNCTURE. GRADING OF THE DRAIN ROCK SHALL BE 100% PASSINGTHE 1 1/2" SIEVE AND 0% PASSING THE 1/2" SIEVE. MAXIMUM WATER SURFACEELEVATION = 5843.3' DEEPEST ELEVATION = 5826.0' EXISTING PIT SURFACEPROPOSED SURFACE 2% GRADE 2% GRADE SP2 SP1 3:1 3:1 (H:V) CUT FILL MAXIMUM WATER SURFACEELEVATION = 5843.3' EXISTING PIT SURFACEPROPOSED SURFACE 2% GRADE 2% GRADE SP1 2% GRADE 2% GRADE CUT FILL SP2 SP1 3:1 (H:V) 3:1 PROPOSED SURFACE EXISTING PIT SURFACE EXISTING PIT SURFACE PROPOSED SURFACE ELEVATION = 5825.3' ELEVATION = 5825.3' ELEVATION 5826.8' 1.7% GRADE 1.7% GRADE DEEPEST ELEVATION = 5825.8' MAXIMUM WATER SURFACEELEVATION = 5843.3' 2:1 FILL FILL NOT TO SCALE FILL FILL 2:1 (H:V) 2:1 (H:V) VERTICAL EXAGGERATION: 5 ( = HOR/VERT SCALE) 20:1 20:1 296.5' X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXX X XXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXX 400 1414 ELK ST., SUITE 202 ROCK SPRINGS, WY 82901 (307) 362-5028 D3/6/14 ISSUED FOR PERMIT DESCRIPTION REVISIONS DATE LGBCSW SCALE: 1" = 40' JOB No.: 20347 GARFIELD COUNTY, COLORADO DRG-WSHEDP-20347 SHEET 5 OF 5 REV D POND 10 UPGRADE DRAINAGE BASINS 03/06/2014 J:\20000\20347\Drainage Report\Drainage Plan Map.dwg LEGEND BASIN BOUNDARY A BC D EXISTING CONTOURS DRAINAGE FLOW BASIN DESIGNATION AREA IN ACRES 25 YEAR RUNOFF COEFFICIENT 100 YEAR RUNOFF COEFFICIENT W1 83.460.30 0.40 DESIGN CONTOURS58 50 DESIGN POINT 1 1 2 3 6 5 CATTLE GUARD/CONCRETE VAULT C1 DRAINAGE SWALE S1 C1 C2 S1 4 SAVAGE LIMITED PARTNERSHIP I & GEORGE M. ANDERSON REVOCABLE TRUST OXY USA INC. SAVAGE LIMITED PARTNERSHIP I & GEORGE M. ANDERSON REVOCABLE TRUST OXY USA INC.OXY USA INC. OWNERSHIP BOUNDARY OWNERSHIP BOUNDARY OXY USA INC. POND 10 EXCLUDED IN P1 BASIN EXISTING OXY LEASE ROAD SAVAGE POND W2 3.740.27 0.36 PS1 2.190.35 0.44 W3 1.070.27 0.36 P1 3.210.35 0.44 R1 0.350.42 0.50 7 8 9 10 11 S2 S7 S8 S9 SP1 SP2 SR1 S3 C3 LEGALDESCRIPTION OXYUSAWTPLP POND10UPGRADEPROJECTBOUNDARY TRACT83ͲB,T.7S.,R.97W.,6thP.M., GARFIELDCOUNTY,COLORADO  APARCELOFLANDFORTHEPURPOSEOFUPGRADINGANEXISTINGFACILITYLOCATEDINTRACT 83ͲB,TOWNSHIP7SOUTH,RANGE97WEST,6thP.M.,COUNTYOFGARFIELD,STATEOF COLORADO,MOREPARTICULARLYDESCRIBEDASFOLLOWS: CONSIDERINGTHECOMMONLINEBETWEENSAIDTRACT83ͲBANDTRACT39,TOWNSHIP7 SOUTH,RANGE97WEST,6thP.M.ASBEARINGSOUTH88°34’30”EASTBETWEENAN ALUMINUMCAPL.S.37897ANDA2.5”GLOBRASSCAPWITHALLOTHERBEARINGSCONTAINED HEREINRELATIVETHERETO. BEGINNINGATAPOINTONTHESAIDCOMMONLINEFROMWHICHCORNERNUMBER4OFSAID TRACT83ͲBALSOBEINGCORNERNUMBERONEOFSAIDTRACTNUMBER39BEARSSOUTH88° 34’30”EASTADISTANCEOF498.86FEET; THENCENORTH88°34’30”WESTADISTANCEOF575.00FEETALONGTHESAIDCOMMONLINE; THENCEDEPARTINGSAIDCOMMONLINENORTHADISTANCEOF285.00FEET; THENCEWESTADISTANCEOF55.00FEET; THENCENORTH02°02’00”WESTADISTANCEOF158.00FEET; THENCENORTH47°00’00”WESTADISTANCEOF45.00FEET; THENCENORTHADISTANCEOF430.00FEET; THENCESOUTH57°00’00”EASTADISTANCEOF207.68FEET; THENCESOUTH44°00’00”EASTADISTANCEOF351.49FEET; THENCEEASTADISTANCEOF250.00FEET; THENCESOUTHADISTANCEOF778.16FEETMOREORLESSTOTHEPOINTOFBEGINNING.  THEABOVEDESCRIBEDPARCELCONTAINS546,886SQUAREFEETOR12.55ACRESOFLANDAND BEINGSUBJECTTOANYEASEMENTS,CONDITIONSAND/ORRESTRICTIONSONORWITHINITS LINES. (Not to scale) HDPE Inspection Well Pipe With Cap Primary Liner (60 mil HDPE) Perforations at Bottom of Pipe Anchor TrenchGeo-Net Conduction Layer Secondary Liner(60 mil HDPE)Geosynthetic Clay Liner Sump Filled with Gravel 7S 97W 6S 97W 213 - CONN CREEK RD Pond 10 Mule Deer Critical Winter Range Pond 10 Access Road Oxy Responsible Road Unimproved Public Road Gravel Public Road Paved Public Road OXY USA WTP LPOXY USA WTP LP 760 Horizon Drive, Suite 101 Grand Junction, CO 81506 Revised: January 21, 2014 Figure 5 Pond 10 Sensitive Wildlife Habitat Map 00.10.20.30.40.5Miles Garfield County, Colorado OXY USA WTP LP TypePercentBPMMGM Water957,9160.33249 Condensate54170.01750 Total08,3330.34999 TypePercentBPMMGM Water957,9160.33249 Condensate 54170.01750 Total08,3330.34999 TypePercentBPMMGMTypePercentBPMMGM Water957,9160.33247Water10010.00004 Condensate54170.01751Condensate000.00000 Total08,3330.34999Total10010.00004 A subsidiary of Occidental Petroleum Corporation EvaporationReuseorDisposal Pond10Facility TotalWaterInflow GarfieldCounty,Colorado Pond10 OXYUSAWTPLP RepresentativeMassBalanceFlowchart Pad #: Multiple Locations Sample Date: 6/6/2012 Clearance Achieved Date: Lab Report #L578932L578932L578932L678896 Date Sampled6/6/20126/6/20126/6/20121/16/2014 Sample NamePond 13WPond 13EPond GPond G InletOrganics in Water(mg/L)TPH (GRO and DRO) NANANA262Benzene0.0051.83.21.89.5Bromodichloromethane BDLBDLBDL Bromoform BDLBDLBDL Bromomethane BDLBDLBDL Carbon Tetrachloride BDLBDLBDL Chlorobenzene BDLBDLBDL Chlorodibromomethane BDLBDLBDL Chloroethane BDLBDLBDL 2-Chloroethly vinyl ether BDLBDLBDL Chloroform BDLBDLBDL Chloromethane BDLBDLBDL 1,2-Dichlorobenzene BDLBDLBDL 1,3-Dichlorobenzene BDLBDLBDL 1,4-Dichlorobenzene BDLBDLBDL Dichlorodifluoromethane BDLBDLBDL 1,1-Dichloroethane BDLBDLBDL 1,2-Dichloroethane BDLBDLBDL 1,1-Dichloroethene BDLBDLBDL trans-1,2-Dichloroethene BDLBDLBDL 1,2-Dichloropropane BDLBDLBDL cis-1,3-Dichloropropene BDLBDLBDL trans-1,3-Dichloropropene BDLBDLBDL Ethylbenzene0.7 0.3 0.72 0.46 1 Methylene Chloride BDL1.40.028 Methyl tert-butyl ether BDLBDLBDL Napthalene BDLBDL0.26 1,1,2,2-Tetrachloroethane BDLBDLBDL Tetrachloroethene BDLBDLBDL POND WATER Sample Identification Toluene0.56 - 1.05.89.95231,1,1-Trichloroethane BDLBDLBDL 1,1,2-Trichloroethane BDLBDLBDL Trichloroethene BDLBDLBDL Trichlorofluoromethane BDLBDLBDL Total Xylenes1.4-10 NANANA 16 Vinyl chloride BDLBDLBDL Additional Organics in WaterAcenaphthene BDLBDLBDL Acenaphthylene BDLBDLBDL Anthracene BDLBDLBDL Benzidine BDLBDLBDL Benzo (a) anthracene BDLBDLBDL Benzo (b) fluoranthene BDLBDLBDL Benzo (k) fluoranthene BDLBDLBDL Benzo (g,h,i) perylene BDLBDLBDL Benzo (a) pyrene BDLBDLBDL Bis (2-chlorethoxy) methane BDLBDLBDL Bis (2-chloroethyl) ethyl BDLBDLBDL Bis (2--chloroisopropyl) ether BDLBDLBDL 4-Bromophenyl-phenylether BDLBDLBDL 2-Chloronaphthalene BDLBDLBDL 4-Chlorophenyl-phenylether BDLBDLBDL Chrysene BDLBDLBDL Dibenz (a,h) anthracene BDLBDLBDL 3,3-Dichlorobenzidine BDLBDLBDL 2,4-Dinitrotoluene BDLBDLBDL 2,6-Dinitrotoluene BDLBDLBDL 1,2-Diphenylhydrazine BDLBDLBDL Fluoranthene BDLBDLBDL Fluorene 0.0150.0320.053 Hexachlorobenzene BDLBDLBDL Hexachloro-1,3-butadiene BDLBDLBDL Hexachlorocyclopentadiene BDLBDLBDL Hexachloroethane BDLBDLBDL Indeno (1,2,3-cd) pyrene BDLBDLBDL Isophorone BDLBDL0.05 Napthalene 0.0560.110.34 Nitrobenzene BDLBDLBDL n-Nitrosodimethylamine BDLBDLBDL n-Nitrosodiphenylamine BDLBDLBDL n-Nitrosodi-n-propylamine BDLBDLBDL Phenanthrene BDL0.030.038 Benzylbutyl phthalate BDLBDLBDL Bis (2-ethylhexyl) phthalate BDLBDLBDL Di-n-butyl phthalate BDLBDLBDL Diethyl phthalate BDLBDLBDL Dimethyl phthalate BDLBDLBDL Di-n-octyl phthalate BDLBDLBDL Pyrene BDLBDLBDL 1,2,4-Trichlorobenzene BDLBDLBDL 4-Chloro-3-methylphenol BDLBDLBDL 2-Chlorophenol BDLBDLBDL 2,4-Dichlorophenol BDLBDLBDL 2,4-Dimethylphenol 0.14BDL0.27 4,6-Dinitro-2-methylphenol BDLBDLBDL 2,4-Dinitrophenol BDLBDLBDL 2-Nitrophenol BDLBDLBDL 4-Nitrophenol BDLBDLBDL Pentachlorophenol BDLBDLBDL Phenol 0.20.190.2 2,4,6-Trichlorophenol BDLBDLBDL Inorganics in WaterAlkalinity 740.00710.00800.00 Bromide 70.0059.0083.00 Chloride1.25 X BG^3 8900.0010000.0012000.00 Conductivity 27.0023.0031.00 Fluoride 0.30.50.2 Nitrate BDLBDLBDL Nitrite BDLBDLBDL pH 7.37.37.2 Sulfate1.25 X BG^3 BDL1.11.8 Total Dissolved Solids1.25 X BG^3 17000.014000.020000.0 Total Hardness 690.0520.0800.0 Dissolved Metals in WaterArsenic BDLBDLBDL Barium (LDNR True Total) 433258 Cadmium BDLBDLBDL Chromium 0.00580.00470.0056 Lead BDLBDLBDL Mercury 0.00004BDL0.00002 Selenium BDLBDLBDL Silver BDLBDLBDL Well PadWell NameAPI #LocationTransport Via? 697-05-20A05045203690000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-20B05045203750000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-22A05045203610000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-22B05045203700000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-28A05045203740000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-28B05045203600000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-30A05045203670000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-30B05045203680000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-36A05045203630000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-36B05045203640000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-38A05045203720000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-38B05045203650000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-4205045203730000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-4305045203710000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-4405045203660000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-4505045203620000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-47A05045203770000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-47B05045203800000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-53A05045203790000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-53B05045203810000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-55A05045203760000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-55B05045203820000Lot 14 Sec 5, T6S, R97WTruck/Pipeline 697-05-5105045209540000NENW Sec 8, T6S, R97WTruck/Pipeline 697-05-57B05045209560000NENW Sec 8, T6S, R97WTruck/Pipeline 697-05-5905045209570000NENW Sec 8, T6S, R97WTruck/Pipeline 697-05-6105045209660000NENW Sec 8, T6S, R97WTruck/Pipeline 697-05-6505045209620000NENW Sec 8, T6S, R97WTruck/Pipeline 697-05-67A05045209670000NENW Sec 8, T6S, R97WTruck/Pipeline 697-05-67B05045209600000NENW Sec 8, T6S, R97WTruck/Pipeline 697-05-7305045209550000NENW Sec 8, T6S, R97WTruck/Pipeline 697-05-74A05045209580000NENW Sec 8, T6S, R97WTruck/Pipeline 697-05-74B05045209640000NENW Sec 8, T6S, R97WTruck/Pipeline 697-05-76A05045209650000NENW Sec 8, T6S, R97WTruck/Pipeline 697-05-76B05045209590000NENW Sec 8, T6S, R97WTruck/Pipeline 697-08-02A05045209530000NENW Sec 8, T6S, R97WTruck/Pipeline 697-08-02B05045209610000NENW Sec 8, T6S, R97WTruck/Pipeline 697-08-04A05045209630000NENW Sec 8, T6S, R97WTruck/Pipeline 697-08-04B05045209680000NENW Sec 8, T6S, R97WTruck/Pipeline 697-08-10A05045209700000NENW Sec 8, T6S, R97WTruck/Pipeline 697-08-10B05045209720000NENW Sec 8, T6S, R97WTruck/Pipeline 697-08-12A05045209730000NENW Sec 8, T6S, R97WTruck/Pipeline 697-08-12B05045209690000NENW Sec 8, T6S, R97WTruck/Pipeline 697-08-1805045209710000NENW Sec 8, T6S, R97WTruck/Pipeline 697-08-1905045209750000NENW Sec 8, T6S, R97WTruck/Pipeline 697-08-33A05045209740000NENW Sec 8, T6S, R97WTruck/Pipeline 697-08-38DB05045122800000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-45D05045122780000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-46DA05045122770000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-46DB05045122760000SWSE Sec 8, T7S R97WTruck/Pipeline Cascade Creek OXY USA WTP LP, COGCC Operator #66571 697-08A COGCC Loc #424797 697-05C COGCC Loc #421340 1 Well PadWell NameAPI #LocationTransport Via? Cascade Creek OXY USA WTP LP, COGCC Operator #66571 697-08-5305045106750000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-54DA05045122790000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-27A05045200670000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-27B05045200910000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-33B05045200570000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-35A05045200930000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-35B05045200690000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-41A05045200650000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-41B05045200870000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-43A05045200810000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-43B05045200600000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-4905045200560000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-5005045200710000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-52A05045200790000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-52B05045200620000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-58A05045200630000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-58B05045200780000SWSE Sec 8, T7S R97WTruck/Pipeline 697-08-58C05045201040000SWSE Sec 8, T7S R97WTruck/Pipeline 697-09-56B05045176920000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-09-64A05045180090000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-10-50A05045180220000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-10-50B05045180110000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-10-5805045180100000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-10-5905045180230000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-15-03A05045180280000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-15-03B05045180240000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-15-09B05045180550000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-15-11A05045180250000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-15-11B05045180260000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-15-19A05045180270000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-15-19B05045194990000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-15-17A05045195010000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-15-2605045195030000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-10-42B05045195020000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-10-42C05045195000000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-15-28A05045195040000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-15-0105045106860000NWNW Sec 15, T6S, R97WTruck/Pipeline 697-16-12D05045122200000SENW Sec 16, T6S, R97WTruck/Pipeline 697-16-18D05045122270000SENW Sec 16, T6S, R97WTruck/Pipeline 697-16-2805045108650000SENW Sec 16, T6S, R97WTruck/Pipeline 697-16-28D05045122280000SENW Sec 16, T6S, R97WTruck/Pipeline 697-16-29D05045122260000SENW Sec 16, T6S, R97WTruck/Pipeline 697-16-37D05045122250000SENW Sec 16, T6S, R97WTruck/Pipeline 697-16-13A205045205840000SENW Sec 16, T6S, R97WTruck/Pipeline 697-16-11B205045205670000SENW Sec 16, T6S, R97WTruck/Pipeline 697-16-21B05045205680000SENW Sec 16, T6S, R97WTruck/Pipeline 697-16-29A05045205800000SENW Sec 16, T6S, R97WTruck/Pipeline 697-16-29B05045205740000SENW Sec 16, T6S, R97WTruck/Pipeline 697-16-15B05045205790000SENW Sec 16, T6S, R97WTruck/Pipeline 697-16-15C05045205730000SENW Sec 16, T6S, R97WTruck/Pipeline 697-15-01 COGCC Loc #335921 697-16-28 COGCC Loc #335643 697-08-53 COGCC Loc #335815 2 Well PadWell NameAPI #LocationTransport Via? Cascade Creek OXY USA WTP LP, COGCC Operator #66571 697-16-23A05045205660000SENW Sec 16, T6S, R97WTruck/Pipeline 697-16-23B05045205780000SENW Sec 16, T6S, R97WTruck/Pipeline 697-16-17A05045180590000NWSW, Sec 16, T6S, R97WTruck/Pipeline 697-16-17B05045180620000NWSW, Sec 16, T6S, R97WTruck/Pipeline 697-16-1905045180580000NWSW, Sec 16, T6S, R97WTruck/Pipeline 697-16-25B05045176040000NWSW, Sec 16, T6S, R97WTruck/Pipeline 697-16-27A05045176050000NWSW, Sec 16, T6S, R97WTruck/Pipeline 697-16-27B05045180570000NWSW, Sec 16, T6S, R97WTruck/Pipeline 697-16-3305045176060000NWSW, Sec 16, T6S, R97WTruck/Pipeline 697-16-42A05045176070000NWSW, Sec 16, T6S, R97WTruck/Pipeline 697-16-42B05045176030000NWSW, Sec 16, T6S, R97WTruck/Pipeline 697-16-50A05045180630000NWSW, Sec 16, T6S, R97WTruck/Pipeline 697-17-56B05045180600000NWSW, Sec 16, T6S, R97WTruck/Pipeline 697-17-64A05045180610000NWSW, Sec 16, T6S, R97WTruck/Pipeline 697-17-64B05045170510000NWSW, Sec 16, T6S, R97WTruck/Pipeline 697-04-57B05045207210000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-04-59B05045207240000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-04-59C05045207110000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-04-65A05045207220000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-04-65B05045207260000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-04-6705045207200000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-04-6805045207130000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-04-74A05045207180000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-04-76A05045207230000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-04-76B05045207290000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-04-8205045207280000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-04-84A05045207150000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-04-84B05045207140000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-09-02A05045207120000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-04-57A05045207160000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-04-59A05045207090000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-09-1205045207190000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-05-63A05045207250000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-05-63B05045207170000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-09-04A05045207270000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-09-04B05045207100000NWSW, Sec 4, T6S, R97WTruck/Pipeline 697-04D COGCC Loc #423240 697-16A2 COGCC Loc #335950 3