HomeMy WebLinkAbout1.16 Grading, Drainage, Erosion Control, Reclamation, SWMP
Grading
Grading
The grad
Drawings
following
Ex
p
Ex
P
The attac
new park
site featu
P
P
Colorado
13. This r
C
H
f
The Drain
major st
detentio
Erosion C
The eros
Construc
P
E
St
g, Drainage
and Drainag
ding and dr
s which is at
g site feature
xisting and
ond;
xisting topog
roposed top
ched Sheets
king area an
ures:
roposed sto
roposed top
o River Engin
report addre
Calculations
Hydraulic ca
acilities.
nage Report
orm flows,
n pond for a
Control
sion contro
ction Drawin
ermanent st
rosion contr
tormwater m
P.O. Box
e, Erosion
ge
rainage imp
ttached to t
es:
proposed d
graphy;
pography, slo
s No. 6 and
d preschool
rm sewer sy
pography sho
neering has
esses the fol
of rainfall, r
lculations u
t makes reco
the develo
attenuating f
l plan is at
gs. The Eros
tabilization m
rol measures
managemen
1301 │Rifle, C
Control, S
provements
he end of th
rainage stru
opes, and dr
7 of the Co
building in
ystem; and
owing spot e
also develop
lowing:
unoff, and d
sed for the
ommendatio
pment of a
flows and wa
ttached to
sion Control
measures;
s; and
t planning.
Colorado│816
SWMP, Rec
are shown
his section. T
uctures, incl
riveways gra
onstruction
more detail.
elevations an
ped a Draina
design of con
design of t
ons for gradi
a storm sew
ater quality
the end of
Plan delinea
50│(970) 625-
clamation
on Sheet
The Grading
uding drain
ades;
Drawings sh
. These draw
nd slopes.
age Report w
nveyance an
the storm s
ing of the sit
wer system,
treatment.
f this sectio
ates the follo
-4933
Informati
No. 5 of t
g Overall Pla
age channe
how the gra
wings deline
which is att
nd detention
sewer system
te, in order
and the de
on as Sheet
owing:
1 | P
on
the Constru
an delineate
els and dete
ading around
ate the follo
ached as Se
n facilities; an
m and dete
to accommo
evelopment
t No. 10 of
age
uction
es the
ntion
d the
owing
ection
nd
ntion
odate
of a
f the
____
CRE has
measure
SWMP (S
The Eros
intended
construct
submitta
Reclama
The land
These gr
requirem
Code.
___________________________________________
P.O. Bo
also develo
s:
Stormwater
sion Control
d to aid in t
tion. A full
al.
tion Plan
scaping plan
rading, drain
ments deline
Silt
Inle
Cul
Rip
Rip
Mu
Ero
Veh
*De
___________________________________________________________
ox 1301 • Rif
oped a pre
Manageme
Plan (Shee
the develop
SWMP sha
n (See Sectio
nage, erosio
ated in Sect
Item
t Fence
et Protection
lvert Outlet Prot
pRap Outlet Prot
pRap Armoring
ulching Revegeta
osion Control Log
hicle Tracking Co
eveloped Feb. 25, 2
Engineer's
Soil Ero
____________________________________________________________
fle, CO 81650
liminary co
ent Plan)
et No. 10 of
pment of a
all be deve
on 5) addres
on control,
ion 4‐203 (E
Qu
8
tection
tection
5
ation
gs
ontrol Pad
2014
s Preliminary
sion and Se
___________________________________________________________
0 • Tel. 970-6
st estimate
f the Const
SWMP appl
loped by th
ses the recla
SWMP, and
E) of the Gar
antityUnit
800LF
4EA
5EA
3EA
50CY
2AC
15EA
2EA
y Cost Estim
ediment Con
____________________________________________________________
625-4933 • Fa
of soil ero
ruction Dra
lication to b
he contracto
amation plan
d reclamatio
rfield County
Unit Cost
2.50$ $
200.00$ $
100.00$ $
500.00$ $
75.00$ $
3,500.00$$
100.00$ $
1,500.00$$
TOTAL$
mate of Tem
ntrol Measu
____________________________________________________________
ax 970-625-45
osion and s
wings) deve
be made to
or prior to
n.
on plan ele
y Land Use a
Total
2,000.00$
800.00$
500.00$
1,500.00$
3,750.00$
6,125.00$
1,500.00$
3,000.00$
19,175.00$
porary
res*
______________________________
564
sediment co
eloped by C
o CDPHE pri
building pe
ments mee
and Develop
ontrol
CRE is
or to
ermit
t the
ment