Loading...
HomeMy WebLinkAbout1.16 Grading, Drainage, Erosion Control, Reclamation, SWMP Grading   Grading  The grad Drawings following  Ex p  Ex  P The attac new park site featu  P  P Colorado 13. This r  C  H f The Drain major st detentio   Erosion C The eros Construc  P  E  St                       g, Drainage and Drainag ding and dr s which is at g site feature xisting and  ond;  xisting topog roposed top ched Sheets king area an ures:  roposed sto roposed top o River Engin report addre Calculations  Hydraulic ca acilities.  nage Report orm flows,  n pond for a Control  sion contro ction Drawin ermanent st rosion contr tormwater m P.O. Box e, Erosion  ge  rainage imp ttached to t es:  proposed d graphy;  pography, slo s No. 6 and d preschool rm sewer sy pography sho neering has  esses the fol of rainfall, r lculations u t makes reco the develo attenuating f l plan is at gs. The Eros tabilization m rol measures managemen 1301 │Rifle, C Control, S provements  he end of th rainage stru opes, and dr  7 of the Co building in  ystem; and owing spot e also develop lowing:  unoff, and d sed for the ommendatio pment of a flows and wa ttached to  sion Control  measures;  s; and  t planning. Colorado│816 SWMP, Rec are shown his section. T uctures, incl riveways gra onstruction  more detail. elevations an ped a Draina design of con  design of t ons for gradi a storm sew ater quality  the end of Plan delinea 50│(970) 625- clamation  on Sheet  The Grading uding drain ades;  Drawings sh . These draw nd slopes.  age Report w nveyance an the storm s ing of the sit wer system,  treatment. f this sectio ates the follo -4933 Informati No. 5 of t g Overall Pla age channe how the gra wings deline which is att nd detention sewer system te, in order  and the de on as Sheet owing:  1 | P on  the Constru an delineate els and dete ading around ate the follo ached as Se n facilities; an m and dete to accommo evelopment  t No. 10 of age uction  es the  ntion  d the  owing  ection  nd  ntion  odate  of a  f the  ____ CRE has  measure   SWMP (S The Eros intended construct submitta   Reclama The land   These gr requirem Code.  ___________________________________________ P.O. Bo also develo s:  Stormwater  sion Control d to aid in t tion. A full  al.  tion Plan  scaping plan rading, drain ments deline Silt Inle Cul Rip Rip Mu Ero Veh *De ___________________________________________________________ ox 1301 • Rif oped a pre Manageme  Plan (Shee the develop SWMP sha n (See Sectio nage, erosio ated in Sect Item t Fence et Protection lvert Outlet Prot pRap Outlet Prot pRap Armoring ulching Revegeta osion Control Log hicle Tracking Co eveloped Feb. 25, 2 Engineer's Soil Ero ____________________________________________________________ fle, CO 81650 liminary co ent Plan)  et No. 10 of pment of a  all be deve on 5) addres on control,  ion 4‐203 (E Qu 8 tection tection 5 ation gs ontrol Pad 2014 s Preliminary sion and Se ___________________________________________________________ 0 • Tel. 970-6 st estimate f the Const SWMP appl loped by th ses the recla SWMP, and E) of the Gar antityUnit 800LF 4EA 5EA 3EA 50CY 2AC 15EA 2EA y Cost Estim ediment Con ____________________________________________________________ 625-4933 • Fa  of soil ero ruction Dra lication to b he contracto amation plan d reclamatio rfield County Unit Cost 2.50$         $ 200.00$    $ 100.00$    $ 500.00$    $ 75.00$      $ 3,500.00$$ 100.00$    $ 1,500.00$$ TOTAL$ mate of Tem ntrol Measu ____________________________________________________________ ax 970-625-45 osion and s   wings) deve be made to or prior to  n.  on plan ele y Land Use a Total 2,000.00$          800.00$             500.00$             1,500.00$          3,750.00$          6,125.00$          1,500.00$          3,000.00$          19,175.00$        porary res* ______________________________ 564 sediment co eloped by C o CDPHE pri building pe ments mee and Develop ontrol  CRE is  or to  ermit  t the  ment