HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLC0-5-14-3124
Oak Meadows-OMWA
Pump Building
Old Midland & Sun King Drives
GWS, Colorado
1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC , IPC, IFGC, IECC, IFC, AND THE
MANUFACTURERS INSTALLATION SPECIFICATIONS .
2) ALL WORK SHALL COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT.
3) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REQUIREMENTS .
4) PERMIT APPROVED FOR CONSTRUCTION OF NEW PUMP BUILDING . PERMIITING AND
APPROVAL OF DISTRIBUTION COMPONENTS BY OTHERS.
5) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION , 1500 PSF .
6) AS NOTED BY ENGINEER ON RECORD, SPEC IAL INSPECTOR SHALL OBSERVE PLACEMENT
OF CONCRETE IN ICF SYSTEM AS REQUIRED BY MANUFACTURERS SPECIFICATIONS .
PROVIDE INSPECTION REPORT PRIOR TO FRAMING INSPECTION .
7) PROVIDE ENGINEERED TRUSS SHOP DRAWINGS AT FRAME INSPECTION , TCLL = 50 PSF .
8) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED AT FRAME INSPECTION .
9) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION .
10) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12 .
11) LOCKS , LATCHES, AND LANDINGS PER 2009 IBC, SECTION 1008.
12) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL.