Loading...
HomeMy WebLinkAboutConditons of PermitCONDITIONS OF PERMIT BLC0-5-14-3229 Jan Ertl Telecommunication Equipment Building Sect24, T06, R94 Parachute, Colorado 1) ALL WORK SHALL COMPLY WITH THE 2009 IBC, TIA-222, OSHA, FCC, AND EPA REGULATIONS, AND THE MANUFACTURERS SPECIFICATIONS . 2) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT . 3) ROOMS WITH STORAGE BAITERY SYSTEMS HAVING A LIQUID ELECTROLYTE CAPACITY OVER 50 GALLONS , OR A LITHIUM -ION CAPACITY OF 1000 POUNDS USED FOR STANDBY POWER REQUIRES ONE (1) HOUR SEPARATION PER IBC, TABLE 508 .2.5 . 4) LOCKS, LATCHES, LANDINGS PER 2009 IBC, SECTION 1008. 5) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 6) VERIFY C.D.O.H . INSIGNIA AFFIXED FOR FINAL INSPECTION . 7) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION. 8) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL.