HomeMy WebLinkAboutConditons of PermitCONDITIONS OF PERMIT
BLC0-5-14-3229
Jan Ertl
Telecommunication Equipment Building
Sect24, T06, R94
Parachute, Colorado
1) ALL WORK SHALL COMPLY WITH THE 2009 IBC, TIA-222, OSHA, FCC, AND EPA
REGULATIONS, AND THE MANUFACTURERS SPECIFICATIONS .
2) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT .
3) ROOMS WITH STORAGE BAITERY SYSTEMS HAVING A LIQUID ELECTROLYTE CAPACITY
OVER 50 GALLONS , OR A LITHIUM -ION CAPACITY OF 1000 POUNDS USED FOR STANDBY
POWER REQUIRES ONE (1) HOUR SEPARATION PER IBC, TABLE 508 .2.5 .
4) LOCKS, LATCHES, LANDINGS PER 2009 IBC, SECTION 1008.
5) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.
6) VERIFY C.D.O.H . INSIGNIA AFFIXED FOR FINAL INSPECTION .
7) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION.
8) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL.