ONSITE WASTEWATER TREATMENT SYSTEM DESIGN
EXISTING INDUSTRIAL BUILDING
LOT 4, COKE OVENS EXEMPTION
0755 AIRPORT ROAD
GARFIELD COUNTY, COLORADO
JOB NO. 114 080A
APRIL 30, 2014
PREPARED FOR:
PITKIN IRON
ATTN: ROB DELANEY
P. O. BOX 1298
GLENWOOD SPRINGS, COLORADO 81602
r0b(r -l)iikin1r on.con
huker 303-841-7119 • Culorado Spring=, 719-633-5562 • Sih'ertlitrrne 970-468-1980
TABLE OF CONTENTS
INTRODUCTION
- 1 -
SITE CONDITIONS
- I -
SUBSURFACE CONDITIONS _
PERCOLATION TESTING 2
2 -
OWTS ANALYSIS
-2-
DESIGN RECOMMENDATIONS
SOIL TREATMENT AREA - 3 -
OWTS COMPONENTS - 3
Septic Tank 4
Sewer Pipe - 4'
Effluent Transport Piping - 4 -
- 5 -
OWTS OPERATION AND MAINTENANCE
OWTS OPERATION - 5 -
OWTS MAINTENANCE - 6 -
- 6 -
OWTS CONSTRUCTION OBSERVATION
-7-
LIMITATIONS
-7-
FIGURE 1 — SITE LOCATION PLAN
FIGURE 2 — OWTS SITE PLAN
FIGURE 3 — ABSOPRTION AREA CALCULATIONS
FIGURE 4 — ABSORPTION AREA PLAN VIEW
FIGURE 5 — ABSORPTION AREA CROSS SECTION
TABLE 1 - PERCOLATION TEST RESULTS
ATTACHMENTS
PITKIN IRON PUMPING RECORDS
Job No. 114 080A
Gtech
INTRODUCTION
This report provides an onsite wastewater treatment system (OWTS) design for the
existing commercial building located at 755 Airport Road near Glenwood Springs in
Garfield County, Colorado, The purpose of this report was to explore the subsurface
conditions at the site and provide design details for an OWTS in accordance with current
Garfield County Individual Sewage Disposal System Regulations.
DESIGN SUMMARY
The existing soil treatment area on the property has failed and the owner is currently
utilizing the existing septic tank as a vault. There is no water supply to the property,
therefore, water use is limited. We have designed a new gravity flow soil absorption
treatment area (STA) that utilizes the existing septic tank. Sewage will continue to flow
to the existing septic tank and the effluent will then gravity flow to the soil treatment area.
The STA will consist of Infiltrator chambers in a single trench. Design flow was based
on the vault tank pumping records provided to us.
SITE CONDITIONS
The property is the current location of the Pitkin Iron facility, which is a custom steel
fabrication business. There is an existing metal office and shop structure on the property
that is approximately 120 feet long by 80 feet wide, see Figure 1. There are a variety of
other sheds, steel racks and storage areas throughout the property. There is no water
service at the property. Water is trucked in to the site for limited use primarily for
bathrooms. The site has been generally graded flat. Most of the site is developed with
sheds, steel racks and other storage areas. Access roads are located throughout the
property. There are no water wells near the site that we are aware of.
Job No. 114 080A
GecPtech
-2 -
SUBSURFACE CONDITIONS
The field exploration for the project was conducted on March 24, 2013. One Profile Pit
and three percolation test holes (P-1, P-2 and P-3) were excavated at the approximate
locations shown on Figure 1 to evaluate the subsurface conditions. The pit was logged by
a representative of Hepworth-Pawlak Geotechnical (H -P Geotech). No free water was
encountered during our observations and the soils were generally moist. A log of the
Profile Pit is provided below.
710
Log of Profile Pit
0-7'
CS01.. i001.0ps (GreltH '1)61;
SAND AND GRAVEL (SC -GC); clayey with cobbles and boulders, medium dense,
slightly moist, brown.
• Bottom of pit @ 7feet.
• No free water was observed in the pit at the time of observation.
PERCOLATION TESTING
Percolation tests were performed in three test holes by a representative of H -P Geotech on
March 24, 2014. The tests were completed at depths of 32 to 42 inches below the
adjacent ground surface. The percolation test results, provided in Table 1 indicate an
average percolation rates in each test hole of 40 minutes per inch with an overall average
design percolation rate of 40 minutes per inch. The design percolation rate corresponds
to a Long -Term Acceptance Rate of 0.4 gallons per square foot per day.
OWTS ANALYSIS
The subsurface subsoil conditions at the site are suitable for a conventional absorption
system consisting of infiltrators in a trench configuration using the natural soils for final
disposal of the effluent. Based on our site observations and the site contours, it appears
gravity flow from the tank to the soil treatment area is feasible. The existing tank appears
adequate for incorporation into the system and will be used for primary treatment. A long
term acceptance rate (LTAR) of 0.40 will be used to size the absorption field. The system
Job No. 114 080A
Gtech
-3 -
will be designed on water usage as approximated from the pumping records for the
existing tank being used to collect disposed water from the building.
DESIGN RECOMMENDATIONS
The recommendations presented below are based on the site and subsurface conditions,
the proposed construction and our experience in the area. If conditions encountered
during construction are different than those that are described in this report please contact
us and we will re-evaluate our recommendations.
SOIL TREATMENT AREA
• The soil treatment area will be 138 square feet and will consist of one trench with
14 Infiltrator Quick 4 Standard chambers.
• Since the site has no water supply and limited water use, the estimated design
flows based on the pumping records from January 20, 2012 through September
30, 2013, the 1,000 gallon tank was pumped on average every 28 days. This
equates to an average daily flow of 35.7 gallons per day. Design flow is 150% of
the average daily flow or 54 gallons per day. Absorption area calculations are
presented on Figure 3.
• An area of 9.87 square feet was applied for each chamber per Garfield County
guidelines.
• No reductions in absorption area size were applied.
• A minimum of 12 inches and a maximum of 36 inches of cover soil should be
placed over the infiltration chambers.
• Backfill should be graded to deflect surface water away from the absorption area
and should be sloped at 3H:1 V maximum.
• The trench backfill and nearby disturbed soil should be re -vegetated immediately
with a native grass mix. No trees, shrubs or other plants with deep roots should be
planted on or near the absorption area as this may damage infiltrators and piping.
• Four inch diameter inspection ports should be installed at each end of the trench.
The inspection port piping should be placed in the knockouts provided in the
Job No. 114 080A
GFPtech
-4 -
chambers. The inspection ports should extent at least 8 inches above the final
graded ground surface. At least twelve, 1/2 inch holes should be drilled in the
above grade portion of the inspectionports for ventilation.
• A plan view of the design absorption area is provided as shown on Figure 4 and a
cross section of the absorption area is presented provided as shown on Figure 5.
• Due to the potential for vehicular traffic in the area of the proposed soil treatment
area, we recommend the area be protected with bollards or fencing. Vehicular
traffic can lead to premature failure of the soil treatment area.
OWTS COMPONENTS
Recommended OWTS components were based on our design details and our experience
with the specific component manufacturers. Equivalent components may be used if
desired; however, they must meet our minimum recommendations and should be verified
by the design engineer.
Septic Tank
• There is an existing 1,000 gallon, two chamber concrete septic tank being utilized
on the property. We have proposed to continue to utilize the existing septic tank
for primary treatment due to limited non -traffic areas for a new tank, and the
existing tank appears to be performing adequately.
• An effluent filter should be installed in the septic tank outlet tee.
• The existing tank does not meet the required 10 foot setback to the property
boundary as shown on Figure 2; however, the owner would like to petition for
continued use of the previously approved location. D
• Due to the potential for vehicular traffic in the area of the existing septic tank, we
recommend the location be protected with bollards or fencing. The tank is not
likely traffic rated and could become damaged by heavy loads that frequent the
property.
Sewer Pipe
• The existing sewer line from the building to the septic tank will remain. We did
not verify the construction or condition of the pipe.
Job No. 114 080A
Gtech
-5-
• A cleanout was not observed where the sewer line exits the building. We
recommend a cleanout be installed within 5 feet of the structure. It may be
desirable to provide a new pipe depending on the condition of the exposed pipe.
Effluent Transport Piping
• The 4 inch diameter non -perforated SDR35 effluent transport piping should be
sloped at 2% minimum to drain to the soil treatment area.
• The effluent transport pipe should be bedded in compacted'/ inch road base or
native soils provided that the native soils contain no angular rocks or rocks larger
than 2A inches in diameter to help prevent settlement of the pipe. Sags could
cause standing effluent to freeze and damage piping.
• A minimum 24 inches of soil cover should be provided over the effluent transport
pipe. Paved areas, patiosor other areas without vegetative cover may be more
susceptible to frost. We recommend at least 48 inches of soil cover over the sewer
pipe in these areas. If adequate cover soil is not possible the sewer pipe should be
insulated on top and sides with 2 inch thick foam insulation board and the design
engineer should re-evaluate soil cover prior to installation.
• The sewer pipe should be double encased with larger diameter Schedule 40 PVC
pipe underneath driveway surfaces and be provided with at least 48 inches of soil
cover.
• All 90 degree bends should be installed using a 90 degree long -sweep or by using
two 45 degree elbows.
OWTS OPERATION AND MAINTENANCE
The OWTS will require periodic inspection and maintenance to function properly. A
properly designed, installed and maintained system can greatly increase its lifespan. The
level of maintenance will vary with the complexity of the system and water use habits of
the residents. We recommend that an OWTS Operation and Maintenance (O&M)
Manual be developed for the system to ensure that it is properly maintained. Depending
on the complexity of the system a contract with an OWTS maintenance provider may also
be prudent. Below are some basic recommendations for OWTS O&M.
Job No. 114 080A
GecPtech
-6-
OWTS OPERATION
• Fix plumbing leaks immediately as this may cause a hydraulic overload of the soil
absorption system.
• Do not irrigate the area on top of or directly upgradient of the soil treatment
absorption area as this may cause hydraulic overload.
• Do not dispose of waste down drains as this may clog or damage OWTS
components. Examples of waste that should not be disposed of in drains include:
dental floss, cotton swabs, coffee grounds, paper towels, feminine products and
many other kitchen and bath items. If a garbage disposal is utilized, wastewater
should be screened thoroughly.
• Do not dispose of chemicals, greases, oils, paints, hot tub water or water softener
backwash in household drains.
• Limit the use of bleach as this may harm useful bacteria in the septic tank and soil
absorption system.
• The water in septic tanks can freeze during extended periods of non-use. A tank
heater could be provided to help prevent freezing.
OWTS MAINTENANCE
• Inspect the septic tank, effluent filter and soil absorption area at least annually for
problems or signs of failure.
• The effluent filter should be cleaned annually by spray washing solids from the
filter into the first chamber of the septic tank.
• Septic tank should be pumped and cleaned every 3 to 5 years depending on use.
Longer pumping intervals may increase the amount of solids that reach the soil
absorption area, which may shorten its life span.
• Pumping should take place when the level of the sludge and scum layers
combined take up about 25 to 33% of the capacity of the first chamber of the
septic tank.
Job No. 114 080A
GecPtech
-7-
OWTS CONSTRUCTION OBSERVATION
Due to the relatively tight setback constraints on the site, we recommend that all OWTS
components be field staked and verified by a representative of H -P Geotech prior to
starting excavation. Following confirmation of component locations, the Garfield County
Building Department requires that the design engineer perform an As -Built inspection of
the OWTS. Prior to inspection, all system components should be installed, but not
backfilled. No components should be backfilled without prior approval by H -P Geotech.
LIMITATIONS
This design study has been performed in accordance with generally accepted engineering
principles and practices in this area at this time. We make no warranty either expressed
or implied. The conclusions and recommendations submitted in this report are based
upon the data obtained from the profile pit and percolation test holes, the proposed type of
construction and our experience in the area. Variations in the subsurface conditions may
not become evident until excavation is performed. If conditions encountered during
construction appear different from those described in this report, we should be notified so
that re-evaluation of the recommendations may be made.
This report has been prepared for the exclusive use by our client for design purposes. We
are not responsible for technical interpretations by others of our information. As the
project evolves, we should provide continued consultation and field services during
construction to review and monitor the implementation of our recommendations, and to
verify that the recommendations have been appropriately interpreted. Significant design
changes may require additional analysis or modifications to the recommendations
presented herein.
It is our opinion that the designed location of the OWTS does not violate any setback
requirements of the current Garfield County Individual Sewage Disposal System (ISDS)
Regulations of any features that are offsite. Below is a table of common minimum
horizontal setbacks to OWTS components. Refer to the Garfield County ISDS
Regulations for a complete list of required setbacks. We recommend the OWTS
Job No. 114 080A
Gtech
-8 -
components be surveyed by a Professional Colorado Land Surveyor and verified by H -P
Geotech prior to permitting.
Table 1 - Common Minimum Horizontal Setbacks from OWTS Components
Please contact us for any necessary revisions o • discussion after review of this report by
Garfield County. If you have any questions, or if we may be of further assistance, please
let us know.
Sincerely,
HEPWORTH-PAWLAK GEOTECHNICAL, INC.
/r9ea &i
Jason A. Deem
Project Geologist
Reviewed by:
David A. Young, P.E.
Sr. Project Engineer
JAD/ksw
Job No. 114 080A
~Ptech
Wells
Water
Supply
Line
Occupied
Dwelling
Lined
Ditch
or
Lake
Lake,
Irrigation
Ditch,
Stream
Dry
Ditch
or
Gulch
Septic
Tank
Absorption
Area
100'
25'
20'
20'
75'
25'
6'
Septic
Tank
50'
10'
5'
10'
50'
10'
Building
Sewer
50'
10'
0'
10'
50'
10'
Please contact us for any necessary revisions o • discussion after review of this report by
Garfield County. If you have any questions, or if we may be of further assistance, please
let us know.
Sincerely,
HEPWORTH-PAWLAK GEOTECHNICAL, INC.
/r9ea &i
Jason A. Deem
Project Geologist
Reviewed by:
David A. Young, P.E.
Sr. Project Engineer
JAD/ksw
Job No. 114 080A
~Ptech
Approximate Scale:
1 inch = 800 feet
Drawing adapted from Google Earth Images
114 080A
Gtech
HE PWORTH-PAW LAK GEOTECFINICAL
LOT 4, COKE OVENS EXEMPTION
SITE LOCATION PLAN
FIGURE 1
--
RCALER
PROPOSED SOIL TREATMENT
AREA CONSISTING OF ONE
ROW OF 14 INFILTRATOR QUICK
4 PLUS CHAMBERS
PROPOSED CLEANOUT
EXISTING 1,000 GALLON,
TWO CHAMBER
CONCRETE SEPTIC TANK
_
II Profile Pi\
H -P GEOTECH RECOMMENDS THAT THE
SOIL TREATMENT AREA AND SEPTIC
TANKBE PROTECTED FROM POTENTIAL
DAMAGE BY VEHICULAR TRAFFIC BY
MEANS OF BOLLARDS OR FENCING
APPROXIMATE SCALE:
SCALE:
1 INCH = 40 FEET
Legend
•1 Profile Pit
A Percolation Test Hole
114 080A
Gtech
HEPWORTH-PAWLAK GEOTECHNICAL
LOT 4, COKE OVENS EXEMPTION
OWTS SITE PLAN
FIGURE 2
OWTS ABSORPTION AREA CALCULATIONS
In accordance with the current Garfield County Individual Sewage Disposal System Regulations,
the absorption area was calculated as follows:
CALCULATION OF OWTS DESIGN FLOW:
WHERE:
Q = AVERAGE DAILY FLOW BASED ON PUMPING RECORDS
1.5 = DESIGN FLOW IS 150% OF AVERAGE DAILY FLOW
Q.
AVERAGE DAYS PER PUMPING =
DESIGN FLOW =Q*1.5=
CALCULATION OF OWTS ABSORPTION AREA:
MINIUMUM ABSORPTION AREA = Q _ LTAR
;WHERE:
,Q=
t - PERCOLATION RATE =
COORESPONDING LTAR =
;MINIMUM ABSORPTION AREA =
AREA PER INFILTRATOR QUICK 4 PLUS STANDARD CHAMBER;
TOTAL CHAMBERS NEEDED =
1000 GALLONS
28.0'
35,7; GALLONS
53.6 GALLONS
PER MONTH
PER DAY
PER DAY
'NUMBER OF TRENCHES =
LENGTH (NUMBER OF CHAMBERS PER TRENCH) =
TOTAL NUMBER OF CHAMBERS =
TOTAL ABSORPTION AREA =
1000 GALLONS PER DAY
40 MINUTES PER INCH
0.4
133.9 SQUARE FEET
9.87 SQUARE FEET
14CHAMBERS
1.TRENCH •
14 CHAMBERS
14 'CHAMBERS
138•, SQUARE
FEET
114 080A GPtech
HEPWORTH.PAWLAK GEOTECHNICAL
LOT 4, COKE OVENS EXEMPTION
ABSORPTION AREA CALCULATIONS
IFIGURE 3
APPROXIMATE SCALE:
1 INCH = 10 FEET
4 inch diameter PVC air vent
installed vertically into
knockouts provided in end
caps. Install vents at each end
of each trench. Removable lid
to be placed on top of pipe,
Pipe must stick up at least 8
inches above finished grade.
Extend 4" non -perforated
SDR35 pipe to connection
between end plate and
first chamber. End of pipe
to be open.
Fourteen Infiltrator Quick 4
Plus Standard Chambers.
4" diam. non -perforated
SDR35 pipe sloped at 2% min.
from septic tank to trench
j WOJd MOW Bulgy
Notes:
1. Chambers should be installed level on a scarified ground surface. A leveling course of
concrete sand may be used if necessary.
2. All piping should have a rating of SDR35 or greater.
3. Changes to this design should not be made without consultation and approval by HP Geotech.
114 080A
1 HEPWORTH.PAWLAK GEOTECHNICAL
Infiltrator Quick 4 Plus
Standard End Caps.
Ge Ptech
LOT 4, COKE OVENS EXEMPTION
ABSORPTION AREA PLAN VIEW
IFIGURE 4
APPROXIMATE SCALE:
1 INCH = 4 FEET
Infiltrator Quick
4 Plus Standard
End Cap
Approx. Existing Ground Surface
24-36" Cover Soil
Graded to Deflect
Surface Water
Scarify Ground Surface and
Provide Sand Leveling Course
as Needed.
Prior to Chamber Installation
Notes:
1. Chambers should be installed level on a scarified ground surface.
2. All piping should have a rating of SDR35 or greater.
3. Care should be taken by the contractor to avoid compaction of the
native soils in the trench areas.
4. Concrete sand may be used as a leveling course beneath the
chambers if necessary.
5. Changes to this design should not be made without consultation
and approval by HP Geotech.
114 080A
Ge Piech
HEPWORTH-PAWLAK GEOTECHNICAL
LOT 4, COKE OVENS EXEMPTION
ABSORPTION AREA CROSS SECTION
FIGURE 5
HEPWORTH-PAWLAK GEOTECHNICAL, INC.
TABLE 1
PERCOLATION TEST RESULTS
JOB NO. 114 080A
HOLE NO.
HOLE DEPTH
(INCHES)
LENGTH OF
INTERVAL
(SEC)
WATER DEPTH
AT START OF
INTERVAL
(INCHES)
WATER DEPTH
AT END OF
INTERVAL
(INCHES)
DROP IN
WATER LEVEL
(INCHES)
AVERAGE
PERCOLATION
RATE
(MIN./INCH)
P-1
32
10
5%
5%
40
5%
534
'4
5%
5
5
4'
%
P-2
36
10
7
61/4
1/4
40
6'
634
14
634
634
y,
634
6
/,
P-3
42
10
6%
6
Y:
40
6
5%
24
5:4
5334
34
534
5
Y<
Note: Percolation test holes were hand dug in the bottom of backhoe pits and soaked on March 23,
2014. Percolation tests were conducted on March 24, 2014 by a representative of H -P Geotech.
The average percolation rates were based on the last two readings of each test.