Loading...
HomeMy WebLinkAboutE-mail Correspondence.pdfJim Wilson From: Brad Jordan[jordanarchitect@gwestoffice.netj Sent: Thursday, November 08, 2012 2:39 PM To: Jim Wilson Cc: Cox Brothers Construction; hco@tds.net Subject: Re: Lot 82, Elk Springs Report for Job No. 112 295B Jim, Upon review at the site of B and C Development, it was observed that we had an area that the footing and foundation needed to be modified to accommodate the existing condition. The area in question was determined to be in need of: 2 #5 bars top and bottom of the foundation Vertical bars/ties at 9" o.c. Hooked bars into adjacent wall 2 #5 diagonal 'slash bars', tieing the wall together Please feel free to contact me with any additional questions. Respectfully, Brad Jordan Original Message From: Brad Jordan To: jwilsonna,garfield-countv.com Cc: Cox Brothers Construction Sent: Friday, November 02, 2012 2:21 PM Subject: Fw: Lot 82, Elk Springs Report for Job No. 112 2953 Jim, As requested, attached is the excavation observation report from HP Geotech. The second to last paragraph addresses the brownish clayey soils encountered in the garage footing area. As recommended, we widened the footings in these areas by 12" overall, to accommodate the 1000 psf bearing capacity noted in this paragraph. We will provide a detail and notations pertaining to the foundation wall connection, to the footings at the entry step, prior to or at the next inspection. Please feel free to contact me with any questions. Respectfully submitted, Brad Jordan Architect Original Message From: Lena Galliher To: Matt Cox ; Brad Jordan Sent: Friday, November 02, 2012 2:39 PM Subject: Lot 82, Elk Springs Report for Job No. 112 2953 Please see attached report. If you have any questions please give us a call. Thank you, Lena Lena Galliher 1