Loading...
HomeMy WebLinkAbout4.0 ApprovalGarfield County BUILDING & PLANNING DEPARTMENT June 4, 2003 Paul G. Lans. P.E. Project Engineer Colorado State Parks P.O. Box 56 Clifton, Colorado 81520 Re: Rifle Gap State Park Wastewater Treatment Plant Site Application Dear Mr. Lans: Enclosed is a signed copy of the Rifle Gap State Park Wastewater Treatment Plant Site Application. The Board of County Commissioners and County Board of Health have both signed it, with a recommendation of approval. If you have any questions, please call this office and we will respond as quickly as possible. Sincerely, � ✓� Mark L. Bean, Director Building & Planning Department 108 8th Street, Suite 201, Glenwood Springs, Colorado 81601 (970) 945-8212 (970) 285-7972 Fax: (970) 384-3470 APPLICATION FOR SITE APPROVAL FOR CONSTRUCTION OF LIFT STATIONS AND INTERCEPTOR SEWERS 14. The proposed lift station or interceptor sewer, when fully developed, will increase the loading of the treatment plant to 75 % of hydraulic and 75 % organic capacity and Colorado State Parks agrees to treat this wastewater? �.Yes ❑ No (Name of Treatment Agency) Y/3/o3 J C /,Vi/ y)c�n ccr (Date) (Signature and TN B. If the facility will be located on or adjacent to a site that is owned or managed by a federal or state agency, send the agency a copy of this application for the agency's review and recommendation. C. Recommendation of governmental authorities: The application shall be forwarded to the planning agency of the city, town, or county in whose jurisdiction(s) the lift station and/or interceptor sewer is to be located. The applicant shall obtain, from the appropriate planning agency (agencies), a statement(s) of consistency of the proposal with the local comprehensive plan(s) as they relate to water quality (subject to the provisions of 22.3(6)). The application shall be forwarded to the water quality planning agency (agencies) for the area in which the facilities are to be constructed and for the area to be served by those facilities. The applicant shall obtain, from the appropriate planning agency (agencies), a statement(s) of consistency of the proposal with any adopted water quality management plan(s). If you have any further comments or questions, please call (303) 692-3500. Recommend Date Approval i 2. 612140 x I certify that I am familiar with the requirements of the "Regulations for Site Treatment Works ", and have posted the site in accordance with the regulE described by the regulations, has been prepared and is enclosed. An enoine6ring report, as DATE Signature of Applicant Typed Name