Loading...
HomeMy WebLinkAboutEngineer Report 01.21.2014.pdfHuddleston -Berry Engineering & Testing, LLC Cheryl Gonzalez 246 West Capital Court New Castle, Colorado 81647 Subject: 1SDS Design 350 Cedar 1-Iills Road Silt, Colorado 640 White Avenue Grand Junction, CO 81501 Phone: 970-255-8005 Fax: 970-255-6818 1i u d d 1 e s t o n B c rry @ b re s n a n. n et www.HBET-GJ.com January 21, 2014 Project#01313-0001 Reference: Geotechnical Investigation and ADS Feasibility, 350 Cedar Frills Road, Sili, Colorado by Huddleston -Berry Engineering & Testing, LLC for Cheryl Gonzalez, December 9, 2013. - Dear Ms. Gonzalez, At your request, I-Iuddleslon-Berry Engineering & Testing, LLC completed design of an individual Sewage Disposal System (ISDS) for a single-family residence at 350 Cedar Hills Road in Silt, Colorado. The site location is shown on Figure 1 — Site Location Map. A site plan is included as Figure 2. Individual Sewage Disposal System As discussed in the referenced report, the subsurface soils at the site consist of sandy lean clay. Groundwater was not encountered in the test pits on the lot at the time of the investigation. Copies of the test pit logs from the referenced report are attached, The referenced report also includes the results of percolation testing conducted on the lot in the vicinity of the proposed absorption field. The percolation rale in the native soils was determined to range from 7 to 16 minutes -per -inch with an average of approximately 11 minutes -per -inch. The percolation testing data from the referenced report is attached. 111 general, a percolation rate of between 5 to 60 minutes -per -inch is required for soils to be deemed suitable for on-site sewage disposal. Therefore, based upon the results of the percolation testing, the native soils are generally suitable for on-site sewage disposal. 350 Cedar Hills Road #01313-0001 01/21/14 HuddlcMOn•Bcny 1 gS.CY-1trnSp11r In addition to the percolation rate of the subsurface materials, the seasonal high groundwater elevation is an important factor in determining the suitability of the site for Individual Sewage Disposal Systems. For ISDS suitability, the seasonal high groundwater elevation should be at least four feet below the bottom of the proposed absorption bed. As discussed previously, groundwater was not encountered at the time of the investigation. In general, based upon the results of the subsurface investigation, HBET believes that the seasonal high groundwater elevation at this site is deeper than 10.0 feet below the existing ground surface. Seepage Bed Design The proposed construction at the site is anticipated to include an approximately 3,650 square -feet residential structure with three bedrooms. A clothes washer and garbage disposal are .anticipated. Infiltrator Systems Quick4 Standard Chambers are proposed in lieu of a conventional gravel absorption bed. For conservatism, a soil percolation rate of 30 minutes -per -inch will be utilized for the absorption field design. The maximum daily flow of the sewage disposal system and bed area are calculated below. Base Residential Flow = (3 bedrooms)(2 persons/bedroom)(100 GPD/person) = 600 GPD Average Daily Flow = (600 GPD)(1.0+0.4+0.2) = 960 GPD Maximum Daily Flow = (960 GPD)(1.5) =1,440 GPD Standard Bed Area = [(1,440 GPD)(30 min/in)°'5]15 =1,578 Square Feet Reduced Area for Infiltrators = (1,578112)(0.60) = 947 Square Feet # of Quick4 Chambers = (947 / 9.2) = 103 Chambers System Installation The installation of the septic tank, plumbing lines, absorption bed, etc. should be completed in accordance with Garfield County regulations and Infiltrator Systems specifications. In addition, the following construction procedures are recommended: • The septic tank and distribution box should be placed level over native soils that have been scarified to a depth of 8 to 12 inches, moisture conditioned, and recompacted to a minimum of 95% of the standard Proctor maximum dry density, within ±2% of optimum moisture content. However, up to 3 -inches of washed rock or pipe bedding passing the 1 -inch sieve may be used as a leveling course under the septic tank and/or distribution box. • The bottoms of trenches and backfill around the septic tank and distribution box which will support sewer or effluent lines should be compacted to at least 90 percent of the standard Proctor maximum dry density, within 12% of optimum moisture content. Pipe bedding should have a maximum particle size of 1 -inch. • Vehicular or heavy equipment traffic and placement of structures should not encroach within 10 feet of the septic tank or distribution box. 1012009 ALL PROJECTS01313-CheniGnmalri 01313.04101 350 Qdn Hdl, RoadQW - O�01313-0001 LR012114 doe 2 350 Cedar Hills Road H01313.0001 01/21/14 Huddlesto33.Bem' Inspection Schedule Huddleston -Berry Engineering & Testing LLC should be retained to monitor the constmction of the ISDS. The following schedule of observation and/or testing should be followed: • Observe the absorption bed excavation prior to placement of Infiltrator chambers. • Observe placement of the septic tank, distribution box, and all connecting sewer and effluent lines prior to backfill. Verify proper fall between inverts. • Observe and verify installation of the Infltrator absorption bed prior to placement of cover and backfill. General Notes The ISDS design was based upon the results of the subsurface investigation and on our local experience. The design is valid only for the proposed construction We are pleased to be of service to your project. Please contact us if you have any questions or comments regarding the contents of this report. Respectfully Submitted: Huddleston -Berry Engineering and Testing, LLC Michael A. Berry, P.E. Vice President of Engineering 11"2603 ALL PROJECTS 01313. Chc01 Gomalri 01313-W01 310 Cedar Hills Rod 200- Goi01313-13001 01313-O&OI LR0121 U Joc 3 ATTACHMENTS Mountwri .1 ` • �! ;i%1.•11��`,–� , l�f//4,1 kyCAJi G -- WARE 5540' - -- -- _ _ ' iA USGS New Castle, Colorado Quadrangle 7.5 -"Minute Series7962, Photorevised 1987 f/`�� —� .. rs o '// «q:rii. • ( r��i- - J Illi:L>L' r lll� I1 I o°, ;L„ -, �" C ( FIGURE I I, . Site Location Map � n1= 9 7- \ 0 0 0 0 1-1 E (D N 4� ABSORPTION BED PLAN a z2 of re U E. NOT TO SCALE 0 Z� s4aw F a'p LL O m0mj 0 0 of �Oa mµ L 6 mO OW 350 CEDAR HILLS ROAD Project No.: 01313-0001 3 co0 rc 2 • o —, Huddleston -Bent' Engineering & Testing. LLC 640 White Avenue. Unit B Grind Junction, CO 81501 970-255.8005 970-255-6818 Gonzalez PROJECT NAME LOCATION TEST PIT NUMBER TP -1 PAGE 1 OF 1 350 Cedar Hills Rd CLIENT PROJECT Cheryl NUMBER 01313-0001 PROJECT Silt, CO DATE EXCAVATION EXCAVATION LOGGED NOTES STARTED BY 11/6/13 COMPLETED 11/6/13 GROUND ELEVATION WATER LEVELS: TIME OF EXCAVATION END OF EXCAVATION EXCAVATION TEST PIT SIZE CONTRACTOR R&S Trucking GROUND dry METHOD Backhoe AT NWB CHECKED BY MAB AT dry AFTER -•- I. c 0.0 c7 i O MATERIAL DESCRIPTION SAMPLE TYPE NUMBER RECOVERY % • (ROD) BLOW COUNTS (N VALUE) POCKET PEN. (tsO DRY UNIT WT. (Pc!) MOISTURE CONTENT (%) ATTERBERG LIMITS FINES CONTENT (°A ) LIQUID LIMIT PLASTIC LIMIT (7.56 0. ''—k'.= L !! GEOTECH BH COIUM '� CLIENT PROJECT „rw Iluddleston•Bem•Engineering & Testing. LLC \ 6!0 White Avenue. Unit B Grand Junction. CO 81501 970-255-8005 = 970.255.6318 Cheryl Gonzalez PROJECT NAME LOCATION TEST PIT NUMBER TP -2 PAGE 1 OF 1 350 Cedar Hills Rd NUMBER 01313.0001 PROJECT Siff CO DATE EXCAVATION EXCAVATION LOGGED NOTES STARTED BY 11/6/13 COMPLETED 11/6/13 GROUND ELEVATION WATER LEVELS: TIME OF EXCAVATION END OF EXCAVATION EXCAVATION TEST PIT SIZE CONTRACTOR R&S Trucking GROUND dry METHOD Backhoe AT NWB CHECKED BY MAB AT dry AFTER --- w c 0 0 GRAPHIC LOG MATERIAL DESCRIPTION SAMPLE TYPE NUMBER K ,-- o IX to ts BLOW COUNTS (N VALUE) POCKET PEN. (tst) co a o MOISTURE CONTENT (%) ATTERBERG LIMITS FINES CONTENT (%) LIQUID LIMIT PLASTIC LIMIT PLASTICITY INDEX - '' IC t, ,' Sandy Lean CLAY with Organics (TOPSOIL), brown, moist 2 tSandy y///% Lean CLAY (el), brown, moist, medium stiff 1 _01 _ 3 4 Bottom of test pit at 3.0 feet. •- CLIENT PROJECT , .1 / • Cheryl Huddleston-BenyEngineering R Testing. LLC 640 White Avenue, Unit B Grand Junction, CO 81501 970.255.8005 970-255-6818 Gonzalez PROJECT TEST PIT NUMBER TP -3 PAGE 1 OF 1 NAME 350 Cedar Hills Rd NUMBER 01313-0001 PROJECT LOCATION Silt, CO DATE EXCAVATION EXCAVATION LOGGED NOTES STARTED BY 11/6/13 COMPLETED 11/6113 GROUND ELEVATION WATER AT TIME OF AT END OF AFTER EXCAVATION TEST PIT SIZE CONTRACTOR R&S Trucking GROUND LEVELS: EXCAVATION EXCAVATION dry METHOD Backhoe NWB CHECKED BY MAB dry --- _ I._ w-- o 0 a00 g� MATERIAL DESCRIPTION a w �� o.j z e WWo >O ore = 3� �>< rno> vi w ° w5 uv 8 �Q r o we ATTERBERG LIMITS z w ^ U° N a. Djw o �v��o.Jgzz oF. 3 v Ft 3a U ,� a _ - _f. .. ;L .,i6 wl,d_ Sandy Lean CLAY with Organics (TOPSOIL), brown, moist 2 jSandy %!//l. Lean CLAY (cl), brown, moist, medium stiff 3 3 1 QJ rgy3 M 3 z z 0 9 0 0 m Y 0 W F O w 0 Bottom of lest pit at 3.0 feet. CLIENT PROJECT „f, 1 Cheryl Huddleston -Berry Engineering & Testing. LLC 640 Jun tionUnit B Grand• Junction,, COC31501 970-255.3005 970-255-6318 Gonzalez PROJECT NAME LOCATION TEST PIT NUMBER TP -4 PAGE 1 OF 1 350 Cedar Hills Rd NUMBER 01313.0001 PROJECT Silt, CO DATE EXCAVATION EXCAVATION LOGGED NOTES STARTED BY 11/6/13 COMPLETED 11/8/13 GROUND ELEVATION WATER LEVELS: TIME OF EXCAVATION END OF EXCAVATION EXCAVATION TEST PIT SIZE CONTRACTOR R&S Trucking GROUND dry METHOD Backhoe AT NWB CHECKED BY MAB AT dry AFTER -- o DEPTH o (g) GRAPHIC LOG MATERIAL DESCRIPTION SAMPLE TYPE NUMBER RECOVERY % (ROD) BLOW COUNTS (N VALUE) POCKET PEN. (tsf) DRY UNIT WT. (Pcf) MOISTURE CONTENT (%) ATTERBERG LIMITS FINES CONTENT (%) o 1– 0— -1 J PLASTIC LIMIT 0 yC Z - CL .1` ,1 ^ Lr4 Sandy Lean CLAY with Organics (TOPSOIL), brown, moist 2.5 yl% 11 Sandy Lean CLAY (el), brown, moist, medium stiff to stiff 5.0 O 7.5 10.0 //' , Bottom of test pit at 10.0 feet. PERCOLATION TESTING Project Name: 350 Cedar Hills Road Location: Silt CO Project No. 01313 - 0001 Test Pit No. TP -2 Date: 11/612013 Testing Conducted By: NWB Supervising Engineer: M. Berry Pit Dimensions: Length Water Level Depth: SOIL PROFILE Depth Description ; Width Not Encountered X ; Depth 3 ft Remarks 0-1 ft Sandy Lean CLAY with Organics (TOPSOIL), brown, moist 1-3 ft Sandy Lean CLAY (el), brown, moist, medium stiff Test Number: 1 Top of Hole Depth: 3 ft Diameter of Hole: 4 in. Depth of Hole: 14 in. Time (min.) Water Depth (In.) Change (in.) 0 1.375 5 3.25 1.875 10 5.375 2.125 15 6.875 1.5 20 8 1.125 25 9 1 30 9.875 0.875 35 '' 10.625 0.75 40 11.25" 0.625 45 11.625 0.375 50 12.5 0.875'C 55 13.375 0.875 60 dry Rate (min/in): I 7 I Average Percolation Rate (min/in): Test Number: Top of Hole Depth: Diameter of Hole: Depth of Hole: Time (min.) Water Depth (in.) Change (in.) Rate (min/in): Test Number: Top of Hole Depth: Diameter of Hole: Depth of Hole: Time (min.) Water Depth (in.) Change (in.) Rate (min/in): PERCOLATION TESTING Project No. 01313 0001 Test Pit No. TP -3 Project Name: 350 Cedar Hills Road Location: Silt CO Date: 11/6/2013 Testing Conducted By: NWB Supervising Engineer: M. Berry Pit Dimensions: Length ; Width ; Depth 3 ft Water Level Depth: Not Encountered X SOIL PROFILE Depth Description -_ 0-1 ft Sandy Lean CLAY with Organics (TOPSOIL), brown, moist "' Sandstone on North side of pit "" 1-3 ft Sandy Lean CLAY (el), brown, moist, medium stiff 5 2.375 1.25 10 2.75 0.375 15 3.625 0.875 20 4.375 0.75 Test Number: 1 Top of Hole Depth: 3 ft Top of Hole Depth: Diameter of Hole: 4 in. Diameter of Hole: Depth of Hole: Test Number: Depth of Hole: 13 in. Time (min.) Water Depth (in.) Change (in.) • 0 1.125 5 2.375 1.25 10 2.75 0.375 15 3.625 0.875 20 4.375 0.75 25 5 0.625 30 5.875 0.875 35 6 0.125 40 7.25 1.25 95 7.5 - 0.25 50 7.75' 025 55 8.125. .0.375 60 8.5 0.375 Rate (min/in): I 16 1 Average Percolation Rate (min/in): Time (min.) Water Depth (in.) Change (in.) Rate (min/in): Test Number: Top of Hole Depth: Diameter of Hole: Depth of Hole: Time (min.) Water Depth (in.) Change (in.) Rate (min/in): PERCOLATION TESTING Project Name: 350 Cedar Hills Road Testing Conducted By: NWB Location: Silt CO Pit Dimensions: Length Water Level Depth: SOIL PROFILE Depth Description Supervising Engineer: ; Width Project No. 01313 0001 Test Pit No. TP -4 Date: 11/6/2013 M. Berry Not Encountered X ; Depth 10 ft Remarks 0-1 ft Sandy Lean CLAY with Organics (TOPSOIL), brown, moist Change (in.) 1-10 ft Sandy Lean CLAY (cl), brown, moist, medium stiff 5 2.25 1 10 2.625 0.375 15 3.375 0.75 Test Number: 1 Top of Hole Depth: 0 ft Diameter of Hole: 4 in. Depth of Hole: 14 in. Time (min.) Water Depth (in.) Change (in.) 0 1.25 5 2.25 1 10 2.625 0.375 15 3.375 0.75 20 4.25 0.875 25 4.75 0.5 30 5.25 0.5 35 5.75 0.5 40 6.5 0.75 45 7, 0.5 50 7.5 0.5 55 8 0.5 60 8.375 0.375 Rate (minlin):11 Average Percolation Rate (min/in): Test Number: 2 Top of Hole Depth: 3.5 ft Diameter of Hole: 4 in. Depth of Hole: 14 in. Time (min.) Water Depth (in.) Change (in.) 0 0.5 5 2 1.5 10 2.875 0.875 15 4.25 1.375 20 5.125 0.875 25 5.625 0.5 30 6.75 1.125 35 7.5 0.75 40 8 0.5 45 9 1 50 9.5 0.5 55 10.25 0.75 60 10.5 0.25 Rate (min/in):10 Test Number: 3 Top of Hole Depth: 6 ft Diameter of Hole: 4 in. Depth of Hole: 14 in. Time (min.) Water Depth (in.) Change (in.) 0 1.125 5 2.625 1,5 10 3.5 0.875 15 4.625 1.125 20 5.5 0.875 25 6 0.5 30 6.875 0.875 35 7.375 0.5 40 8.375 1 45 9.125 0.75 50 9.625 0.5 55 10 0.375 60 10.25 0.25 Rate (min/in):13