HomeMy WebLinkAboutConditions of Permit.pdfCONDITIONS OF PERMIT
BLC0-6-14-3256
EnCana/Hunter Ridge Energy
Divide Rd Water Facility, Booster Pump Bldg .
Parachute, Colorado
1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS .
2) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS. '
3) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT.
4) PRIOR TO CONSTRUCTION, CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC
REQUIREMENTS PER RESOLUTION No. 2013-14. FIRE DISTRICT FINAL APPROVAL REPORT
IS REQUIRED FOR FINAL/COMPLETION INSPECTION .
S) OPEN-HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION, 3000 PSF .
6) IF APPLICABLE , ENGINEER SHALL BE ON SITE DURING PIER INSTALLATION . PROVIDE
APPROVAL REPORT AT FINAL/COMPLETION INSPECTION .
7) VERIFY C.D.0.H. INSIGNIA IS AFFIXED PRIOR TO FINAL/COMPLETION INSPECTION .
8) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION .
9) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.
10) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008.
11) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETrON APPROVAL.