Loading...
HomeMy WebLinkAboutConditions of Permit.pdfCONDITIONS OF PERMIT BLC0-6-14-3256 EnCana/Hunter Ridge Energy Divide Rd Water Facility, Booster Pump Bldg . Parachute, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS . 2) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS. ' 3) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT. 4) PRIOR TO CONSTRUCTION, CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC REQUIREMENTS PER RESOLUTION No. 2013-14. FIRE DISTRICT FINAL APPROVAL REPORT IS REQUIRED FOR FINAL/COMPLETION INSPECTION . S) OPEN-HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION, 3000 PSF . 6) IF APPLICABLE , ENGINEER SHALL BE ON SITE DURING PIER INSTALLATION . PROVIDE APPROVAL REPORT AT FINAL/COMPLETION INSPECTION . 7) VERIFY C.D.0.H. INSIGNIA IS AFFIXED PRIOR TO FINAL/COMPLETION INSPECTION . 8) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION . 9) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 10) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 11) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETrON APPROVAL.