HomeMy WebLinkAboutConditions of Permit.pdfCONDITIONS OF PERMIT
BLCO-6-14-3276
Burning Mountain Land & Cattle, LLC
Telecommunication Equipment Building
Sect31, T05, R90, Talbott Subdivision
New Castle, Colorado
1) ALL WORK SHALL COMPLY WITH THE 2009 IBC, TIA-222, OSHA, FCC, AND EPA
REGULATIONS, AND THE MANUFACTURERS SPECIFICATIONS.
2) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT.
3) ROOMS WITH STORAGE BATTERY SYSTEMS HAVING A LIQUID ELECTROLYTE CAPACITY
OVER 50 GALLONS, OR A LITHIUM -ION CAPACITY OF 1000 POUNDS USED FOR STANDBY
POWER REQUIRES ONE (1) HOUR SEPARATION PER IBC, TABLE 508.2.5.
4) LOCKS, LATCHES, LANDINGS PER 2009 IBC, SECTION 1008.
5) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.
6) VERIFY C.D.O.H. INSIGNIA AFFIXED FOR FINAL INSPECTION.
7) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION.
8) TOWER CONSTRUCTION/ALTERATIONS SHALL BE INSPECTED BY THE ENGINEER ON
RECORD. APPROVAL REPORT IS REQUIRED AT FINAL INSPECTION OF EQUIPMENT BLDG.
9) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL.