HomeMy WebLinkAboutConditions of Permit.pdfCONDITIONS OF PERMIT BLCO-8-12-2603 Justin Rambo AFAB, Inc. OPCO Facility Seven Oaks Road Carbondale, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IFC, IECC AND MANUFACTURERS INSTALLATION SPECIFICATIONS. 2) ALL WORK MUST COMPLY WITH STATE AND LOCAL REGULATIONS. 3) ALL ACTIVITY MUST COMPLY WITH THE COMMUNITY DEVELOPMENT DIRECTOR'S DETERMINATION LETTER DATED SEPTEMBER 24, 2012. 4) STEEL STRUCTURE IS APPROVED AS A SPRINKLERED, TYPE VB, F-1, S-1 OCCUPANCIES. 5) LOCAL FIRE DISTRICT SHALL INSPECT THE NFPA 13 FIRE SUPPRESSION SYSTEM, ALARMS, EXTINQUISHERS, AND OTHER PERTINENT IFC REQUIREMENTS. FIRE DISTRICT FINAL APPROVAL IS REQUIRED FOR CO/FINAL INSPECTION. 6) PROVIDE EXIT SIGNS EQUIPPED WITH EMERGENCY LIGHTING (BATTERY BACKUP) AT ALL EXIT DOORS, SPECIFICALLY IN "DARK AREA" GROWING ROOMS. 7) MAXIMUM ALLOWABLE QUANTITY OF FLAMMABLE AND COMBUSTIBLE MATERIALS PER 2009 IBC, SECTION 414 AND 2009 IFC, CHAPTER 27. 8) ENGINEER APPROVAL LETTER FOR EXISTING BUILDING CONSTRUCTION AND CURRENT ALTERATIONS AND REPAIRS IS REQUIRED FOR CO/FINAL INSPECTION. 9) MECHANICAL COMPLIANCE CERTIFICATE SEALED BY A COLORADO LICENSED DESIGN PROFESSIONAL IS REQUIRED FOR CO/FINAL INSPECTION, 10) PROVIDE NONABSORBANT FLOORS AND 4" BASEBOARDS IN ALL WET AREAS. PLUMBING FINAL APPROVAL LETTER SEALED BY A COLORADO LICENSED DESIGN PROFESSIONAL IS REQUIRED FOR CO/FINAL INSPECTION. 11) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR CO/FINAL INSPECTION. 12) PER ATTACHED SEPTIC REPORT, VERIFY RECOMMENDATIONS ARE COMPLETED. ENGINEERED SEPTIC FINAL APPROVAL LETTER IS REQUIRED FOR CO/FINAL INSPECTION. 13) STATE OF COLORADO MEDICAL MARIJUANA ENFORCEMENT DIVISION (MMED) COMPLIANCE REPORT REQUIRED FOR CO/FINAL INSPECTION. 14) ACCESSIBILITY PER 2009 IBC, CHAPTER 11 AND ICC/ANSI A117.1-2003. EXISTING TOILET ROOM BE CONVERTED TO AN ACCESSIBLE UNISEX TOILET ROOM. 15) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 16) GARFIELD COUNTY CO/FINAL INSPECTION REQUIRED. c„/z&-- 66/7)/