HomeMy WebLinkAboutEngineer Report.pdf,/l//.• ••/W/ /7/:U • ,/f 77.'L% ,/.. 7/, 1 /1/ / 17.%Ai Aly•
DATE: 11 March 2014
PROJECT: Metal Building Inspection
5876 CR 346, Silt Colorado
TO:
Mr. Limbach.
Western Colorado Honey
5945 CR 346
Silt, Colorado 81652
Attn: Mr. Paul Limbach
(960) 309-7162
BAR 1 1 7011
448 Will Avenue
Rifle, Colorado 81650
970-625-2774 Phone
970-625-4399 FAX
westar@rof.net E -Mail
At your request I conducted a site inspection of the pre-engineered metal building at the location referenced
above. In addition, I reviewed the building erection drawings by Sunward Corporation.
From a visual inspection the building members are as shown on the drawings, and there were no signs of missing
components. I inspected the bolts, connections, bracing and attachments, and main frame members.
According the General Notes listed on the drawings dated 10/11/10 the building was designed under IBC 2006,
and for a Roof Snow Load of 50 PSF, a Wind Speed of 90 MPH -Exposure C, and Seismic Class D.
These design criteria meet or exceed the requirements of Garfield County.
If you have any questions please contact me.
Sincerely,
Stephen A. Kesler, P.E.
President
xc: File
i.yeNy 6 oNi,.0 cGD,.3,,,44....:,,
gC:5I. �,0
.a
t• -•S',.
i
Page 1 of 1