HomeMy WebLinkAbout2.0 Permit.pdf11 1:! ~11'·~~ ~J":~\r :N !l,l ~rr r1 ~·:r.1~~~,*~ .. ·1 t'i\•''t'IJI I ~·:~~ ~ 1: :: i
P t .C E.p t JO:"'~t 7 7 ')847
r,· · 1 ~.J:j• ·._,,,(1 'r,.:..·,n
'·I .· r.·~~· , : ~ .. i ...... 1 ~.:: ,, r, ,. ··-~.·: ,-1-1• •:1,,
LAND USE CHANGE PERMIT
to
David and Jill Hopcroft.
for
Hopcroft House Addition Floodplain Development
(County Project No. FDPA-9 -09-6123)
Parcel No. 2393-191-04-006
In accordance with and pursuant to Sections 3-401 , 4-203, 4-503 and 7-701 of the Garfield
County Unified Land Use Resolution of2008, as amended, the Director of the Building and
Planning Department hereby authorizes, by this Administrative Floodplain Development
Permit, the following activity:
In accordance with the plans submitted by Jordan
Architects on September 30, 2009, this permit allows the
construction of a 31 foot by 41 foot residential house
addition in the flood fringe of Roaring Fork River.
The house is located on Lot 6, Filing 5 within the Aspen
Glen Subdivision. The physical address of the house is
160 River Glen Road, Carbondale.
This Administrative Permit is issued subject to the conditions set forth in Exhibit A (attached
hereto), and shall be valid only during compliance with such conditions and other applicable
provisions of the Garfield County Unified Land Use Resolution of2008, the Building Code,
and other regulations of the Board of County Commissioners of Garfield County, Colorado.
BUILDING AND PLANNING DEPARTMENT,
GARFIELD COUNTY, COLORADO
t ~ Fred A . Jann ~
)
Building & Planning Department, Director
Dat~
EXHIBIT A
FLOODPLAIN DEVELOPMENT PERMIT-Hopcroft
House Addition; Aspen Glen Subdivision, Lot 6 Filing 5
Owner: David and Jill Hopcrofl
1. No grade changes can occur or obstructions placed in the floodway identified
on the site plans.
2. In accordance with Section 7-203 of the County Land Use Resolution of2008,
no land disturbance can occur within 35-feet of ordinary high water line of the
stream. Prior to construction, a silt fence must be placed along this 35-foot
buffer line to prevent sediment from entering the stream buffer and to also
remind equipment operators that they can not enter the buffer zone.
3. All representations made in the application shall be considered conditions of
approval , unless modified by this Exhibit A.
4. No alterations of the floodplain may be made other than the specific
improvements noted in the application.
5. All new construction or substantial improvements shall be designed (or
modified) and adequately anchored to prevent flotation, collapse or lateral
movement of the structure resulting from hydrodynamic and hydrostatic loads,
including the effects of buoyancy.
6. All new construction or substantial improvements shall be constructed by
methods and practices that minimize flood damage.