HomeMy WebLinkAbout2.0 Permit.pdf1111~,,,·.~:tM~,,~';,,1~r ,r.m~rr=rr~·~~~~1~~1r 1 '1,~11l l l 11:
Rece ption": 767616
05/0 6 /2 009 03 :3 1 :56 PM Jean Al berico
1 of 2 Rec Fee :$0 .00 Doc Fee :O 00 GARFIELD CO UNTY CO
ADMINISTRATIVE PERMIT
for
FLOODPLAIN PERMIT-Satank Bridge,· Section 28,
Township 7S, Range 88W,· Applicant and Owner : Garfield
County
Parcel ID: none (right-of-way)
In accordance with and pursuant to Sections 3-401, 4-203 , 4-503 and 7-701o f the Garfield
County Unified Land Use Resolution of 2008, the Director of the Building and Planning
Department hereby authorizes by Administrative Permit the following activity:
In accordance with the submitted application
received April 30, 2009, activities in the 100-year
floodplain of the Roaring Fork River related to
reconstructing the Satank Bridge.
The Administrative Permit is issued subject to the conditions set forth in Exhibit A (attached
hereto), and shall be valid only during compliance with such conditions and other applic able
provisions of the Garfield County Zoning Resolution, Subdivision Regulations , Building
Code, and other regulations of the Board of County Commissioners of Garfield County,
Colorado.
BUILDING AND PLANNING DEPARTMENT,
GARFIELD COUNTY, COLORADO
Director
Planning Department C ase No.: FLP4709, May 1, 2009
Date
-1111 ~111''* ~~1 1~i'llf 1 ,~1/ 1rt',r rP.1t1~~~tr,1·~l~'·~1~1t 1~~ ~1111: 111
Reception~: 767616
05/06 /20 09 03 ·31 ·56 PM Jean A lbe~ico
2 of 2 Rec Fee $0 00 Doc Fee 0 00 GARFIELD COUNTY CO
EXHIBIT A
FLOODPLAIN PERMIT -Satank Bridge,· Section 28,
Township 7S, Range 88W,· Applicant and Owner: Garfield
County
1. All representations made in the application shall be considered conditions of
approval, unless modified by this Exhibit A.
2. No alterations of the floodplain may be made other than the specific
improvements noted in the application .
3. All new construction or substantial improvements shall be designed (or
modified) and adequately anchored to prevent flotation, collapse or lateral
movement of the structure resulting from hydrodynamic and hydrostatic loads,
including the effects of buoyancy .
4. All new construction or substantial improvements shall be constructed with
materials resistant to flood damage.
5. All new construction or substantial improvements shall be constructed by
methods and practices that minimize flood damage.
6. No disturbance of a regulated wetland will be allowed.
7. The boundaries of the 100-year floodway and adjacent properties shall be
staked prior to site disturbance.
8 . Prior to starting construction, the County Engineering Department will need to
obtain the necess ary construction easements and an Army Corps permit for
activities in the floodway.