Loading...
HomeMy WebLinkAboutConditions of Permit.pdfCONDITIONS OF PERMIT BLC0-8-14-3328 Chevron USA, Inc Pig Receiver C.D.O.H. Skid Bldg . NWNW Sec3, TSS, R97W, 6th PM DeBeque, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS . 2) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS . 3) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT . 4) VERIFY C.D .0 .H. INSIGNIA IS AFFIXED PRIOR TO FINAL/COMPLETION INSPECTION . 5) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION . 6) LIGHT AND VENTILATION PER 2009 IBC , CHAPTER 12. 7) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 8) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL.