Loading...
HomeMy WebLinkAboutClarification of Building Permit IssuesCHRISTOPHER KRABACHER ARCHITECT P.O. Box 2592, Grand Junction, Colorado 81502 (970) 243-3587 (office) (970) 640-8831 (cell) ckouray@yahoo.com August 15, 2012 To: Garfield County Building Department Clarification of Building Permit Issues for the Pavillion Project Permit Address: County Road 252, Rifle, Colorado Owner/Contractor: Jolley -Potter Ranches, LLC Flag Creek Ranch at Big Mountain (970) 625-2882 Mr. Jarman & Mr. Schwaller In reply to the letter dated August 14 here is my response to your concerns and comments. The original project was for a residential cabin with the design beginning in October of 2010. It evolved into what is currently under construction. The IBC code that I used (originally) was the 2006, but the most recent flurry of fast-track design utilizes the 2012. I hope that isn't a problem, since the way I see it is the cabin might be complete after Garfield County adopts the latest code (2012), given the bureaucratic entanglements this project has encountered... but I detract from my clarifications. 1)The structure is currently a mixed-use occupancy (A-2 -2318 Square Feet, R-3 -928 Square Feet. & 11— 2260 Square Feet) . 2) Per IBC Table 508.4, and IBC2012-420 & 508.3, we're allowed a 1 -hour fire separation between the A-2 & R-3 occupancies due to the square footage & height requirements of UBC Table 5-3 (plus we could always add the increase for distance from property line but it's unnecessary). Reference attached Section A for graphic interpretation of construction components for the horizontal assemblies. A fire - separation (1 -hour) between the Main Floor (A-2) & Lower Floor (U) was detailed on the F CHRISTOPHER KRABACHER ARCHITECT P.O. Box 2592, Grand Junction, Colorado 81502 (970) 243-3587 (office) (970) 640-8831 (cell) ckouray@yahoo.com approved set of construction documents (Section A, Sheet A4). All openings, penetrations, joints & ducts shall comply with the intent of these separations between occupancies, including smoke detectors & alarms, per IBC907.2 . 3) Ansul System. The "Kitchen" has being revised to become a serving area only, with cold & dry storage, and a few sinks. There is no need for an ansul system with this revised configuration. Attached main Floor Plan illustrates the possible (revised) configuration for the "Kitchen". 4) The Main Bathrooms are designed to be accessible in compliance with ICC A117.1- 2009, as indicated on the approved (for construction) set of plans. 5) -Access to the Main Floor ofthe Pavilion Structure can be provided by an access way from the original Main Cabin (where the barrier -free bedrooms are located). A Site Plan will be generated to graphically interpret this requirement, showing the access system & measures for adequate life, health & safety of the occupants. Attached Site Plan sketch for probable access and configuration. 6) The stairs have been revised to the min./max. 7:11 (See attached Stair Section) 7) The guardrails will comply with IBC 1013 (See attached Stair Section) 8) The Fire Marshal shall be provided a set of revised construction documents for review, approval and inspection. 9) CDH is welcome to inspect and comment at their convenience. 10) Fire suppression system is not necessarily required per IBC If -we can be of any further service, feel free to contact us. CyL.c Christopher Krabacher Licensed Architect in the State of Colorado (#B-2062) Chapter Nine. Metol Roofing System over 154 Roofing Raper 5/8" OSB RooF Sheathing — Ix2 Furring a 24° o/ 242 Rf.Rftrs.a 24"o/c (or II -1/8" TJI IIOs) 12 Cont. Blocking Insulation 1/4' Plywd Soffit C1 Stop 4 Gutter Wood Facia Continuous Blocking R-38 Insulation — 5/6 613O1-1 Leiling Continuous Mid -Span Blocking - r3/4' 1.4iderLaynent LOFT FLOOR 2xIOs (or 9-1/2" TJI IIOs) 2°°1°° xI0 ledger £t. Melia to Log W V2x 8'L69=•30"o/c over 34° chonel 0 14" o/c ° 12' 0 Log Hall System Erode Line MAIN FLOOR 3' Concrete Floor 3/4" IynderLayment 2x12s (or 11-1/6" TJI IIOs) Continuous Rhi Jost. Mch'd to Cont Wall 14/5/8• x 10 Lags 0 36° o/c 5/8' & sumDoard Drywall -"X" over 3/4' "simnel 0 24' o/c 12 Conc. Fdn. Hall V2° 6vaslon Jt. Elastanerw Filler -5' Concrete Floor SECTION A WALL SECTION EXTERIOR HALL SECTION TERN LOFT SCALE°. 1/2L=—P-6" N-rC,