HomeMy WebLinkAbout2.0 Permitmill 91%YY}IN MiJ WIN Hill 11111
Reception#: 753465
02/19/2009 03:30:19 PM Jean giberico
1 of 2 Rao Fee:$0.00 Doc Fae:D, 00 GARFIELD COUNTY CO
ADMINISTRATIVE PERMIT
for
FLOODPLAIN PERMIT — Garden Gulch Road Bridge;
Section 18, Township 6S, Range 96W; Parcel No. 2171-
182-00-008; Owner: Chevron Corporation; Applicant:
Marathon Oil Company.
Parcel ID: 2171-182-00-008
In accordance with and pursuant to Section 6.00 of the Garfield County Zoning Resolution of
1978, as amended, and Resolution No. 2006 - 79 of the Board of County Commissioners of
Garfield County, State of Colorado, the Director of the Building and Planning Department
hereby authorizes, by Administrative Permit, the following activity:
In accordance with the submitted application,
activities in the 100 year floodplain of the
Parachute Creek related to constructing a private
road accessing gas wells and related activities.
The Administrative Permit is issued subject to the conditions set forth in Exhibit A (attached
hereto), and shall be valid only during compliance with such conditions and other applicable
provisions of the Garfield County Zoning Resolution, Subdivision Regulations, Building
Code, and other regulations of the Board of County Commissioners of Garfield County,
Colorado.
BUILDING AND PLANNING DEPARTMENT,
GARFIELD COUNTY, COLORADO
Director
• viii hri��N�����,aw, �+r�a<<,��ti«+.a�a,��ri������� ni ii!
Reception#: 763465
02/19/2009 03:30:19 PM Jean Fllberico
2 of 2 Rao Fee:$0.00 Doc Fe8:0.00 GARFIELD COUNTY CO
EXHIBIT A
FLOODPLAIN PERMIT — Garden Gulch Road Bridge,
Section 18, Township 6S, Range 96W; Parcel No. 2171-
182-00-008; Owner: Chevron Corporation; Applicant:
Marathon Oil Company.
1. All representations made in the application shall be considered conditions of
approval, unless modified by this Exhibit A.
2. No alterations of the floodplain may be made other than the specific
improvements noted in the application.
3. All new construction or substantial improvements shall be designed (or
modified) and adequately anchored to prevent flotation, collapse or lateral
movement of the structure resulting from hydrodynamic and hydrostatic loads,
including the effects of buoyancy.
4. All new construction or substantial improvements shall be constructed with
materials resistant to flood damage.
5. All new construction or substantial improvements shall be constructed by
methods and practices that minimize flood damage.
6. All new construction or substantial improvements shall be constructed with
electrical, heating, ventilation, plumbing, and air conditioning equipment and
other service facilities that are designed and/or located so as to prevent water
from entering or accumulating within the components during conditions of
flooding.
7. All new and replacement water supply systems shall be designed to minimize
or eliminate infiltration of flood waters into the system.
8. New and replacement sanitary sewage systems shall be designed to minimize
or eliminate infiltration of flood waters into the system and discharge from the
systems into flood waters.
9. On-site waste disposal systems shall be located to avoid impairment to them
or contamination from them during flooding.
10. No disturbance of a regulated wetland will be allowed.