HomeMy WebLinkAbout2.0 Permitr
1111 ~1111\~'il1i~V,1,r-t1Ll~,,~f,l~~~~~M1~1 iitii~ l"r1''~'~ 11111
Rece ptjonh: 752960
D7 /24/2DD8 10 :46 :03 AM Jean Alber ico
1 of 2 Rec Fee :$D .OD Doc Fee :D.DO GARF IELD COUNTY CO
ADMINISTRATIVE PERMIT
for
A 5.9-acre site situated on Tractsl03 and 104, in the
NW~ of Section 36, Township 5 South, Range 98 West
of the 61h P.M, 2.5 miles northwest of the end of
County Road 211, part of 4311.69-acre parcel
owned by Chevron USA.
Parcel ID #s: 2137-321-00-008, 2137-320-00-008
In accordance with and pursuant t_o Section 6.00 of the Garfield County Zoning Resolution of
1978 , as amended, and Resolution No. 2006 -79 of the Board of County Commissioners of
Garfield County, State of Colorado, the Director of the Building and Planning Department
hereby authorizes, by Administrative Permit, the following activity :
The placement of construction grading in the
flood-fringe of the designated 100-year floodplain
of Tom Creek, a.first order stream that drains to
the Colorado River, near its confluence with Clear
Creek, for the construction of a pad on which to
build the Central Production Facility Area to serve
the output of several gas wells.
The Administrative Permit is issued subject to the conditions set forth in Exhibit A (attached
hereto), and shall be valid only during compliance with such conditions and other applicable
provisions of the Garfield County Zoning Resolution, Subdivision Regulations, Building
Code, and other regulations of the Board of County Commissioners of Garfield County,
Colorado.
BUILDING AND PLANNING DEPARTMENT,
GARFIELD COUNTY, COLORADO
(
1111 ~11111&. ~l~~~v,~MH ,~r,~r,l~~ll,lrli11I :l~Y I~'\ ~1 Y 11111
Receptiontt: 752960
07/24 /2008 10 :46 :03 AM J e an Alber i co
2 of 2 Rec Fee :$0 .00 Doc Fee :0 .00 GARF IELD COUNTY CO
EXHIBIT A
·FLOODPLAIN PERMIT-Parcels #2137-321-00-008 and
2137-320-00-008 including portions of Tract 103 and 104,
T5s, R98 W of the 61h P.M Colorado, owned by Chevron
USA.
1. All representations made in the application shall be considered conditions of
approval, unless modified by this Exhibit A.
2 . There are no regulated wetland areas associated with this permit.
3. No a lteration s of the floodplain may be made other than the specific
improvements noted in the application and shown on drawing b y Gene
Rasmussen, labeled "Piceance Basin Development Central Production Facility
Pad Post Construction Floodplain Limits" (PBSR-59836AVF-Cl V-PMT-
URS-00000-00002-00) submitted as a July 2 , 2008, addendum to an
application signed and stamped by Sally Cuffin, P .E.
4 . All new construction or substantial improvements shall be designed (or
modified) and adequately anchored to prevent flotation , collapse or lateral
movement of the structure resulting from hydrodynamic and hydrostatic loads,
including the effects of buoyancy.
5. All new construction or substantial improvements shall be constructed with
materials resistant to flood damage.
6. All new construction or substantial improvements shall be constructed by
methods and practices that minimi ze flood damage.
7. All new construction or substantial improvements shall be constructed with
electrical , heating , ventilation, plumbing, and air conditioning equipment and
other service facilities that are designed and/or located so as to prevent water
from entering or accumu lating within the components during conditions of
flooding.
8. Safety plan measures submitted as Piceance Basin Natural Gas Development
Severe Weather/Flood Evacuation Plan submitted as a July 10, 2008,
addendum to the application shall be followed to help ensure safety to
workers.