HomeMy WebLinkAboutConditions of Permit.pdfCONDITIONS OF PERMIT
BLCO-8-14-3339
EnCana/Hunter Ridge Energy
Divide Rd Water Facility, PDC Bldg 200
Parachute, Colorado
1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS.
2) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS.
3) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT.
4) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION, SEE REPORT FOR PSF.
5) PRIOR TO CONSTRUCTION, CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC
REQUIREMENTS PER RESOLUTION No. 2013-14. FIRE DISTRICT FINAL APPROVAL REPORT
IS REQUIRED FOR FINAL/COMPLETION INSPECTION.
6) ELECTRICAL FINAL APPROVAL 15 REQUIRED FOR FINAL/COMPLETION INSPECTION.
7) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.
8) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008.
9) VERIFY CDOH INSIGNIA IS AFFIXED FOR FINAL/COMPLETION INSPECTION.
10) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL.