Loading...
HomeMy WebLinkAbout2.0 BOCC Staff Report 12.03.2007I REQUEST APPLICANT I OWNER LOCATION WATER/SEWER EXISTING ZONING ADJACENT ZONING PARCELNO. ) BOCC12/03/2007 CR Daybreak Realty, LLC Special Use Permit Project Information and Staff Comments Special Use Permit to allow a "Communication Facility" Daybreak Realty, LLC (EnCana -operator) South of the Town of Parachute , CO N/A Ag ricultu ral/Residential/Rural Density (AIR/RD) Open Space, AIR/RD, PUD 240719300162 STAFF RECOMMENDATION Approval Town of Parachu te , CO General Location of Proposed Co!"Tlrnunication Faci lity BOCC12/03/2007 CR I. REQUEST EnCana Oil and Gas USA, on behalf of Daybreak Realty, LLC requests that the Board of County Commissioners (the BOCC) approve a Special Use Permit (SUP) to allow a "Communications Facility'' on a property located approximatly, six (6) miles south west of the Town of Parachute, Colorado. The Applicant is proposing to construct and operate one (1) 60 foot-tall self-supporting communication tower on an existing well pad. The proposed facility will provide a communication link from the EnCana office to the following facilites: • High Mesa Water Plant • High Mesa Compressor Station • Orchard Compressor Station II. SITE INFORMATION The proposed communication tower will be constructed on 85'X85' area within an existing well pad. The facility will be unmanned and will utilize solar power. An electric control building will be constructed at the base of the proposed tower. No other electri.cal supply will be necessary. Ill. REFERRALS Staff referred the application to the following review agencies and/or County Departments: Town of Parachute: No comments received Garfield County Road and Bridge: No comments recieved Garfield County Vegetation Management: Facility located on well pad reclamation security is not recommended. IV. REVIEW STANDARDS Section 5.03 Review Standards Utilities adequate to provide water and sanitation service based on accepted engineering standards and approved by the Board of County Commissioners shall either be in place or shall be constructed in conjunction with the proposed use; Staff Finding Water and sanitation services will not be utilized at the proposed facility. Street improvements adequate to accommodate traffic volume generated by the proposed use and to provide safe, convenient access to the use shall either be in place or shall be constructed in conjunction with the proposed use; Staff Finding The only traffic volume genearted as a result of the proposed facility will be limited to periodic maintenance and repair. Current street improvements are adequate to accommodate the traffic generated by the operation of a communication facility on the subject property. Design of the proposed use is organized to minimize impact on and from adjacent uses of land through installation of screen fences or landscape materials on the periphery of 2 BOCC12/03/2007 CR the lot and by location of intensively utilized areas, access points, lighting and signs in such a manner as to protect established neighborhood character; Staff Finding The proposed facility will be located on an existing well pad approximately six miles south west of the Town of Parachute. Section 5.03.13 [Broadcasting Studio and/or Communication Facilitvl Pursuant to Section 5.03.13 of the Zoning Resolution, a permit for Communication Facilities requires that such facilities be approved by the Federal Communication Commission and the Federal Aviation Administration, where appropriate. In addition the following standards will be used in the review of application for a communication facility: (1) All facilities shall comply with the radio frequency emission requirements of the Federal Communication Commission and any facility in compliance cannot be denied. Response The applicant states that the propose facility will utilize unlicensed frequency ranges. As represented, the proposed facility will not require Federal Communication Commission licensing. (2) The co-location of telecommunication facilities on one site is encouraged and the denial of a landowner/lessor of the co-location of a site shall be based on technical reasons, not on competitive interests. It is the County's policy to minimize the number of communication facilities by the encouragement of co-locating such facilities. Response Staff has recommended a condition of approval requiring the Applicant allow co-location if technically feasible. (3) A freestanding telecommunication facility, including antennas, shall not exceed the maximum structure height in the applicable zone district unless an exception is approved by the Board based on the applicant demonstrating the following: (a) Use of existing land forms, vegetation and structures to aid in screening the facility from view or blending in with the surrounding built natural environment. (b) Design, materials and colors of antennas and their support structures, shall be compatible with the surrounding environment, and monopole support structures shall taper from the base to the tip. (c) It is consistent with existing communication facilities on the same site. Response The height of the proposed tower will be sixty (60) feet. Structural height limits within the AIR/RD Zone District is identified as twenty-five (25) feet. The Applicant is requesting that the Board allow deviation from the identified height requirement. No other communication facilities are currently located on the proposed site. 3 Exhibits (12/03/07) Daybreak Realty, LLC Communication Facility Garfield County Zoning Resolution of 1978, as amended Staff Memorandum Application