Reception#: 712785
12/11/06 4:36PM 8:1872 P:0205 Mildred Alsdorf
1 of 9 Reo Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
ADMINISTRATIVE PERMIT
for
Williams Production RMT
[Parachute to Noble Pipeline]
In accordance with and pursuant to Section 9.07 of the Garfield County Zoning Resolution of
1978, as amended, and Resolution No. 2005 - 53 of the Board of County Commissioners of
Garfield County, State of Colorado, the Director of the Building and Planning Department
hereby authorizes, by Administrative Permit, the following activity:
The construction of a 3.5 mile, 16 -inch low
pressure natural gas pipeline; a 7.3 mile, 12 -inch
high pressure natural gas pipeline; and a 3.5 mile,
4 -inch low pressure water gathering and/or
distribution pipeline within the vicinity of the Town
of Parachute, Colorado.
The Administrative Permit is issued subject to the conditions set forth in ExhibitA (attached
hereto), and shall be valid only during compliance with such conditions and other applicable
provisions of the Garfield County Zoning Resolution, Subdivision Regulations, Building
Code, and other regulations of the Board of County Commissioners of Garfield County,
Colorado.
BUILDING AND PLANNING DEPARTMENT,
GARFIELD COUNTY, COLORADO
Du4Cior
1111115 I+11,14Vi1.PM11114A4 1411:10011(1111:1111N 11 11 1
Reception*: 712785
12/11/06 4:36PM 8:1872 P:0207 Mildred Rlsdorf
3 of 9 Reo Fee:$0.00 Dec Fee:0.00 GARFIELD COUNTY CO
the field. Seed mix containing yellow sweet clover (Melilotus offcinalis) or annual
yellow sweetclover (M. indicus) shall not be used. The amount of seed specified
to be planted in the Plan shall match the quantity of seed used in the fleld. The
security shall be held by Ga►freld County until vegetation has been successfully
reestablished according to the Reclamation Standards in the Garfield County
Weed Management Plan, It is the responsibility of the applicant to contact the
County, upon successful revegetation establishment, to request an inspection for
security release consideration.
10. The Applicant shall provide the County with a digital alignment of the pipeline
once constructed in a format readable to the County.
11. In no case shall an operator engage in activities which impact Federal or State
threatened and endangered species.
12. Air contaminant emissions shall be in compliance with the applicable permit and
control provisions of the Colorado Air Quality Control Program, Title 25,
Resolution 7, C.R.S.
13. All operations shall comply with all applicable Federal and State Public Health
and Environment, Noise, and Air and Water Quality Control standards.
14. Should an abandoned pipeline be removed, it will be subject to the original
revegetation and weed management requirements in the original application.
2
1111 PI HililiN111111Willitrittelik1141.1111111
Rseeption#: 712785
12!11!06 4:36PM B:1872 P:0209 Mildred Plsdorf
5 of 9 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
Special Provisions for Pipeline
1. Starting Date: Within 14 days after issuance of utility permit by Garfield County
Road & Bridge Department.
2. Completion Date: _90 days after commencement, weather permitting. If
project is not completed within the 90 days the contractor will apply to
Garfield County Road & Bridge Department for an extension to the permit.
3. A letter of credit for construction purposes will be submitted to Garfield County
Road & Bridge Department in the amount of $65,000.00 (Sixty Five Thousand
Dollars). The letter of credit will be held for one year after completion of the
Project.
4. Company will furnish on electronic format to Garfield County Road & Bridge
Department an as -built survey upon completion of the project.
5. Contractor will furnish to Garfield County Road & Bridge Department a list of
contact names and numbers of all companies working on the project. Garfield
County Road & Bridge Department will furnish to contractor the same.
6. A traffic control plan will be submitted and approved by Garfield County Road &'
Bridge Department prior to permit being issued.
7. The buried depth of the pipeline shall be 60 -inches to top of pipe within County
Right of Way.
8. Cr. 300 (Parachute Una Road) will be kept open to traffic at all times. Traffic
delays of 10 minuets are acceptable, except for emergency vehicles. Road
crossings will be bored. If bore fails 3 times or boring tool becomes stuck, road
way may be cut with special permission of Garfield County Road & Bridge
Department.
9. Affected areas will be graded and shaped to include road surface and barrow
ditches. This will include replacement of road surface with a 4 -inch asphalt mat if
contaminated or deemed necessary by Garfield County Representative. Areas of
construction will be inspected and approved by Garfield County Representative.
10. Backfilling will be with excavated and imported material at 95% compaction with
moisture. Testing intervals will be determined on site by Geo -Tech hired by
contractor and agreed to by Garfield County representative. Test results will be
11. sent to Garfield County Road & Bridge Department, P. O. Box 426, Rifle, CO
81650 to be reviewed and approved by Garfield County engineering department.
VIII II�'� minv'ifmhliftioRlf+,;lda'Gl iwt III
Reception#: 712785
12/11/06 4:36PM B:1872 P:0211 Mildred Rlsdorf
7 of 9 Reo Fee:$0.00 Deo Fee:0.00 GARFIELD COUNTY CO
Garfield County
To: BOCC
Re: Williams Pipeline Addition Request
Date: November 8, 2006
BOCC:
Road and Bridge Department
0567 County Road 352
Williams Gathering Division of Williams Production has requested permission for an
addition to install three pipelines in a single trench within the County ROW along Cr. 300
(Parachute Una Road). The pipelines will include a 12 -inch high pressure gas, a 16 -inch
low pressure gas and a 4 -inch water line to limit the need for water trucks. There will also
be a mad bore under Cr. 300 on the east end of the pipeline to tum the pipeline to cross
the Colorado River. The length of the pipeline within the County ROW will be 2709 -feet.
The water line will be cased and vented to atmosphere.
A land owner that Williams made an agreement with has decided not to allow this section
of pipeline on his property. For this reason Williams is requesting permission to install
this section of pipelines within the County ROW.
Williams will submit an updated certified traffic control plan to include this section of
pipeline to Garfield County Road & Bridge Department. No trenches will be left open
and certified traffic control will be onsite at all times during working hours. Williams will
repave this section of road with a 4 -inch mat after completion of the pipeline. The
approximate start date for the project is October 2006. The project will be completed
before the frost season. Due to asphalt constraints the paving may have to take place in
2007 with necessary road repairs made in 2006.
Garfield County Road & Bridge Department recommends approval of this request with
adherence to all provisions specified by the issued utility permit and any
recommendations made by the BOCC.
Jake B. Mall Marvin Stephens
Administrative Foreman Road and Bridge Director
Garfield County Road & Bridge Dept. Garfield County Road & Bridge Dept.
t111W5 WI'hIhGI MIMPICIVW,ClaiThn1111
Reception*: 712785
12/11508 4:38PM B:1872 P:0213 Mildred Alsdorf
9 of 9 Roc Fee:$0.00 Doo Fee:0.00 GRRFIELD COUNTY CO
12. Rocks exceeding 10 -inches in diameter shall be removed from site. It is the
contractor's responsibility to locate place to discard rocks.
13. Affected areas outside of road driving surface will be reseeded with a mix
submitted by contractor and approved by Garfield County Vegetation Manager.
Contact Steve Anthony at 970-625-8601 Ext. 105 or 970-379-4456. List plant
material, be specific (scientific and common names required). Planting schedule
(to include timing and methods). A map of the area impacted (where the soil will
be disturbed).
14. A letter of credit for revegatation will be submitted to Garfield County Vegetation
Department in the amount of $11000.00 (Eleven Thousand Dollars). After initial
planting letter of credit will held for a maximum of two years.
15. Contractor will notify Garfield County Road & Bridge Department 48 hours prior
to starting project and of any problems arising during the project. Contact Jake
B. Mall at 970-625-8601 Ext. 104 or 970-618-6194.
16. Garfield County Road & Bridge Department reserves the right to shut the project
down if road damage starts to occur, dust becomes a problem or during inclement
weather that could become a safety issue for the traveling public.
17. Garfield County Road & Bridge Deparhnent representative will do a final
inspection upon completion of the project
18. Vehicles and equipment used by employees constructing the pipeline will be
licensed and registered in the state of Colorado.
19. All vehicles transporting equipment and material used for the project will abide
by Garfield County's oversize/overweight regulations and follow approved haul
routes.
20. All utilities within County right of ways shall be removed at the owners expense
upon request from Garfield County Road & Bridge Department for road
improvements or other construction projects.
21. Utility permit will be issued upon approval of an Administrative review process.