Loading...
HomeMy WebLinkAbout5.0 Permit1111K 11 III Reception#: 712785 12/11/06 4:36PM 8:1872 P:0205 Mildred Alsdorf 1 of 9 Reo Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO ADMINISTRATIVE PERMIT for Williams Production RMT [Parachute to Noble Pipeline] In accordance with and pursuant to Section 9.07 of the Garfield County Zoning Resolution of 1978, as amended, and Resolution No. 2005 - 53 of the Board of County Commissioners of Garfield County, State of Colorado, the Director of the Building and Planning Department hereby authorizes, by Administrative Permit, the following activity: The construction of a 3.5 mile, 16 -inch low pressure natural gas pipeline; a 7.3 mile, 12 -inch high pressure natural gas pipeline; and a 3.5 mile, 4 -inch low pressure water gathering and/or distribution pipeline within the vicinity of the Town of Parachute, Colorado. The Administrative Permit is issued subject to the conditions set forth in ExhibitA (attached hereto), and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Zoning Resolution, Subdivision Regulations, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. BUILDING AND PLANNING DEPARTMENT, GARFIELD COUNTY, COLORADO Du4Cior 1111115 I+11,14Vi1.PM11114A4 1411:10011(1111:1111N 11 11 1 Reception*: 712785 12/11/06 4:36PM 8:1872 P:0207 Mildred Rlsdorf 3 of 9 Reo Fee:$0.00 Dec Fee:0.00 GARFIELD COUNTY CO the field. Seed mix containing yellow sweet clover (Melilotus offcinalis) or annual yellow sweetclover (M. indicus) shall not be used. The amount of seed specified to be planted in the Plan shall match the quantity of seed used in the fleld. The security shall be held by Ga►freld County until vegetation has been successfully reestablished according to the Reclamation Standards in the Garfield County Weed Management Plan, It is the responsibility of the applicant to contact the County, upon successful revegetation establishment, to request an inspection for security release consideration. 10. The Applicant shall provide the County with a digital alignment of the pipeline once constructed in a format readable to the County. 11. In no case shall an operator engage in activities which impact Federal or State threatened and endangered species. 12. Air contaminant emissions shall be in compliance with the applicable permit and control provisions of the Colorado Air Quality Control Program, Title 25, Resolution 7, C.R.S. 13. All operations shall comply with all applicable Federal and State Public Health and Environment, Noise, and Air and Water Quality Control standards. 14. Should an abandoned pipeline be removed, it will be subject to the original revegetation and weed management requirements in the original application. 2 1111 PI HililiN111111Willitrittelik1141.1111111 Rseeption#: 712785 12!11!06 4:36PM B:1872 P:0209 Mildred Plsdorf 5 of 9 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO Special Provisions for Pipeline 1. Starting Date: Within 14 days after issuance of utility permit by Garfield County Road & Bridge Department. 2. Completion Date: _90 days after commencement, weather permitting. If project is not completed within the 90 days the contractor will apply to Garfield County Road & Bridge Department for an extension to the permit. 3. A letter of credit for construction purposes will be submitted to Garfield County Road & Bridge Department in the amount of $65,000.00 (Sixty Five Thousand Dollars). The letter of credit will be held for one year after completion of the Project. 4. Company will furnish on electronic format to Garfield County Road & Bridge Department an as -built survey upon completion of the project. 5. Contractor will furnish to Garfield County Road & Bridge Department a list of contact names and numbers of all companies working on the project. Garfield County Road & Bridge Department will furnish to contractor the same. 6. A traffic control plan will be submitted and approved by Garfield County Road &' Bridge Department prior to permit being issued. 7. The buried depth of the pipeline shall be 60 -inches to top of pipe within County Right of Way. 8. Cr. 300 (Parachute Una Road) will be kept open to traffic at all times. Traffic delays of 10 minuets are acceptable, except for emergency vehicles. Road crossings will be bored. If bore fails 3 times or boring tool becomes stuck, road way may be cut with special permission of Garfield County Road & Bridge Department. 9. Affected areas will be graded and shaped to include road surface and barrow ditches. This will include replacement of road surface with a 4 -inch asphalt mat if contaminated or deemed necessary by Garfield County Representative. Areas of construction will be inspected and approved by Garfield County Representative. 10. Backfilling will be with excavated and imported material at 95% compaction with moisture. Testing intervals will be determined on site by Geo -Tech hired by contractor and agreed to by Garfield County representative. Test results will be 11. sent to Garfield County Road & Bridge Department, P. O. Box 426, Rifle, CO 81650 to be reviewed and approved by Garfield County engineering department. VIII II�'� minv'ifmhliftioRlf+,;lda'Gl iwt III Reception#: 712785 12/11/06 4:36PM B:1872 P:0211 Mildred Rlsdorf 7 of 9 Reo Fee:$0.00 Deo Fee:0.00 GARFIELD COUNTY CO Garfield County To: BOCC Re: Williams Pipeline Addition Request Date: November 8, 2006 BOCC: Road and Bridge Department 0567 County Road 352 Williams Gathering Division of Williams Production has requested permission for an addition to install three pipelines in a single trench within the County ROW along Cr. 300 (Parachute Una Road). The pipelines will include a 12 -inch high pressure gas, a 16 -inch low pressure gas and a 4 -inch water line to limit the need for water trucks. There will also be a mad bore under Cr. 300 on the east end of the pipeline to tum the pipeline to cross the Colorado River. The length of the pipeline within the County ROW will be 2709 -feet. The water line will be cased and vented to atmosphere. A land owner that Williams made an agreement with has decided not to allow this section of pipeline on his property. For this reason Williams is requesting permission to install this section of pipelines within the County ROW. Williams will submit an updated certified traffic control plan to include this section of pipeline to Garfield County Road & Bridge Department. No trenches will be left open and certified traffic control will be onsite at all times during working hours. Williams will repave this section of road with a 4 -inch mat after completion of the pipeline. The approximate start date for the project is October 2006. The project will be completed before the frost season. Due to asphalt constraints the paving may have to take place in 2007 with necessary road repairs made in 2006. Garfield County Road & Bridge Department recommends approval of this request with adherence to all provisions specified by the issued utility permit and any recommendations made by the BOCC. Jake B. Mall Marvin Stephens Administrative Foreman Road and Bridge Director Garfield County Road & Bridge Dept. Garfield County Road & Bridge Dept. t111W5 WI'hIhGI MIMPICIVW,ClaiThn1111 Reception*: 712785 12/11508 4:38PM B:1872 P:0213 Mildred Alsdorf 9 of 9 Roc Fee:$0.00 Doo Fee:0.00 GRRFIELD COUNTY CO 12. Rocks exceeding 10 -inches in diameter shall be removed from site. It is the contractor's responsibility to locate place to discard rocks. 13. Affected areas outside of road driving surface will be reseeded with a mix submitted by contractor and approved by Garfield County Vegetation Manager. Contact Steve Anthony at 970-625-8601 Ext. 105 or 970-379-4456. List plant material, be specific (scientific and common names required). Planting schedule (to include timing and methods). A map of the area impacted (where the soil will be disturbed). 14. A letter of credit for revegatation will be submitted to Garfield County Vegetation Department in the amount of $11000.00 (Eleven Thousand Dollars). After initial planting letter of credit will held for a maximum of two years. 15. Contractor will notify Garfield County Road & Bridge Department 48 hours prior to starting project and of any problems arising during the project. Contact Jake B. Mall at 970-625-8601 Ext. 104 or 970-618-6194. 16. Garfield County Road & Bridge Department reserves the right to shut the project down if road damage starts to occur, dust becomes a problem or during inclement weather that could become a safety issue for the traveling public. 17. Garfield County Road & Bridge Deparhnent representative will do a final inspection upon completion of the project 18. Vehicles and equipment used by employees constructing the pipeline will be licensed and registered in the state of Colorado. 19. All vehicles transporting equipment and material used for the project will abide by Garfield County's oversize/overweight regulations and follow approved haul routes. 20. All utilities within County right of ways shall be removed at the owners expense upon request from Garfield County Road & Bridge Department for road improvements or other construction projects. 21. Utility permit will be issued upon approval of an Administrative review process.