HomeMy WebLinkAbout2.0 Director's DecisionFebruary 23, 2009 PhD Vaughan, President Construction Management, Inc. 1038 County Road 323 Rifle, CO 81650 BUILDING & PLANNING DEPARTMENT RE: Third Administrative Amendment - Pipeline Development Plan — Addition of Temporary Concrete Batch Enterprise Gas Processing, LLC Natural Gas Gathering Pipeline for Marathon Well Fields Dear PhD, Upon review, we have found that the February 19, 2009 application for a Pipeline Development Plan Amendment does not represent a substantial change from the original permit. Attached to this letter is the approved and recorded Third Amendment to the Administrative Permit. Project Sumary. The original Administrative Permit allowed the construction of a 3.7 mile long 20— inch pipeline, a 5.5 mile long of 16 -inch pipeline, and the Jackrabbit Compressor Station. In the first amendment to the permit, Enterprises Gas Processing LCC obtained the County's permission to install two additional pipelines along side of the original pipelines. The second amendment approved a change in construction date restrictions related to bird nesting. This third amendment allows the placement of a temporary concrete batch plant on the site to be used during the construction of the compressor station. The concrete batch plant shall not increase the area of land disturbed by the compressor station. The concrete produced by the batch plant shall only be used on-site and the batch plant shall be removed when the compressor station construction is complete. Upon review of the submitted documents against the required standards and criteria in Section 9.07.06, Staff has made a determination of Approval with Conditions for the Third Amended Administrative Permit. Do not hesitate to contact this office if you have any questions. Very truly yours, Fred A. Jarman, AICl' Director, Building & Planning Department 970.945.8212 108 Eighth Street, Suite 401 • Glenwood Springs, CO 81601 (970) 945-8212 • (970) 285-7972 • Fax: (970) 384-3470