December 19, 2008
CORDILLERAN
Garfield County
Building & Planning Department
Attention: Fred Jarman
108 8th Street, Suite 401
Glenwood Springs, CO 81601
RECEIVED
DEC 2 2 2008
GARFIELD COUNTY
BUILDING & PLANNING
SUBJECT: Proposed Amendment to Approved Pipeline Development Plan (PDP 12908
Marathon Oil Company Fresh & Produced Water Pipelines
Dear Fred:
As a follow up to our discussion yesterday, this letter provides details of a proposed amendment
to the subject Pipeline Development Plan (PDP). Marathon Oil Company (MOC) is proposing to
revise approximately 1,000 feet of the right-of-way (ROVV) previously approved by Garfield
County as indicated on the plan and profile included as Attachment A to this letter. This
revision is necessary to relocate this portion of the ROW to an area that is less challenging
topographically and allows for additional separation between the disturbed area and Little
Creek. Potential impacts from this relocation are discussed below.
Surface Owner Approval
As indicated in the original application for this PDP, the surface in this location is jointly owned
by MOC and Berry Petroleum Company. Attachment B to this letter provides approval from
Berry Petroleum Company for amending the approved PDP and relocating this portion of the
ROW.
Stream Crossings
MOC has submitted permit applications to the U.S. Army Corps of Engineers (USACOE) under
nationwide permits 12 and 33 for the two crossings of Little Creek and will construct those
crossings in accordance with the USACOE's permit requirements.
Wildlife and Sensitive Plants
The wildlife and sensitive plant surveys conducted by WestWater Engineering that are
documented in the application for the subject PDP were performed in an area extending 0.25
mile from the center line of the originally -proposed ROW. The proposed relocation is well within
this survey area, so the conclusions of the WestWater report are applicable to the relocated
ROW. No sensitive plants or habitat for such plants were identified in the area of the proposed
relocation. This portion of MOC's pipeline project is in the vicinity of the Bear Run sage grouse
826 21% Road TEL 970.263.7800
Grand Junction, CO 81505
FAX 970.263.7456 www.oaconsulting.com
Fred Jarman
December 19, 2008
Page 2
lek, however, as detailed in MOC's original submittal, the construction schedule for this project
was specifically designed so that construction near the lek will be completed this winter to avoid
any impact to spring grouse lekking.
Cultural Sites
The cultural survey conducted by Grand River Institute (GRI) that is documented in the
application for the subject PDP stated that no cultural sites are identified within 1 mile of the
proposed pipeline ROW. Therefore, the results of the GRI survey are applicable to the
proposed relocation and no effect is expected from the proposed relocation.
We would appreciate your prompt response to this request so that construction of these
pipelines can proceed expeditiously. If you have any questions or require additional
information, please contact me at 970-263-7800.
Sincerely,
oug I-nnison
ea Leader
Cc: Curtis Ryland, Marathon Oil Company
Project File 008-2111
Attachments — As Stated
67450 0148.1
68+00 8160.6
68+50 81705
6.00 81654
6.50 8187.0
70+00 81026
7.50 81930
71.6 61024
71. 81628
72. 8174.6
72+50 81723
73. 8170.7
73+50 81721
74. 81738
74450 elen4
75. 81058
75+56 8186.3
76. 8103.1
76+50 81702
77+00 8175.7
77+56 8174.6
70. 8173.5
7.50 8174.3
7.00 8175.6
7.5011176.7
BO. e177.7
30+50 BIAS
01.63 11170.6
82.6 6170.0
.60 01782
013•00 0177.6
a+so 0175.7
84. 0173.3
.50 8165.0
85.03 6153.9
05+50 6.1
86. 0124.3
07.0 8060.9
87+50 0071.6
0036.9
69. 6610.7
69+50 2000.7
96.0 ns1.7
.50 70088
91+80 7.60
91+50 7024.4
92.0 7500.3
92+50 7012.7
93+00 7016.1
.50 7020.8
94. 7032.1
.50 70203
95. 70100
95+50 7010.8
96. 7018.5
96+50 701.
97. 76151
97+50 701.
93. 7011.7
1.50 A10.4
90.0 703.
9.50 7607.1
106.0 70056
1.50 706.
WI. 7010.3
161+50 7012.4
100. 70121
102+50 7010.4
103. 73057
103+50 7001.1
104. 71196.9
105+00 7579.7
105.50 76696
IC6+53 7160.0
166+50 7642.6
137+00 7837.1
7026.3
ID13,00 7036.6
.+43 76486
1.00 71.1
1.50 7670.7
110. 7661.4
11.50 7003.4
111. A13.0
111.6.0 7619.0
111.0 7337.3
112+52 7235.7
114+06 70..6
114+50 70725
11.5+80 76606
115+60 6006.4
116+00 6022.1
116+50 0039.1
117+03 80368
110+60 61031
119. 6117.7
119+30 01306
120.0 0143.7
12.60 6136.0
161.0 6108.1
121+50 61786
122. 8108.6
123. 031,
125+50 0320.6
124. 03302
124 50 6230.0
les•se 8361.6
126.0 6167.0
SD 6263.3
107+00 63826
127+50 8275.5
120+00 62E0.7
1.00 6307.1
12.50 0366.3
130.0 13300.7
30+50 8310.3
161+50 6376.0
132. 8388.9
MM. L1K-
AA Marathon
MARATHON Oil Company
December 10, 2008
Berry Petroleum Company
1999 Broadway, Suite 3700
Denver, CO 80202
Attn: Mary Ann Adams
Peggy A. Gilbert, C.P.L.
Senior Land Professional
U.S. Land
U.S. Production
P. O. Box 3487
Houston, Texas 77253-348
5555 San Felipe
Houston, TX 77056-2725
Telephone 713/296-3333
Fax: 713/499-6769
Email: pgilbertaMarathonOil.com
Re: Pipeline Development Plan Permit for Garfield County, Colorado
Gentlemen:
By letters dated September 18, 2008 and November 10, 2008, Marathon Oil Company
("Marathon") received permission from Berry Petroleum Company ("Berry") to obtain a Garfield
County Pipeline Development Plan Permit for pipelines, and to construct said pipelines, which
may be comprised of fresh water, produced water and/or gas lines and appurtenant facilities that
are located on surface acreage that is jointly owned by Berry and Marathon in Garfield County,
Colorado. Garfield County has subsequently approved Marathon's Pipeline Development Plan.
Due to terrain issues, Marathon has found it necessary to re-route approximately 1000 feet of the
pipeline in the S/2S/2 of Section 29, Township 5 South, Range 96 West as reflected on
Attachment 2, attached hereto and made a part hereof.
This letter shall amend the Attachment 1 to the previous permission letters, but only as to this
portion of the pipeline route. Marathon respectfully requests permission from Berry for approval
of this re-route as identified on the attached Attachment 2 and to amend the approved Pipeline
Development Plan permit from Garfield County. Please indicate this approval by signing in the
space provided below.
Sincerely,
John C. Albert
Land Manager New Ventures
pag
PERMISSION IS HEREBY GRANTED TO MARATHON OIL COMPANY TO AMEND THE
APPROVED PIPELINE DEVELOPMENT PLAN PERMIT FROM GARFIELD COUNTY
AND TO CONSTRUCT PIPELINES ACROSS SURFACE LANDS THAT ARE LOCATED
ABOVE BERRY PETROLEUM COMPANY'S LEASEHOLD ACREAGE AS IDENTIFIED
ON THE ATTACHMENT 2, ATTACHED HERETO.
BERRY PETROL COMP
By:
Name & Title:
AStea N1AArAz -,t
P.O. BOX 820
amPh^f
WILLIAM H. SMITH & ASSOCIATES P.C.
SURVEYING CONSULTANTS
T 5 S R 96 W
SECTION 29
LITTLE CREEK RE—ROUTE
GREEN RIVER, WYOMING 82935
ti
H8
h3
P
8 0
22
t;lW
AlAS N889705"W2637.
REG KEST 40.00 CH.
MEAS N 8827'I6" W 26323
88 ` jP 39.p3
MEAS N 8825'44" W 2645.9
REG N 8936 W 3.9,„9.3 CH,�
J t /
550 EAST 2ND NORTH
PH. 307-875-3638
FAX. 307-875-3640
i {1
f o
1 I I f � `'� } r /� �-y ` fesj::-_, ..) j r
.,, s,,, ,- .)
Lt ((i fes. -.._/ '/ ' , .„.,- . 7.- r �l ..,,,.„/
�J
4
`�\ V J ) •
•
z8
c5
f\`
`Ji
r�J,`_ �1
If
int _
Ml AS 1t8H29`43�yY 1
REG N 89,r W 40.01 CH.
JOB NO. 26099
12/02/08 WHD
LITTLE CREEK RE-ROVTE.dwg
T7 1
N 88773
REC. N 8937' W 40.01 CH.
•
0
LEGEND
FOUND GLO SURVEY
MARKER
MONUMENT NOT FOUND
OR SEARCHED
EXISTING ROAD
ORIGINAL PROPOSED MARATHON PIPELINE
— — — NEW PROPOSED MARATHON PIPEUNE
EXISTING BERRY PIPEUNE
EXISTING MAIN CORRIDOR
PROPOSED NEW RE-ROUTE 50' COORIDOR