HomeMy WebLinkAbout5.0 Permit1111 illi!ikhi4llnil4 'PITARN 11111
Reception4: 727466
07/06/2007 03:03:24 PM B: 1947 P: 0547 Jean Alberico
1 of 4 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
ADMINISTRATIVE PERMIT
for
Bargath, Inc.
[Cottonwood Compressor Station to Webster Hill
24 -inch Natural Gas Pipeline]
In accordance with and pursuant to Section 9.07 of the Garfield County Zoning Resolution of
1978, as amended, and Resolution No. 2005 - 53 of the Board of County Commissioners of
Garfield County, State of Colorado, the Director of the Building and Planning Department
hereby authorizes, by Administrative Permit, the following activity:
The construction of 8.3 miles of a 24 -inch natural
gas gathering pipeline, 2.0 miles of 12 -inch
natural gas gathering pipeline and two
compressor stations between Parachute and
Rulison to be constructed by Bargath, Inc to
gather natural gas from Williams Production
RMT wells in the area
The Administrative Permit is issued subject to the conditions set forth in Exhibit A (attached
hereto), and shall be valid only during compliance with such conditions and other applicable
provisions of the Garfield County Zoning Resolution, Subdivision Regulations, Building
Code, and other regulations of the Board of County Commissioners of Garfield County,
Colorado.
BUILDING AND PLANNING DEPARTMENT,
GARFIELD COUNTY, COLORADO
Director, Fred A. Jarn Ji, AICP
Atvi. /1' LftC.c.C4;,2i)
Ga e1d County Clerk & Recorder
11141.141 411 P00 4 'filrIrNINI.Ilil' 1111
Reception#: 727466
.07106/2007 03:03:24 PM B: 1947 P: 0548 Jean Plberioo
2 of 4 Rio Fee:$0.00 Doc Fee:0.00 GPRFIELD COUNTY CO
Exhibit A
1. Any equipment used in construction or operation of a pipeline must comply
with the Colorado Oil and Gas Conservation Commission Rules and
Regulations, Section 802, Noise Abatement. Additionally, all power sources
used in pipeline operations shall have electric motors or muffled intemal
combustion engines.
2. Pipeline operations shall be located in a manner to minimize their visual
impact and disturbance of the land surface. Facilities shall be painted in a
uniform, non -contrasting, non -reflective color, to blend with the adjacent
landscape. Right-of-way shall be located in existing disturbed areas unless
safety or visual concems or other adverse surface impacts clearly dictate
otherwise.
3. All access and oversize or overweight vehicle permits shall be obtained from
the County Road & Bridge Department prior to beginning operation. Any new
roads or intensified driveway accesses created as a result of the pipeline
construction, intended to be permanent for maintenance and repair
operations shall be placed behind a locked gate or other barriers preventing
use by recreational vehicles. Any gates or barriers need to be consistent with
the surface owner's preferences.
4. Revegetation along the pipeline corridor and along the County Road for the
crossings shall be required to be approved by Garfield County Vegetation
Manager and the ROW restoration will be approved by Garfield County Road
& Bridge Department representative.
5. All vehicles working within Garfield County Right of Ways will be licensed
and registered in the State of Colorado. All vehicles hauling equipment and
materials for the pipeline construction will abide by Garfield County Road &
Bridge Departments oversize/overweight regulations. All vehicles requiring
an oversize/overweight permit will send a letter showing proof that they can
operate under a known bond holder on file with Garfield County Road &
Bridge Department before a permit will be issued.
6. The Applicant shall provide the County with a revegetation security for fee
lands in the amount of $272, 500.00 for 109 acres disturbed. Additionally, the
Applicant shall submit the original tags from each seed bag. The seed mix in
the Plan shall match the seed mix used in the field. Seed mix containing
yellow sweet clover (Melilotus offcinalis) or annual yellow sweetclover (M.
indicus) shall not be used. The amount of seed specified to be planted in the
Plan shall match the quantity of seed used in the field. The security shall be
held by Garfield County until vegetation has been successfully reestablished
according to the Reclamation Standards in the Garfield County Weed
1111 IAFl!KlaIIiiL!,11Vi MHt.lriii hCICCIIN 11111
Reception#: 727466
07/06/2007'03:03:24 PM B: 1947 P: 0549 Jean Rlberico
3 of 4 Rea Fee:$0.00 Doc Fee:0.00 GRRFIELD COUNTY CO
Management Plan. It is the responsibility of the applicant to contact the
County, upon successful revegetation establishment, to request an
inspection for security release consideration.
7. The Applicant shall provide the County with a digital alignment of the pipeline
once constructed in a format readable to the County Geographic Information
System (GIS) analyst.
8. In no case shall an operator engage in activities which impact Federal or
State threatened and endangered species.
9. Air contaminant emissions shall be in compliance with the applicable permit
and control provisions of the Colorado Air Quality Control Program, Title 25,
Resolution 7, C.R.S.
10. Prior to the issuance of a permit, the Applicant shall satisfy the following
comments from the County Oil & Gas Department:
• 15 — Emergency Response Plan — Sec. II 2.a.4
o Several contacts were not included in the Regulators- Notification
description. Add the following contacts:
• Emergency Control Center — 911
• Colorado Oil & Gas Conservation Commission — Jaime Adkins (970) 285-9000
• Garfield Cowin- Assist County Manager — Jesse Smith !9 0i 309-5440
• Garfield Connry Public Health - Jim Rada — (970) 6255200 ext. 8113
• Garfield Comm- Oil & Gas Department — Jude- Jordan — (970) 625-0973 ext. 2006
• 15 — Emergency Response Plan — Sec. II 213.1
> The emergency plan states that WPC personnel should be contacted in the
event of a tire. The Oil & Gas department would advise that the Emergency_
Control Center (Fire Department & Sheriff Department) should he
contacted immediately. A delay in notify the Emergency Control Center may
result in time lost and increased damage.
11. All operations shall comply with all applicable Federal and State Public
Health and Environment, Noise, and Air and Water Quality Control
standards.
12. Any proposed waste disposal or treatment facilities shall comply with all
requirements of the County Individual Sewage Disposal System Regulations.
13. Should an abandoned pipeline be removed, it will be subject to the original
revegetation and weed management requirements in the original application.
1111Rlika 11111
Receptiont$: 727466
07/06/007 03:03:24 PM B: 1947 P: 0550 Jean Alberico
4 of 4 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
14. There will be no entrances to any County roads for the project and the only
impact to the County road system will be during the construction of the
pipeline project.
15. Portable toilets to be used on site at the two compressor stations shall not be
visible from any public right-of-way.