HomeMy WebLinkAboutPre-App ConferencePRE-APPLICATION CONFERENCE SUMMARY PLANNER: D. Dunbar DATE: 1/27/2009 PROJECT: High Mesa RV Park OWNER: High Mesa Partners: Bob Graham, Eugene Speakman REPRESENTATIVE: Jerry Rusch / Pam Holmes of Rocky Mtn Steel Structures for High Mesa Partners PRACTICAL LOCATION: unnumbered location 2407-193-00-189 TYPE OF APPLICATION: Major Impact Review I. GENERAL PROJECT DESCRIPTION This property is located at an unnumbered location on CR 300, Parachute. It is not within the Town of Parachute’s sphere of influence. Adjacent parcels are zoned ‘Rural’ and used for residential and agricultural uses. There is BLM land interspersed in the area, zoned Open Space. The use is proposed on a 36+/- parcel that has been created by BLA. This project will be under the conditions for CAMPRGROUND/RV PARK that requires a Major Impact Review Application (MIRA) in the rural zone district, and LIRA in commercial, industrial and public lands, prohibited in residential districts. (p 3-34, table 3-501) The project was originally submitted as an GARFIELD COUNTY Building & Planning Department 108 8th Street, Suite 201 Glenwood Springs, Colorado 81601 Telephone: 970.945.8212 Facsimile: 970.384.3470 www.garfield-county.com SUP under the Zoning Resolution of 1978, as amended, but issue prevented it from becoming technically complete under that code. Discussions included requirements for: 1. access road: must have engineering information to insure the road will meet Garfield Cty standards for a ‘Secondary Access Rd’ as per the trip generation. ROW is 60’. May have some variance to grade. Must have second (emergency) access as the length exceed Cty requirement for public connection. Recommended planning for future connectivity for adjacent acreage. 2. Emergency access Must be able to accommodate GVFPD equipment Should be at approved location as per R & B Discussed access thru Monument Ridge (req but denied by Noel Richardson) Recommended planning for future connectivity 3. Campground layout ADA/ general accessibility Internal roadways- 1 way or two way –different widths Fair Housing Act- location to accommodate families Emergency fire hookups 4. Wastewater facility Access road Utility connections Easement language 5. Water facility Access road Utility connections Easement language Water rights 6. Fire suppression ponds Location Maintenance access GVFPD requirements Water rights Easement language 7. Landscape plan 8. Wildlife survey requirements II. REGULATORY PROVISIONS APPLICANT IS REQUIRED TO ADDRESS (DEVELOPMENT CODE / COMPREHENSIVE PLAN, STATE STATUTES, ETC.) Garfield County Unified Land Use Code III. PROCESS In summary, the process will be the following: Steps Request Action Hearing Body 1 Completeness Review Approval/Denial 2 Major Impact Review Recommendation Planning Commission 3 Major Impact Review Approval/Denial Board of County Commissioners IV. APPLICATION REVIEW a. Review by: Staff for completeness recommendation and referral agencies for additional technical review b. Public Hearing: _x__ Planning Commission _ x_ Board of County Commissioners ___ Board of Adjustment c. Referral Agencies: (Division of Water Resources, Colorado Department of Transportation, etc.) GarCo Road and Bridge Division of Wildlife GarCo Attorney GarCo Vegetation Management GarCo Public Health Dept. GVFPD Fire Protection District Sheriff’s Office V. APPLICATION REVIEW FEES a. Planning Review Fees: $__525_________ b. Referral Agency Fees: $___________ c. Total Deposit: $__525_________ (additional hours are billed at $_40.50____ /hour) General Application Processing Planner reviews case for completeness and sends to referral agencies for comments. Case planner contacts applicant and sets up a site visit. Staff reviews application to determine if it meets standards of review. Case planner makes a recommendation of approval, approval with conditions, or denial to the appropriate hearing body. Disclaimer The foregoing summary is advisory in nature only and is not binding on the County. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. This summary does not create a legal or vested right. Pre-application Summary Prepared by: Dusty Dunbar, AICP Date