Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutWBAPP-~1
High Mesa RV Park
Garfield County, Colorado
ENGINEER’S REPORT
Revised July 01, 2009
Prepared for:
Bob Graham
Ridge Partners, LLC
1860 Lousetown Road
Reno, NV 89521
Engineer:
Nathan Bell, P.E.
Bell Consulting LLC
P.O. Box 8
Rifle, CO 81650
970/625- 9313
APPENDIX A
Drainage Report
High Mesa RV Park
Garfield County, Colorado
DRAINAGE REPORTS
Including:
— ADDENDUMS #1 & #2—
June 30, 2009
Prepared for:
Bob Graham
Ridge Partners, LLC
1860 Lousetown Road
Reno, NV 89521
Engineer:
Christopher Furman, P.E.
Bell Consulting LLC
P.O. Box 8
Rifle, CO 81650
970/625- 9313
High Mesa RV Park
Garfield County, Colorado
DRAINAGE REPORT
July 15, 2008
Prepared for:
Bob Graham
Ridge Partners, LLC
1860 Lousetown Road
Reno, NV 89521
Engineer:
Christopher Furman, P.E.
Bell Consulting LLC
P.O. Box 8
Rifle, CO 81650
970/625- 9313
High Mesa RV Park, Drainage Report - 1 -
June 20, 2008
Contents
introduction
DESCRIPTION
BASINS
METHODOLOGY
Off site impacts
Historic on site flows
Developed on site flows
conclusions
APPENDIX A
NRCS Soils Information
APPENDIX B
PRECIPITATION DATA
APPENDIX C
Pre-developed Off Site and On Site Hydrology Calculations
APPENDIX D
Post-developed Hydrology Calculations
APPENDIX E
Structure Capacity Calculations
High Mesa RV Park, Drainage Report - 2 -
June 20, 2008
June 9, 2008
Bob Graham
Ridge Partners, LLC
1860 Lousetown Road
Reno, NV 89521
RE: Drainage Report – High Mesa RV Park, Near Battlement Mesa, CO
Mr. Graham,
Bell Consulting LLC. has prepared the following Drainage Report for the High Mesa RV Park
located within Garfield County, near the Communities of Battlement Mesa and Parachute,
Colorado. The purpose of the study is to ascertain the offsite drainage impacts to this site and
how development of the property will impact storm runoff from the site. The development of
the property will include storm drainage infrastructure to carry off site flows through the site
as well as mitigate and carry on site runoff within the site.
INTRODUCTION
The High Mesa RV Park is located west of the Community of Battlement Mesa below the
geologic feature for which it is named. The property is bounded on the north by a natural
drainage and County Road 300 (aka. Stone Quarry Road), on the south by BLM lands (on
which natural gas drilling/production is in progress), and on the east and west by undeveloped
private land. The developed portion of the RV Park is approximately 16 acres, not including
land to be used for water and wastewater treatment plants, within larger parcels of land.
Regulations require the developer of a parcel to provide mitigation for rain storm events so
that the increase in impervious, or less pervious, area due to the development does not harm
any downstream property. This is accomplished by providing detention or some type of
mitigation to decrease the rate of runoff down to historic flow rates. The intent of this report is
to provide calculations of the storm events and a description of the methods utilized to
mitigate the increased rate of runoff.
DESCRIPTION
The RV Park is located on the north facing slope below High Mesa. The grades of the
existing surface generally range from about 12% to 20%. The site vegetation is
predominantly sage brush and similar plants with Piñon -Juniper forested areas with grassy
understory and good coverage. Two electric utility easements traverse the site. One runs
north-south through about the middle of the Park, the other runs east-west at the northern edge
of the Park.
Access to the site is via an improved gravel road constructed and used by natural gas
development adjacent to the site. On site roads will consist of one-way gravel roads with side
ditches to facilitate drainage. A 20-foot wide loop road traverses the site beginning and
ending at the previously mentioned improved gravel road. Roughly dividing the loop road is
a 20-foot wide gravel secondary road. RV sites sized approximately 20-feet by 50-feet will
High Mesa RV Park, Drainage Report - 3 -
June 20, 2008
angle from the one-way access roads in a manner to facilitate backing in of RV’s, as the
electric easements and topography allow. The RV sites are to be gravel surfaced.
Domestic water will be supplied by a water treatment plant on the property and constructed
exclusively for the RV Park. Domestic sewage will likewise be treated by a wastewater
treatment plant located on the property in the drainage to the north.
BASINS
The designation of basin boundaries is shown on the map provided. The pre-developed area
was divided into five basins utilizing USGS topographic quadrangle maps to delineate the
basin boundaries and flow patterns. Four of the five pre-developed basins were created for
ease in the analysis and comparison between pre-developed and post-developed flows and
could have been combined into two basins. The onsite area was divided into ten basins for
evaluation of post development flow conditions.
METHODOLOGY
The peak runoff flows for the analysis were determined with the HydroCAD computer
program using the methodology given in the Soil Conservation Service’s “Technical Release
No. 20, Urban Hydrology.” Design criteria established by Garfield County require that peak
runoff flows be analyzed assuming a 100-year frequency storm event. The 100-year, 24-hour
precipitation event was estimated to be 2.63 inches. The 2-year, 24-hour precipitation event
was estimated at 1.16-inches. These data were collected from the online National Weather
Service NOAA Atlas 2 interactive program for the 2-year and 100-year data for the subject
site, see appendix.
The NRCS/SCS soils mapping lists the soils in the area primarily in the Hydrologic Group B
with areas of Group D soils within the development and the off-site basins. The type of
ground cover as well as density also affects the runoff volume from a site. The off-site areas
consist primarily of a mix if sagebrush and related vegetation with Piñon -Juniper forest of
good coverage.
The proposed development is a RV campground. The curve numbers used have been selected
from the standard curve number table, included in the HydroCAD program. The actual values
used are included in the appendices in the HydroCAD output. Calculations provided herein
and the design of the infrastructure is based upon the 100-year storm event. The design of the
proposed storm drainage piping has the capacity for 100-year event flows.
The site was analyzed for the pre-developed, or historic, and post-developed conditions to
determine the potential impacts to the area with respect to increased rates of runoff flows.
OFF SITE IMPACTS
The five pre-developed basins contribute run-off to the subject property. Three of the basins
are off-site and contribute flows from the south. The majority of the subject area gently
slopes to the north northwest with no signs of recent flooding.
Flows from the pre-developed off-site basins will be mostly intercepted by the improved
gravel road and directed via road side ditch to an existing 48-inch Corrugated Metal Pipe
High Mesa RV Park, Drainage Report - 4 -
June 20, 2008
(CMP) culvert under the road then within natural existing gullies through the western most
part of the subject parcel to the drainage which roughly runs along County Road 300. The
flows ultimately contribute to the Colorado River which is about two-thirds of a mile to the
northwest.
Following is a table indicating peak flows from the pre-developed and offsite basins.
Pre-developed Runoff
BASIN AREA
(acres)
CN Peak Runoff (cfs)
100 year
Off-site 1 82.07 65 12.33
Off-site 2 31.32 70 17.46
Off-site 3 4.94 77 5.82
4 27.73 56 0.77
5 11.75 54 0.16
The offsite flows will be directed as follows: Basin 1 flows will be diverted by the existing
improved gravel road via the road side ditch to an existing 48-inch CMP culvert. The culvert
discharges to an existing gully which will remain. A proposed road will be constructed
downstream, also with a 48-inch culvert being placed. The flows will then continue in the
natural gully, eventually flowing to the Colorado River. Basin 2 flows will have negligible
impact to the site and will continue to flow via natural gully to the east of the RV Park
contributing to the gully north of the project upstream of the proposed wastewater treatment
facility. Basin 3 will also be diverted by the existing improved gravel road via the road side
ditch to an existing 18-inch CMP culvert. The culvert discharges to an existing gully which
currently runs through the proposed RV Park site. This gully will be impacted by the
development and will be reconstructed as swales. Where the proposed swales cross proposed
roads, culverts will be constructed. Basins 4 and 5 are considered on-site basins and are
addressed in the next section of this report.
HISTORIC ON SITE FLOWS
For calculation purposes, the site has been split into two basins. Basin 4 currently covers
most of the proposed RV Park site. This area will be developed and post-development
drainage will be diverted to proposed swales, culverts and detention ponds. Basin 5 also
contains part of the area proposed for the RV Park. Approximately one-fourth of the basin
will be developed with the remaining portion lying downstream of the development and will
be undeveloped. Post-developed flows from basin 5 will be diverted to proposed swales,
culverts and a detention pond.
The existing condition on-site flows are provided in the table below.
High Mesa RV Park, Drainage Report - 5 -
June 20, 2008
Historic On-site Runoff
BASIN AREA
(acres)
CN Peak Runoff (cfs)
100 year
4 27.73 56 0.77
5 11.75 54 0.16
DEVELOPED ON SITE FLOWS
Development of the site will include site and road improvements as well as storm drainage
infrastructure capable of carrying the developed flows from all areas of the development. Any
proposed new development will increase the amount of impervious area and consequently
cause an increase in peak runoff conditions from the site ultimately to the Colorado River.
The proposed development will add two new roads to the site as well as RV sites and several
buildings to service the RV Park.
Onsite runoff is proposed to enter three detention ponds. One pond to the west of the Park
will detain flows from post-developed basins I and J as well as pre-developed off-site basin 1
and a portion of pre-developed basin 5. The middle, or North, pond will detain flows from
post-developed basins E, F, G, and H, as well as pre-developed off-site basin 3 and a portion
of pre-developed basin 4. The east pond will detain flows from post-developed basins A, B,
C, and D.
The detention areas have been sized to accommodate the 100-year storm events while
decreasing the peak runoff rate so as to not exceed pre-developed rates. The detention ponds
are proposed small non-jurisdictional dams in existing natural gullies. Low level outlets with
orifices of 15”, 18” and 4” are proposed for the west, north and east ponds respectively. High
Level emergency spillway outlets are proposed for the event of a plugged condition.
The following table provides flow rates for the 100-year storm event after development.
High Mesa RV Park, Drainage Report - 6 -
June 20, 2008
BASIN AREA
(acres)
CN Peak Runoff (cfs)
100 year
A 3.17 69 2.86
B 2.14 81 4.62
C 0.98 85 2.60
D 0.59 82 1.38
E 1.73 73 2.30
F 1.72 79 3.42
G 2.24 69 2.10
H 0.92 83 2.28
I 1.30 78 2.39
J 0.76 85 2.08
Total: 15.55 26.0
Cumulative flows to the onsite detention ponds are shown in the following table.
Detention Pond Summary
POND CONTRIBUTING
BASINS
PRE-
DEVELOPED
RUNOFF (cfs)
POST-
DEVELOPED
RUNOFF IN (cfs)
POST-
DEVELOPED
RUNOFF OUT (cfs)
West 1, 5, I, J 12.40 (1,5 Pre) 12.79 10.61
North 3, 4, E, F, G, H 5.99 (3,4 Pre)
10.99 9.79
East A, B, C, D 11.14 0.70
North-
west
control
point
All 13.97 (NW Pre) 13.80 (NW control
Point)
As can be seen in the Detention Pond Summary Table, the post-developed flow rates at the
northwest control point are lower than the pre-developed flow rates. This is the desired result;
the project is not increasing run-off post development. We would note that, within the table,
post-developed out flows do not add up to the peak flow at the northwest control point, this is
due to attenuation in the swales and ponds. The peak run-off rate times are significantly
different for the various ponds resulting in peak flow rates reaching the outlet point for the
High Mesa RV Park, Drainage Report - 7 -
June 20, 2008
RV Park at different times. The computer output from HydroCAD is included in the
appendix.
CONCLUSIONS
The storm drainage analysis provides calculations indicating that the drainage approach
proposed for the High Mesa RV Park is feasible, sound and meets the County’s design
guidelines. Off site flows from pre-developed basin 2 are being diverted to the east of the
project and therefore will not affect the detention area for the onsite flows. The detention
ponds are detaining all post-developed flows so that flow rates leaving the project site are at
the same level as pre-developed flow rates at the same location.
If you have any questions, please do not hesitate to call 970-625-9313.
Sincerely,
Chris Furman, P.E.
Encl: Figures, Appendices
L:\BC-jobfiles\103-RV Park\Hydrology - Drainage\Drainage Report-103.docx
Drainage Report
APPENDIX A
NRCS Soils Information
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Units
Soil Ratings
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Political Features
Municipalities
Cities
Urban Areas
Water Features
Oceans
Streams and Canals
Transportation
Rails
Roads
Interstate Highways
US Routes
State Highways
Local Roads
Other Roads
Original soil survey map sheets were prepared at publication scale.
Viewing scale and printing scale, however, may vary from the
original. Please rely on the bar scale on each map sheet for proper
map measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov
Coordinate System: UTM Zone 12N
This product is generated from the USDA-NRCS certified data as of
the version date(s) listed below.
Soil Survey Area: Rifle Area, Colorado, Parts of Garfield and Mesa
Counties
Survey Area Data: Version 6, Mar 25, 2008
Date(s) aerial images were photographed: 9/21/1993
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor shifting
of map unit boundaries may be evident.
Hydrologic Soil Group–Rifle Area, Colorado, Parts of Garfield and Mesa Counties
Natural Resources
Conservation Service
Web Soil Survey 2.0
National Cooperative Soil Survey
5/29/2008
Page 2 of 5
Hydrologic Soil Group
Hydrologic Soil Group— Summary by Map Unit — Rifle Area, Colorado, Parts of Garfield and Mesa Counties
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
4 Arvada loam, 6 to 20
percent slopes
D 172.5 4.2%
12 Bucklon-Inchau loams,
25 to 50 percent
slopes
D 159.6 3.9%
33 Ildefonso stony loam, 6
to 25 percent slopes
B 258.3 6.3%
34 Ildefonso stony loam, 25
to 45 percent slopes
B 849.1 20.7%
46 Nihill channery loam, 1 to
6 percent slopes
B 35.9 0.9%
55 Potts loam, 3 to 6 percent
slopes
B 223.2 5.4%
56 Potts loam, 6 to 12
percent slopes
B 552.3 13.5%
58 Potts-Ildefonso complex,
12 to 25 percent
slopes
B 728.3 17.8%
59 Potts-Ildefonso complex,
25 to 45 percent
slopes
B 6.9 0.2%
65 Torrifluvents, nearly level D 180.1 4.4%
66 Torriorthents-
Camborthids-Rock
outcrop complex,
steep
D 245.8 6.0%
67 Torriorthents-Rock
outcrop complex,
steep
D 536.0 13.1%
72 Wann sandy loam, 1 to 3
percent slopes
B 75.5 1.8%
73 Water 79.3 1.9%
Totals for Area of Interest (AOI)4,102.8 100.0%
Hydrologic Soil Group–Rifle Area, Colorado, Parts of Garfield and Mesa
Counties
Natural Resources
Conservation Service
Web Soil Survey 2.0
National Cooperative Soil Survey
5/29/2008
Page 3 of 5
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive precipitation
from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly
wet. These consist mainly of deep, well drained to excessively drained sands or
gravelly sands. These soils have a high rate of water transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well drained
soils that have moderately fine texture to moderately coarse texture. These soils
have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of water
transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay layer
at or near the surface, and soils that are shallow over nearly impervious material.
These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in their
natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Hydrologic Soil Group–Rifle Area, Colorado, Parts of Garfield and Mesa
Counties
Natural Resources
Conservation Service
Web Soil Survey 2.0
National Cooperative Soil Survey
5/29/2008
Page 4 of 5
Aggregation is the process by which a set of component attribute values is reduced
to a single value that represents the map unit as a whole.
A map unit is typically composed of one or more "components". A component is
either some type of soil or some nonsoil entity, e.g., rock outcrop. For the attribute
being aggregated, the first step of the aggregation process is to derive one attribute
value for each of a map unit's components. From this set of component attributes,
the next step of the aggregation process derives a single value that represents the
map unit as a whole. Once a single value for each map unit is derived, a thematic
map for soil map units can be rendered. Aggregation must be done because, on
any soil map, map units are delineated but components are not.
For each of a map unit's components, a corresponding percent composition is
recorded. A percent composition of 60 indicates that the corresponding component
typically makes up approximately 60% of the map unit. Percent composition is a
critical factor in some, but not all, aggregation methods.
The aggregation method "Dominant Condition" first groups like attribute values for
the components in a map unit. For each group, percent composition is set to the
sum of the percent composition of all components participating in that group. These
groups now represent "conditions" rather than components. The attribute value
associated with the group with the highest cumulative percent composition is
returned. If more than one group shares the highest cumulative percent
composition, the corresponding "tie-break" rule determines which value should be
returned. The "tie-break" rule indicates whether the lower or higher group value
should be returned in the case of a percent composition tie.
The result returned by this aggregation method represents the dominant condition
throughout the map unit only when no tie has occurred.
Component Percent Cutoff: None Specified
Components whose percent composition is below the cutoff value will not be
considered. If no cutoff value is specified, all components in the database will be
considered. The data for some contrasting soils of minor extent may not be in the
database, and therefore are not considered.
Tie-break Rule: Lower
The tie-break rule indicates which value should be selected from a set of multiple
candidate values, or which value should be selected in the event of a percent
composition tie.
Hydrologic Soil Group–Rifle Area, Colorado, Parts of Garfield and Mesa
Counties
Natural Resources
Conservation Service
Web Soil Survey 2.0
National Cooperative Soil Survey
5/29/2008
Page 5 of 5
Drainage Report
APPENDIX B
PRECIPITATION DATA
Precipitation Frequency Data Output
NOAA Atlas 2
Colorado 39.420381 N 108.053412 W
Site-specific Estimates
Hydrometeorological Design Studies Center - NOAA/National Weather Service
1325 East-West Highway - Silver Spring, MD 20910 - (301) 713-1669
Thu May 29 16:57:49 2008
Map Precipitation
(inches)
Precipitation
Intensity (in/hr)
2-year
6-hour 0.88 0.15
2-year
24-hour 1.16 0.05
100-
year 6-
hour
1.96 0.33
100-
year
24-hour
2.63 0.11
Page 1 of 1Colorado Precipitation Frequency Data -- OUTPUT PAGE
5/29/2008http://hdsc.nws.noaa.gov/cgi-bin/hdsc/na2.perl?qlat=39.420381&qlon=-108.053412&sub...
Drainage Report
APPENDIX C
Pre-developed Off Site and On Site Hydrology
Calculations
1
Pre-developed
2
Pre-developed
3
Pre-developed
4
Pre-developed
5
Pre-developed
1,5 Pre
Gully
3,4 Pre
Gulley
10R
Gully
11R
Northwest control point
6PreCB
Existing Culvert
7PreCB
Existing Culvert
Drainage Diagram for 103 Pre-developedPrepared by {enter your company name here}, Printed 7/15/2008
HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
103 Pre-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 2HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
(acres)
CN Description
(subcatchment-numbers)
63.428 51 Sagebrush range, Fair, HSG B (1,2,3,4,5)
32.714 58 Pinyon/juniper range, Fair, HSG B (1,2,3,4,5)
1.079 70 Sagebrush range, Fair, HSG D (2,3,4)
60.601 80 Pinyon/juniper range, Fair, HSG D (1,2,3,4)
157.822 TOTAL AREA
103 Pre-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 3HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area
(acres)
Soil
Goup
Subcatchment
Numbers
0.000 HSG A
96.142 HSG B 1, 2, 3, 4, 5
0.000 HSG C
61.680 HSG D 1, 2, 3, 4
0.000 Other
157.822 TOTAL AREA
Type II 24-hr 100-yr Rainfall=2.63"103 Pre-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 4HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Time span=5.00-36.00 hrs, dt=0.01 hrs, 3101 points x 3
Runoff by SCS TR-20 method, UH=SCS
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Runoff Area=82.075 ac 0.00% Impervious Runoff Depth=0.35"Subcatchment 1: Pre-developed
Flow Length=6,673' Tc=40.9 min CN=65 Runoff=12.33 cfs 2.378 af
Runoff Area=31.323 ac 0.00% Impervious Runoff Depth=0.52"Subcatchment 2: Pre-developed
Flow Length=4,077' Tc=15.2 min CN=70 Runoff=17.46 cfs 1.354 af
Runoff Area=4.944 ac 0.00% Impervious Runoff Depth=0.82"Subcatchment 3: Pre-developed
Flow Length=1,154' Tc=11.2 min CN=77 Runoff=5.82 cfs 0.339 af
Runoff Area=27.733 ac 0.00% Impervious Runoff Depth=0.13"Subcatchment 4: Pre-developed
Flow Length=1,430' Tc=10.9 min CN=56 Runoff=0.77 cfs 0.290 af
Runoff Area=11.747 ac 0.00% Impervious Runoff Depth=0.09"Subcatchment 5: Pre-developed
Flow Length=1,403' Tc=8.8 min CN=54 Runoff=0.16 cfs 0.089 af
Avg. Depth=0.76' Max Vel=10.79 fps Inflow=12.49 cfs 2.467 afReach 1,5 Pre: Gully
n=0.022 L=1,500.0' S=0.1080 '/' Capacity=164.85 cfs Outflow=12.40 cfs 2.467 af
Avg. Depth=0.56' Max Vel=9.67 fps Inflow=6.23 cfs 0.630 afReach 3,4 Pre: Gulley
n=0.022 L=1,300.0' S=0.1308 '/' Capacity=181.40 cfs Outflow=5.99 cfs 0.630 af
Inflow=17.46 cfs 1.354 afReach 10R: Gully
Outflow=17.46 cfs 1.354 af
Avg. Depth=0.37' Max Vel=5.43 fps Inflow=14.00 cfs 3.096 afReach 11R: Northwest control point
n=0.022 L=450.0' S=0.0333 '/' Capacity=3,568.18 cfs Outflow=13.97 cfs 3.096 af
Peak Elev=5,341.69' Inflow=12.33 cfs 2.378 afPond 6Pre: Existing Culvert
48.0" x 60.0' Culvert Outflow=12.33 cfs 2.378 af
Peak Elev=5,366.50' Inflow=5.82 cfs 0.339 afPond 7Pre: Existing Culvert
18.0" x 60.0' Culvert Outflow=5.82 cfs 0.339 af
Total Runoff Area = 157.822 ac Runoff Volume = 4.451 af Average Runoff Depth = 0.34"
100.00% Pervious = 157.822 ac 0.00% Impervious = 0.000 ac
Type II 24-hr 100-yr Rainfall=2.63"103 Pre-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 5HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment 1: Pre-developed
Runoff = 12.33 cfs @ 12.50 hrs, Volume= 2.378 af, Depth= 0.35"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
7.142 58 Pinyon/juniper range, Fair, HSG B
36.491 80 Pinyon/juniper range, Fair, HSG D
38.442 51 Sagebrush range, Fair, HSG B
82.075 65 Weighted Average
82.075 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.8 25 0.0800 0.06 Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 1.16"
30.0 2,637 0.0857 1.46 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
4.1 4,011 0.2199 16.23 32.47 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44'
n= 0.025 Earth, clean & winding
40.9 6,673 Total
Subcatchment 1: Pre-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=82.075 ac
Runoff Volume=2.378 af
Runoff Depth=0.35"
Flow Length=6,673'
Tc=40.9 min
CN=65
12.33 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 6HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment 2: Pre-developed
Runoff = 17.46 cfs @ 12.10 hrs, Volume= 1.354 af, Depth= 0.52"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
6.476 58 Pinyon/juniper range, Fair, HSG B
19.005 80 Pinyon/juniper range, Fair, HSG D
5.170 51 Sagebrush range, Fair, HSG B
0.672 70 Sagebrush range, Fair, HSG D
31.323 70 Weighted Average
31.323 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.8 25 0.0800 0.06 Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 1.16"
5.0 568 0.1427 1.89 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
3.4 3,484 0.2402 16.97 33.93 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
15.2 4,077 Total
Subcatchment 2: Pre-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=31.323 ac
Runoff Volume=1.354 af
Runoff Depth=0.52"
Flow Length=4,077'
Tc=15.2 min
CN=70
17.46 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 7HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment 3: Pre-developed
Runoff = 5.82 cfs @ 12.04 hrs, Volume= 0.339 af, Depth= 0.82"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
0.382 58 Pinyon/juniper range, Fair, HSG B
4.139 80 Pinyon/juniper range, Fair, HSG D
0.236 51 Sagebrush range, Fair, HSG B
0.187 70 Sagebrush range, Fair, HSG D
4.944 77 Weighted Average
4.944 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
4.4 25 0.2400 0.10 Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 1.16"
6.2 835 0.2023 2.25 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
0.6 294 0.0510 7.82 15.64 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
11.2 1,154 Total
Subcatchment 3: Pre-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
6
5
4
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=4.944 ac
Runoff Volume=0.339 af
Runoff Depth=0.82"
Flow Length=1,154'
Tc=11.2 min
CN=77
5.82 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 8HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment 4: Pre-developed
Runoff = 0.77 cfs @ 12.14 hrs, Volume= 0.290 af, Depth= 0.13"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
13.635 58 Pinyon/juniper range, Fair, HSG B
0.966 80 Pinyon/juniper range, Fair, HSG D
12.912 51 Sagebrush range, Fair, HSG B
0.220 70 Sagebrush range, Fair, HSG D
27.733 56 Weighted Average
27.733 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
5.1 25 0.1600 0.08 Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 1.16"
4.7 555 0.1550 1.97 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
1.1 850 0.1317 12.56 25.13 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
10.9 1,430 Total
Subcatchment 4: Pre-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=27.733 ac
Runoff Volume=0.290 af
Runoff Depth=0.13"
Flow Length=1,430'
Tc=10.9 min
CN=56
0.77 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 9HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment 5: Pre-developed
Runoff = 0.16 cfs @ 12.47 hrs, Volume= 0.089 af, Depth= 0.09"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
5.079 58 Pinyon/juniper range, Fair, HSG B
6.668 51 Sagebrush range, Fair, HSG B
11.747 54 Weighted Average
11.747 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.8 25 0.0800 0.06 Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 1.16"
0.1 23 0.5109 3.57 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
1.9 1,355 0.1129 11.63 23.26 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
8.8 1,403 Total
Subcatchment 5: Pre-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=11.747 ac
Runoff Volume=0.089 af
Runoff Depth=0.09"
Flow Length=1,403'
Tc=8.8 min
CN=54
0.16 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 10HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 1,5 Pre: Gully
Inflow Area = 93.822 ac, 0.00% Impervious, Inflow Depth = 0.32" for 100-yr event
Inflow = 12.49 cfs @ 12.50 hrs, Volume= 2.467 af
Outflow = 12.40 cfs @ 12.53 hrs, Volume= 2.467 af, Atten= 1%, Lag= 1.7 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 10.79 fps, Min. Travel Time= 2.3 min
Avg. Velocity = 5.85 fps, Avg. Travel Time= 4.3 min
Peak Storage= 1,724 cf @ 12.53 hrs, Average Depth at Peak Storage= 0.76'
Bank-Full Depth= 2.00', Capacity at Bank-Full= 164.85 cfs
0.00' x 2.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 2.0 '/' Top Width= 8.00'
Length= 1,500.0' Slope= 0.1080 '/'
Inlet Invert= 5,302.00', Outlet Invert= 5,140.00'
Reach 1,5 Pre: Gully
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=93.822 ac
Avg. Depth=0.76'
Max Vel=10.79 fps
n=0.022
L=1,500.0'
S=0.1080 '/'
Capacity=164.85 cfs
12.49 cfs12.40 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 11HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 3,4 Pre: Gulley
Inflow Area = 32.677 ac, 0.00% Impervious, Inflow Depth = 0.23" for 100-yr event
Inflow = 6.23 cfs @ 12.05 hrs, Volume= 0.630 af
Outflow = 5.99 cfs @ 12.08 hrs, Volume= 0.630 af, Atten= 4%, Lag= 1.6 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 9.67 fps, Min. Travel Time= 2.2 min
Avg. Velocity = 4.68 fps, Avg. Travel Time= 4.6 min
Peak Storage= 806 cf @ 12.08 hrs, Average Depth at Peak Storage= 0.56'
Bank-Full Depth= 2.00', Capacity at Bank-Full= 181.40 cfs
0.00' x 2.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 2.0 '/' Top Width= 8.00'
Length= 1,300.0' Slope= 0.1308 '/'
Inlet Invert= 5,361.00', Outlet Invert= 5,191.00'
Reach 3,4 Pre: Gulley
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
6
5
4
3
2
1
0
Inflow Area=32.677 ac
Avg. Depth=0.56'
Max Vel=9.67 fps
n=0.022
L=1,300.0'
S=0.1308 '/'
Capacity=181.40 cfs
6.23 cfs
5.99 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 12HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 10R: Gully
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 31.323 ac, 0.00% Impervious, Inflow Depth = 0.52" for 100-yr event
Inflow = 17.46 cfs @ 12.10 hrs, Volume= 1.354 af
Outflow = 17.46 cfs @ 12.10 hrs, Volume= 1.354 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Reach 10R: Gully
InflowOutflow
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Flo
w
(
c
f
s
)
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=31.323 ac
17.46 cfs17.46 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 13HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 11R: Northwest control point
[62] Warning: Exceeded Reach 1,5 Pre OUTLET depth by 15.07' @ 11.91 hrs
Inflow Area = 126.499 ac, 0.00% Impervious, Inflow Depth = 0.29" for 100-yr event
Inflow = 14.00 cfs @ 12.51 hrs, Volume= 3.096 af
Outflow = 13.97 cfs @ 12.53 hrs, Volume= 3.096 af, Atten= 0%, Lag= 1.0 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 5.43 fps, Min. Travel Time= 1.4 min
Avg. Velocity = 2.76 fps, Avg. Travel Time= 2.7 min
Peak Storage= 1,157 cf @ 12.53 hrs, Average Depth at Peak Storage= 0.37'
Bank-Full Depth= 5.00', Capacity at Bank-Full= 3,568.18 cfs
5.00' x 5.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 5.0 '/' Top Width= 55.00'
Length= 450.0' Slope= 0.0333 '/'
Inlet Invert= 5,155.00', Outlet Invert= 5,140.00'
‡
Reach 11R: Northwest control point
Inflow
Outflow
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=126.499 ac
Avg. Depth=0.37'
Max Vel=5.43 fps
n=0.022
L=450.0'
S=0.0333 '/'
Capacity=3,568.18 cfs
14.00 cfs13.97 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 14HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 6Pre: Existing Culvert
Inflow Area = 82.075 ac, 0.00% Impervious, Inflow Depth = 0.35" for 100-yr event
Inflow = 12.33 cfs @ 12.50 hrs, Volume= 2.378 af
Outflow = 12.33 cfs @ 12.50 hrs, Volume= 2.378 af, Atten= 0%, Lag= 0.0 min
Primary = 12.33 cfs @ 12.50 hrs, Volume= 2.378 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,341.69' @ 12.50 hrs
Flood Elev= 5,646.33'
Device Routing Invert Outlet Devices
#1 Primary 5,340.30'48.0" x 60.0' long Culvert CMP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,332.80' S= 0.1250 '/' Cc= 0.900
n= 0.025 Corrugated metal
Primary OutFlow Max=12.33 cfs @ 12.50 hrs HW=5,341.69' TW=5,302.76' (Dynamic Tailwater)
1=Culvert (Inlet Controls 12.33 cfs @ 3.17 fps)
Pond 6Pre: Existing Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=82.075 ac
Peak Elev=5,341.69'
48.0" x 60.0' Culvert
12.33 cfs12.33 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 15HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 7Pre: Existing Culvert
Inflow Area = 4.944 ac, 0.00% Impervious, Inflow Depth = 0.82" for 100-yr event
Inflow = 5.82 cfs @ 12.04 hrs, Volume= 0.339 af
Outflow = 5.82 cfs @ 12.04 hrs, Volume= 0.339 af, Atten= 0%, Lag= 0.0 min
Primary = 5.82 cfs @ 12.04 hrs, Volume= 0.339 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,366.50' @ 12.04 hrs
Flood Elev= 5,368.00'
Device Routing Invert Outlet Devices
#1 Primary 5,365.00'18.0" x 60.0' long insert CMP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,361.00' S= 0.0667 '/' Cc= 0.900
n= 0.025 Corrugated metal
Primary OutFlow Max=5.82 cfs @ 12.04 hrs HW=5,366.50' TW=5,361.54' (Dynamic Tailwater)
1=insert (Inlet Controls 5.82 cfs @ 3.29 fps)
Pond 7Pre: Existing Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
6
5
4
3
2
1
0
Inflow Area=4.944 ac
Peak Elev=5,366.50'
18.0" x 60.0' Culvert
5.82 cfs5.82 cfs
Drainage Report
APPENDIX D
Post-developed Hydrology Calculations
1
Pre-developed
2
Pre-developed
3
Pre-developed
4
Pre-developed
5
Pre-developed
A
Post-developed
B
Post-developed
C
Post-developed
D
Post-developed
E
Post-developed
F
Post-developed
G
Post-developed
H
Post-developed
I
Post-developed
J
Post-developed
2R
Ditch
4R
Gully
6R
Ditch
7R
Gully
8Pre
Gulley
8R
Ditch
9R
(new Reach)
10R
Gully
11R
Gully
NW Post
Northwest control point
1PCB
Culvert
3PCB
Culvert
4P
North Pond
5PCB
Culvert
6PreCB
Existing Culvert
7PCB
Culvert
7PreCB
Existing Culvert
9PCB
Culvert
10PCB
Culvert
13P
East Pond
14P
West Pond
Drainage Diagram for 103 Pre and Post-developedPrepared by {enter your company name here}, Printed 7/15/2008
HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 2HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
(acres)
CN Description
(subcatchment-numbers)
66.014 51 Sagebrush range, Fair, HSG B (1,2,3,4,5,A,E,G)
32.714 58 Pinyon/juniper range, Fair, HSG B (1,2,3,4,5)
2.358 69 50-75% Grass cover, Fair, HSG B (A,B,D,E,F,H,I)
2.041 70 Sagebrush range, Fair, HSG D (2,3,4,A,E)
60.601 80 Pinyon/juniper range, Fair, HSG D (1,2,3,4)
0.068 84 50-75% Grass cover, Fair, HSG D (A,E)
9.571 85 Gravel roads, HSG B (A,B,C,D,E,F,G,H,I,J)
173.367 TOTAL AREA
103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 3HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area
(acres)
Soil
Goup
Subcatchment
Numbers
0.000 HSG A
110.657 HSG B 1, 2, 3, 4, 5, A, B, C, D, E, F, G, H, I, J
0.000 HSG C
62.710 HSG D 1, 2, 3, 4, A, E
0.000 Other
173.367 TOTAL AREA
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 4HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Time span=5.00-36.00 hrs, dt=0.01 hrs, 3101 points x 3
Runoff by SCS TR-20 method, UH=SCS
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Runoff Area=82.075 ac 0.00% Impervious Runoff Depth=0.35"Subcatchment 1: Pre-developed
Flow Length=6,673' Tc=40.9 min CN=65 Runoff=12.33 cfs 2.378 af
Runoff Area=31.323 ac 0.00% Impervious Runoff Depth=0.52"Subcatchment 2: Pre-developed
Flow Length=4,077' Tc=15.2 min CN=70 Runoff=17.46 cfs 1.354 af
Runoff Area=4.944 ac 0.00% Impervious Runoff Depth=0.82"Subcatchment 3: Pre-developed
Flow Length=1,154' Tc=11.2 min CN=77 Runoff=5.82 cfs 0.339 af
Runoff Area=27.733 ac 0.00% Impervious Runoff Depth=0.13"Subcatchment 4: Pre-developed
Flow Length=1,430' Tc=10.9 min CN=56 Runoff=0.77 cfs 0.290 af
Runoff Area=11.747 ac 0.00% Impervious Runoff Depth=0.09"Subcatchment 5: Pre-developed
Flow Length=1,403' Tc=8.8 min CN=54 Runoff=0.16 cfs 0.089 af
Runoff Area=3.166 ac 0.00% Impervious Runoff Depth=0.48"Subcatchment A: Post-developed
Flow Length=1,172' Tc=2.5 min CN=69 Runoff=2.86 cfs 0.127 af
Runoff Area=2.135 ac 0.00% Impervious Runoff Depth=1.04"Subcatchment B: Post-developed
Flow Length=542' Tc=2.0 min CN=81 Runoff=4.62 cfs 0.184 af
Runoff Area=0.981 ac 0.00% Impervious Runoff Depth=1.28"Subcatchment C: Post-developed
Flow Length=409' Tc=2.0 min CN=85 Runoff=2.60 cfs 0.105 af
Runoff Area=0.593 ac 0.00% Impervious Runoff Depth=1.09"Subcatchment D: Post-developed
Flow Length=222' Tc=1.4 min CN=82 Runoff=1.38 cfs 0.054 af
Runoff Area=1.730 ac 0.00% Impervious Runoff Depth=0.64"Subcatchment E: Post-developed
Flow Length=487' Tc=1.4 min CN=73 Runoff=2.30 cfs 0.092 af
Runoff Area=1.725 ac 0.00% Impervious Runoff Depth=0.93"Subcatchment F: Post-developed
Flow Length=345' Tc=1.3 min CN=79 Runoff=3.42 cfs 0.133 af
Runoff Area=2.237 ac 0.00% Impervious Runoff Depth=0.48"Subcatchment G: Post-developed
Flow Length=532' Tc=1.5 min CN=69 Runoff=2.10 cfs 0.090 af
Runoff Area=0.919 ac 0.00% Impervious Runoff Depth=1.15"Subcatchment H: Post-developed
Flow Length=425' Tc=1.0 min CN=83 Runoff=2.28 cfs 0.088 af
Runoff Area=1.301 ac 0.00% Impervious Runoff Depth=0.87"Subcatchment I: Post-developed
Flow Length=379' Tc=1.7 min CN=78 Runoff=2.39 cfs 0.095 af
Runoff Area=0.758 ac 0.00% Impervious Runoff Depth=1.28"Subcatchment J: Post-developed
Flow Length=402' Tc=1.0 min CN=85 Runoff=2.08 cfs 0.081 af
Avg. Depth=0.63' Max Vel=5.73 fps Inflow=4.62 cfs 0.184 afReach 2R: Ditch
n=0.025 L=100.0' S=0.0500 '/' Capacity=98.71 cfs Outflow=4.60 cfs 0.184 af
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 5HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Avg. Depth=0.65' Max Vel=11.61 fps Inflow=9.99 cfs 0.416 afReach 4R: Gully
n=0.022 L=516.0' S=0.1531 '/' Capacity=196.28 cfs Outflow=9.83 cfs 0.416 af
Avg. Depth=0.55' Max Vel=8.99 fps Inflow=5.42 cfs 0.722 afReach 6R: Ditch
n=0.025 L=175.0' S=0.1486 '/' Capacity=170.15 cfs Outflow=5.42 cfs 0.722 af
Avg. Depth=0.44' Max Vel=6.65 fps Inflow=17.46 cfs 1.354 afReach 7R: Gully
n=0.022 L=900.0' S=0.0367 '/' Capacity=629.68 cfs Outflow=17.00 cfs 1.354 af
Avg. Depth=0.86' Max Vel=3.44 fps Inflow=6.23 cfs 0.630 afReach 8Pre: Gulley
n=0.022 L=1,300.0' S=0.0092 '/' Capacity=48.19 cfs Outflow=5.10 cfs 0.630 af
Avg. Depth=0.65' Max Vel=8.04 fps Inflow=6.96 cfs 0.855 afReach 8R: Ditch
n=0.025 L=380.0' S=0.0946 '/' Capacity=135.76 cfs Outflow=6.85 cfs 0.855 af
Inflow=12.49 cfs 2.467 afReach 9R: (new Reach)
Outflow=12.49 cfs 2.467 af
Avg. Depth=0.72' Max Vel=12.34 fps Inflow=12.79 cfs 2.643 afReach 10R: Gully
n=0.022 L=225.0' S=0.1511 '/' Capacity=195.00 cfs Outflow=12.79 cfs 2.643 af
Avg. Depth=0.44' Max Vel=3.45 fps Inflow=1.38 cfs 0.054 afReach 11R: Gully
n=0.022 L=220.0' S=0.0227 '/' Capacity=75.62 cfs Outflow=1.34 cfs 0.054 af
Avg. Depth=0.46' Max Vel=7.66 fps Inflow=14.55 cfs 4.145 afReach NW Post: Northwest control point
n=0.022 L=1,200.0' S=0.0508 '/' Capacity=1,101.08 cfs Outflow=13.80 cfs 4.145 af
Peak Elev=5,313.73' Inflow=4.62 cfs 0.184 afPond 1P: Culvert
18.0" x 27.1' Culvert Outflow=4.62 cfs 0.184 af
Peak Elev=5,307.40' Inflow=7.20 cfs 0.289 afPond 3P: Culvert
18.0" x 37.4' Culvert Outflow=7.20 cfs 0.289 af
Peak Elev=5,222.07' Storage=759 cf Inflow=10.99 cfs 1.033 afPond 4P: North Pond
Outflow=9.79 cfs 1.033 af
Peak Elev=5,349.32' Inflow=5.42 cfs 0.722 afPond 5P: Culvert
18.0" x 20.0' Culvert Outflow=5.42 cfs 0.722 af
Peak Elev=5,341.69' Inflow=12.33 cfs 2.378 afPond 6Pre: Existing Culvert
48.0" x 60.0' Culvert Outflow=12.33 cfs 2.378 af
Peak Elev=5,321.41' Inflow=6.96 cfs 0.855 afPond 7P: Culvert
18.0" x 20.0' Culvert Outflow=6.96 cfs 0.855 af
Peak Elev=5,366.50' Inflow=5.82 cfs 0.339 afPond 7Pre: Existing Culvert
18.0" x 60.0' Culvert Outflow=5.82 cfs 0.339 af
Peak Elev=5,281.51' Inflow=8.91 cfs 0.945 afPond 9P: Culvert
18.0" x 20.0' Culvert Outflow=8.91 cfs 0.945 af
Peak Elev=5,318.96' Inflow=12.66 cfs 2.562 afPond 10P: Culvert
18.0" x 70.0' Culvert Outflow=12.66 cfs 2.562 af
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 6HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Peak Elev=5,214.50' Storage=7,997 cf Inflow=11.14 cfs 0.470 afPond 13P: East Pond
Outflow=0.70 cfs 0.470 af
Peak Elev=5,266.79' Storage=4,481 cf Inflow=12.79 cfs 2.643 afPond 14P: West Pond
Outflow=10.61 cfs 2.642 af
Total Runoff Area = 173.367 ac Runoff Volume = 5.500 af Average Runoff Depth = 0.38"
100.00% Pervious = 173.367 ac 0.00% Impervious = 0.000 ac
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 7HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment 1: Pre-developed
Runoff = 12.33 cfs @ 12.50 hrs, Volume= 2.378 af, Depth= 0.35"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
7.142 58 Pinyon/juniper range, Fair, HSG B
36.491 80 Pinyon/juniper range, Fair, HSG D
38.442 51 Sagebrush range, Fair, HSG B
82.075 65 Weighted Average
82.075 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.8 25 0.0800 0.06 Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 1.16"
30.0 2,637 0.0857 1.46 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
4.1 4,011 0.2199 16.23 32.47 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44'
n= 0.025 Earth, clean & winding
40.9 6,673 Total
Subcatchment 1: Pre-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=82.075 ac
Runoff Volume=2.378 af
Runoff Depth=0.35"
Flow Length=6,673'
Tc=40.9 min
CN=65
12.33 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 8HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment 2: Pre-developed
Runoff = 17.46 cfs @ 12.10 hrs, Volume= 1.354 af, Depth= 0.52"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
6.476 58 Pinyon/juniper range, Fair, HSG B
19.005 80 Pinyon/juniper range, Fair, HSG D
5.170 51 Sagebrush range, Fair, HSG B
0.672 70 Sagebrush range, Fair, HSG D
31.323 70 Weighted Average
31.323 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.8 25 0.0800 0.06 Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 1.16"
5.0 568 0.1427 1.89 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
3.4 3,484 0.2402 16.97 33.93 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
15.2 4,077 Total
Subcatchment 2: Pre-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=31.323 ac
Runoff Volume=1.354 af
Runoff Depth=0.52"
Flow Length=4,077'
Tc=15.2 min
CN=70
17.46 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 9HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment 3: Pre-developed
Runoff = 5.82 cfs @ 12.04 hrs, Volume= 0.339 af, Depth= 0.82"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
0.382 58 Pinyon/juniper range, Fair, HSG B
4.139 80 Pinyon/juniper range, Fair, HSG D
0.236 51 Sagebrush range, Fair, HSG B
0.187 70 Sagebrush range, Fair, HSG D
4.944 77 Weighted Average
4.944 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
4.4 25 0.2400 0.10 Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 1.16"
6.2 835 0.2023 2.25 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
0.6 294 0.0510 7.82 15.64 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
11.2 1,154 Total
Subcatchment 3: Pre-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
6
5
4
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=4.944 ac
Runoff Volume=0.339 af
Runoff Depth=0.82"
Flow Length=1,154'
Tc=11.2 min
CN=77
5.82 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 10HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment 4: Pre-developed
Runoff = 0.77 cfs @ 12.14 hrs, Volume= 0.290 af, Depth= 0.13"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
13.635 58 Pinyon/juniper range, Fair, HSG B
0.966 80 Pinyon/juniper range, Fair, HSG D
12.912 51 Sagebrush range, Fair, HSG B
0.220 70 Sagebrush range, Fair, HSG D
27.733 56 Weighted Average
27.733 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
5.1 25 0.1600 0.08 Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 1.16"
4.7 555 0.1550 1.97 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
1.1 850 0.1317 12.56 25.13 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
10.9 1,430 Total
Subcatchment 4: Pre-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=27.733 ac
Runoff Volume=0.290 af
Runoff Depth=0.13"
Flow Length=1,430'
Tc=10.9 min
CN=56
0.77 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 11HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment 5: Pre-developed
Runoff = 0.16 cfs @ 12.47 hrs, Volume= 0.089 af, Depth= 0.09"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
5.079 58 Pinyon/juniper range, Fair, HSG B
6.668 51 Sagebrush range, Fair, HSG B
11.747 54 Weighted Average
11.747 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.8 25 0.0800 0.06 Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 1.16"
0.1 23 0.5109 3.57 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
1.9 1,355 0.1129 11.63 23.26 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
8.8 1,403 Total
Subcatchment 5: Pre-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=11.747 ac
Runoff Volume=0.089 af
Runoff Depth=0.09"
Flow Length=1,403'
Tc=8.8 min
CN=54
0.16 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 12HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment A: Post-developed
Runoff = 2.86 cfs @ 11.94 hrs, Volume= 0.127 af, Depth= 0.48"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
1.299 85 Gravel roads, HSG B
0.213 69 50-75% Grass cover, Fair, HSG B
0.030 84 50-75% Grass cover, Fair, HSG D
1.214 51 Sagebrush range, Fair, HSG B
0.410 70 Sagebrush range, Fair, HSG D
3.166 69 Weighted Average
3.166 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.3 25 0.1544 1.42 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.5 218 0.1941 7.09 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
1.7 929 0.0528 9.04 18.08 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44'
n= 0.022 Earth, clean & straight
2.5 1,172 Total
Subcatchment A: Post-developed
Runoff
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=3.166 ac
Runoff Volume=0.127 af
Runoff Depth=0.48"
Flow Length=1,172'
Tc=2.5 min
CN=69
2.86 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 13HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment B: Post-developed
Runoff = 4.62 cfs @ 11.93 hrs, Volume= 0.184 af, Depth= 1.04"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
1.550 85 Gravel roads, HSG B
0.585 69 50-75% Grass cover, Fair, HSG B
2.135 81 Weighted Average
2.135 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.6 25 0.0288 0.73 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.4 180 0.1867 6.96 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
1.0 337 0.0291 5.91 11.81 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44'
n= 0.025 Earth, clean & winding
2.0 542 Total
Subcatchment B: Post-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
5
4
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=2.135 ac
Runoff Volume=0.184 af
Runoff Depth=1.04"
Flow Length=542'
Tc=2.0 min
CN=81
4.62 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 14HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment C: Post-developed
Runoff = 2.60 cfs @ 11.93 hrs, Volume= 0.105 af, Depth= 1.28"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
0.981 85 Gravel roads, HSG B
0.981 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.7 25 0.0196 0.62 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.1 54 0.2497 8.05 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
1.2 330 0.0182 4.67 9.34 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
2.0 409 Total
Subcatchment C: Post-developed
Runoff
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=0.981 ac
Runoff Volume=0.105 af
Runoff Depth=1.28"
Flow Length=409'
Tc=2.0 min
CN=85
2.60 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 15HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment D: Post-developed
Runoff = 1.38 cfs @ 11.92 hrs, Volume= 0.054 af, Depth= 1.09"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
0.497 85 Gravel roads, HSG B
0.096 69 50-75% Grass cover, Fair, HSG B
0.593 82 Weighted Average
0.593 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.6 25 0.0312 0.75 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.2 85 0.1269 5.74 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
0.6 112 0.0074 2.98 5.96 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
1.4 222 Total
Subcatchment D: Post-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=0.593 ac
Runoff Volume=0.054 af
Runoff Depth=1.09"
Flow Length=222'
Tc=1.4 min
CN=82
1.38 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 16HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment E: Post-developed
Runoff = 2.30 cfs @ 11.92 hrs, Volume= 0.092 af, Depth= 0.64"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
0.727 85 Gravel roads, HSG B
0.089 69 50-75% Grass cover, Fair, HSG B
0.038 84 50-75% Grass cover, Fair, HSG D
0.324 51 Sagebrush range, Fair, HSG B
0.552 70 Sagebrush range, Fair, HSG D
1.730 73 Weighted Average
1.730 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.3 25 0.1524 1.41 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.5 210 0.1956 7.12 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
0.6 252 0.0374 6.69 13.39 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
1.4 487 Total
Subcatchment E: Post-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=1.730 ac
Runoff Volume=0.092 af
Runoff Depth=0.64"
Flow Length=487'
Tc=1.4 min
CN=73
2.30 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 17HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment F: Post-developed
Runoff = 3.42 cfs @ 11.92 hrs, Volume= 0.133 af, Depth= 0.93"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
1.060 85 Gravel roads, HSG B
0.665 69 50-75% Grass cover, Fair, HSG B
1.725 79 Weighted Average
1.725 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.6 25 0.0212 0.64 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.2 122 0.2585 8.19 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
0.5 198 0.0358 6.55 13.10 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
1.3 345 Total
Subcatchment F: Post-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=1.725 ac
Runoff Volume=0.133 af
Runoff Depth=0.93"
Flow Length=345'
Tc=1.3 min
CN=79
3.42 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 18HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment G: Post-developed
Runoff = 2.10 cfs @ 11.93 hrs, Volume= 0.090 af, Depth= 0.48"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
1.189 85 Gravel roads, HSG B
1.048 51 Sagebrush range, Fair, HSG B
2.237 69 Weighted Average
2.237 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.6 25 0.0216 0.65 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.1 47 0.3076 8.93 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
0.8 460 0.0710 9.22 18.45 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
1.5 532 Total
Subcatchment G: Post-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=2.237 ac
Runoff Volume=0.090 af
Runoff Depth=0.48"
Flow Length=532'
Tc=1.5 min
CN=69
2.10 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 19HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment H: Post-developed
[49] Hint: Tc<2dt may require smaller dt
Runoff = 2.28 cfs @ 11.91 hrs, Volume= 0.088 af, Depth= 1.15"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
0.777 85 Gravel roads, HSG B
0.142 69 50-75% Grass cover, Fair, HSG B
0.919 83 Weighted Average
0.919 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.3 25 0.1244 1.30 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.1 25 0.2092 7.36 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
0.6 375 0.1028 11.10 22.20 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
1.0 425 Total
Subcatchment H: Post-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=0.919 ac
Runoff Volume=0.088 af
Runoff Depth=1.15"
Flow Length=425'
Tc=1.0 min
CN=83
2.28 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 20HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment I: Post-developed
Runoff = 2.39 cfs @ 11.92 hrs, Volume= 0.095 af, Depth= 0.87"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
0.733 85 Gravel roads, HSG B
0.568 69 50-75% Grass cover, Fair, HSG B
1.301 78 Weighted Average
1.301 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.7 25 0.0200 0.63 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.2 110 0.2681 8.34 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
0.8 244 0.0194 4.82 9.64 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
1.7 379 Total
Subcatchment I: Post-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=1.301 ac
Runoff Volume=0.095 af
Runoff Depth=0.87"
Flow Length=379'
Tc=1.7 min
CN=78
2.39 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 21HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment J: Post-developed
[49] Hint: Tc<2dt may require smaller dt
Runoff = 2.08 cfs @ 11.91 hrs, Volume= 0.081 af, Depth= 1.28"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
0.758 85 Gravel roads, HSG B
0.758 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.3 25 0.2092 1.61 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.1 25 0.1140 5.44 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
0.6 352 0.0790 9.73 19.46 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
1.0 402 Total
Subcatchment J: Post-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=0.758 ac
Runoff Volume=0.081 af
Runoff Depth=1.28"
Flow Length=402'
Tc=1.0 min
CN=85
2.08 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 22HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 2R: Ditch
Inflow Area = 2.135 ac, 0.00% Impervious, Inflow Depth = 1.04" for 100-yr event
Inflow = 4.62 cfs @ 11.93 hrs, Volume= 0.184 af
Outflow = 4.60 cfs @ 11.93 hrs, Volume= 0.184 af, Atten= 0%, Lag= 0.2 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 5.73 fps, Min. Travel Time= 0.3 min
Avg. Velocity = 2.13 fps, Avg. Travel Time= 0.8 min
Peak Storage= 80 cf @ 11.93 hrs, Average Depth at Peak Storage= 0.63'
Bank-Full Depth= 2.00', Capacity at Bank-Full= 98.71 cfs
0.00' x 2.00' deep channel, n= 0.025
Side Slope Z-value= 2.0 '/' Top Width= 8.00'
Length= 100.0' Slope= 0.0500 '/'
Inlet Invert= 5,312.00', Outlet Invert= 5,307.00'
Reach 2R: Ditch
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
5
4
3
2
1
0
Inflow Area=2.135 ac
Avg. Depth=0.63'
Max Vel=5.73 fps
n=0.025
L=100.0'
S=0.0500 '/'
Capacity=98.71 cfs
4.62 cfs4.60 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 23HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 4R: Gully
Inflow Area = 6.282 ac, 0.00% Impervious, Inflow Depth = 0.80" for 100-yr event
Inflow = 9.99 cfs @ 11.93 hrs, Volume= 0.416 af
Outflow = 9.83 cfs @ 11.94 hrs, Volume= 0.416 af, Atten= 2%, Lag= 0.6 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 11.61 fps, Min. Travel Time= 0.7 min
Avg. Velocity = 4.15 fps, Avg. Travel Time= 2.1 min
Peak Storage= 437 cf @ 11.94 hrs, Average Depth at Peak Storage= 0.65'
Bank-Full Depth= 2.00', Capacity at Bank-Full= 196.28 cfs
0.00' x 2.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 2.0 '/' Top Width= 8.00'
Length= 516.0' Slope= 0.1531 '/'
Inlet Invert= 5,295.00', Outlet Invert= 5,216.00'
Reach 4R: Gully
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=6.282 ac
Avg. Depth=0.65'
Max Vel=11.61 fps
n=0.022
L=516.0'
S=0.1531 '/'
Capacity=196.28 cfs
9.99 cfs
9.83 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 24HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 6R: Ditch
Inflow Area = 34.407 ac, 0.00% Impervious, Inflow Depth = 0.25" for 100-yr event
Inflow = 5.42 cfs @ 12.11 hrs, Volume= 0.722 af
Outflow = 5.42 cfs @ 12.12 hrs, Volume= 0.722 af, Atten= 0%, Lag= 0.3 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 8.99 fps, Min. Travel Time= 0.3 min
Avg. Velocity = 4.11 fps, Avg. Travel Time= 0.7 min
Peak Storage= 106 cf @ 12.12 hrs, Average Depth at Peak Storage= 0.55'
Bank-Full Depth= 2.00', Capacity at Bank-Full= 170.15 cfs
0.00' x 2.00' deep channel, n= 0.025
Side Slope Z-value= 2.0 '/' Top Width= 8.00'
Length= 175.0' Slope= 0.1486 '/'
Inlet Invert= 5,347.00', Outlet Invert= 5,321.00'
Reach 6R: Ditch
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
6
5
4
3
2
1
0
Inflow Area=34.407 ac
Avg. Depth=0.55'
Max Vel=8.99 fps
n=0.025
L=175.0'
S=0.1486 '/'
Capacity=170.15 cfs
5.42 cfs5.42 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 25HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 7R: Gully
Inflow Area = 31.323 ac, 0.00% Impervious, Inflow Depth = 0.52" for 100-yr event
Inflow = 17.46 cfs @ 12.10 hrs, Volume= 1.354 af
Outflow = 17.00 cfs @ 12.12 hrs, Volume= 1.354 af, Atten= 3%, Lag= 1.5 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 6.65 fps, Min. Travel Time= 2.3 min
Avg. Velocity = 2.22 fps, Avg. Travel Time= 6.8 min
Peak Storage= 2,302 cf @ 12.12 hrs, Average Depth at Peak Storage= 0.44'
Bank-Full Depth= 3.00', Capacity at Bank-Full= 629.68 cfs
5.00' x 3.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 2.0 '/' Top Width= 17.00'
Length= 900.0' Slope= 0.0367 '/'
Inlet Invert= 5,235.00', Outlet Invert= 5,202.00'
Reach 7R: Gully
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=31.323 ac
Avg. Depth=0.44'
Max Vel=6.65 fps
n=0.022
L=900.0'
S=0.0367 '/'
Capacity=629.68 cfs
17.46 cfs
17.00 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 26HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 8Pre: Gulley
Inflow Area = 32.677 ac, 0.00% Impervious, Inflow Depth = 0.23" for 100-yr event
Inflow = 6.23 cfs @ 12.05 hrs, Volume= 0.630 af
Outflow = 5.10 cfs @ 12.11 hrs, Volume= 0.630 af, Atten= 18%, Lag= 3.8 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 3.44 fps, Min. Travel Time= 6.3 min
Avg. Velocity = 1.43 fps, Avg. Travel Time= 15.2 min
Peak Storage= 1,930 cf @ 12.11 hrs, Average Depth at Peak Storage= 0.86'
Bank-Full Depth= 2.00', Capacity at Bank-Full= 48.19 cfs
0.00' x 2.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 2.0 '/' Top Width= 8.00'
Length= 1,300.0' Slope= 0.0092 '/'
Inlet Invert= 5,361.00', Outlet Invert= 5,349.00'
Reach 8Pre: Gulley
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
6
5
4
3
2
1
0
Inflow Area=32.677 ac
Avg. Depth=0.86'
Max Vel=3.44 fps
n=0.022
L=1,300.0'
S=0.0092 '/'
Capacity=48.19 cfs
6.23 cfs
5.10 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 27HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 8R: Ditch
Inflow Area = 36.132 ac, 0.00% Impervious, Inflow Depth = 0.28" for 100-yr event
Inflow = 6.96 cfs @ 11.93 hrs, Volume= 0.855 af
Outflow = 6.85 cfs @ 11.94 hrs, Volume= 0.855 af, Atten= 2%, Lag= 0.7 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 8.04 fps, Min. Travel Time= 0.8 min
Avg. Velocity = 3.47 fps, Avg. Travel Time= 1.8 min
Peak Storage= 324 cf @ 11.94 hrs, Average Depth at Peak Storage= 0.65'
Bank-Full Depth= 2.00', Capacity at Bank-Full= 135.76 cfs
0.00' x 2.00' deep channel, n= 0.025
Side Slope Z-value= 2.0 '/' Top Width= 8.00'
Length= 380.0' Slope= 0.0946 '/'
Inlet Invert= 5,318.00', Outlet Invert= 5,282.06'
Reach 8R: Ditch
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
7
6
5
4
3
2
1
0
Inflow Area=36.132 ac
Avg. Depth=0.65'
Max Vel=8.04 fps
n=0.025
L=380.0'
S=0.0946 '/'
Capacity=135.76 cfs
6.96 cfs6.85 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 28HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 9R: (new Reach)
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 93.822 ac, 0.00% Impervious, Inflow Depth = 0.32" for 100-yr event
Inflow = 12.49 cfs @ 12.50 hrs, Volume= 2.467 af
Outflow = 12.49 cfs @ 12.50 hrs, Volume= 2.467 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Reach 9R: (new Reach)
InflowOutflow
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Flo
w
(
c
f
s
)
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=93.822 ac
12.49 cfs12.49 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 29HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 10R: Gully
Inflow Area = 95.881 ac, 0.00% Impervious, Inflow Depth = 0.33" for 100-yr event
Inflow = 12.79 cfs @ 12.50 hrs, Volume= 2.643 af
Outflow = 12.79 cfs @ 12.50 hrs, Volume= 2.643 af, Atten= 0%, Lag= 0.2 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 12.34 fps, Min. Travel Time= 0.3 min
Avg. Velocity = 6.35 fps, Avg. Travel Time= 0.6 min
Peak Storage= 233 cf @ 12.50 hrs, Average Depth at Peak Storage= 0.72'
Bank-Full Depth= 2.00', Capacity at Bank-Full= 195.00 cfs
0.00' x 2.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 2.0 '/' Top Width= 8.00'
Length= 225.0' Slope= 0.1511 '/'
Inlet Invert= 5,303.00', Outlet Invert= 5,269.00'
Reach 10R: Gully
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=95.881 ac
Avg. Depth=0.72'
Max Vel=12.34 fps
n=0.022
L=225.0'
S=0.1511 '/'
Capacity=195.00 cfs
12.79 cfs12.79 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 30HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 11R: Gully
Inflow Area = 0.593 ac, 0.00% Impervious, Inflow Depth = 1.09" for 100-yr event
Inflow = 1.38 cfs @ 11.92 hrs, Volume= 0.054 af
Outflow = 1.34 cfs @ 11.93 hrs, Volume= 0.054 af, Atten= 3%, Lag= 0.7 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 3.45 fps, Min. Travel Time= 1.1 min
Avg. Velocity = 1.26 fps, Avg. Travel Time= 2.9 min
Peak Storage= 85 cf @ 11.93 hrs, Average Depth at Peak Storage= 0.44'
Bank-Full Depth= 2.00', Capacity at Bank-Full= 75.62 cfs
0.00' x 2.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 2.0 '/' Top Width= 8.00'
Length= 220.0' Slope= 0.0227 '/'
Inlet Invert= 5,300.00', Outlet Invert= 5,295.00'
Reach 11R: Gully
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
1
0
Inflow Area=0.593 ac
Avg. Depth=0.44'
Max Vel=3.45 fps
n=0.022
L=220.0'
S=0.0227 '/'
Capacity=75.62 cfs
1.38 cfs
1.34 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 31HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach NW Post: Northwest control point
Inflow Area = 142.044 ac, 0.00% Impervious, Inflow Depth = 0.35" for 100-yr event
Inflow = 14.55 cfs @ 11.95 hrs, Volume= 4.145 af
Outflow = 13.80 cfs @ 11.98 hrs, Volume= 4.145 af, Atten= 5%, Lag= 1.7 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 7.66 fps, Min. Travel Time= 2.6 min
Avg. Velocity = 3.75 fps, Avg. Travel Time= 5.3 min
Peak Storage= 2,161 cf @ 11.98 hrs, Average Depth at Peak Storage= 0.46'
Bank-Full Depth= 4.00', Capacity at Bank-Full= 1,101.08 cfs
3.00' x 4.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 2.0 '/' Top Width= 19.00'
Length= 1,200.0' Slope= 0.0508 '/'
Inlet Invert= 5,201.00', Outlet Invert= 5,140.00'
Reach NW Post: Northwest control point
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=142.044 ac
Avg. Depth=0.46'
Max Vel=7.66 fps
n=0.022
L=1,200.0'
S=0.0508 '/'
Capacity=1,101.08 cfs
14.55 cfs
13.80 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 32HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 1P: Culvert
Inflow Area = 2.135 ac, 0.00% Impervious, Inflow Depth = 1.04" for 100-yr event
Inflow = 4.62 cfs @ 11.93 hrs, Volume= 0.184 af
Outflow = 4.62 cfs @ 11.93 hrs, Volume= 0.184 af, Atten= 0%, Lag= 0.0 min
Primary = 4.62 cfs @ 11.93 hrs, Volume= 0.184 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,313.73' @ 11.93 hrs
Flood Elev= 5,315.50'
Device Routing Invert Outlet Devices
#1 Primary 5,312.50'18.0" x 27.1' long Culvert CPP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,312.10' S= 0.0148 '/' Cc= 0.900 n= 0.012
Primary OutFlow Max=4.60 cfs @ 11.93 hrs HW=5,313.73' TW=5,312.63' (Dynamic Tailwater)
1=Culvert (Inlet Controls 4.60 cfs @ 2.98 fps)
Pond 1P: Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
5
4
3
2
1
0
Inflow Area=2.135 ac
Peak Elev=5,313.73'
18.0" x 27.1' Culvert
4.62 cfs4.62 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 33HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 3P: Culvert
[61] Hint: Exceeded Reach 2R outlet invert by 0.40' @ 11.93 hrs
Inflow Area = 3.116 ac, 0.00% Impervious, Inflow Depth = 1.11" for 100-yr event
Inflow = 7.20 cfs @ 11.93 hrs, Volume= 0.289 af
Outflow = 7.20 cfs @ 11.93 hrs, Volume= 0.289 af, Atten= 0%, Lag= 0.0 min
Primary = 7.20 cfs @ 11.93 hrs, Volume= 0.289 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,307.40' @ 11.93 hrs
Flood Elev= 5,308.50'
Device Routing Invert Outlet Devices
#1 Primary 5,305.50'18.0" x 37.4' long Culvert CPP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,304.75' S= 0.0201 '/' Cc= 0.900 n= 0.012
Primary OutFlow Max=7.19 cfs @ 11.93 hrs HW=5,307.40' TW=5,295.64' (Dynamic Tailwater)
1=Culvert (Inlet Controls 7.19 cfs @ 4.07 fps)
Pond 3P: Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
8
7
6
5
4
3
2
1
0
Inflow Area=3.116 ac
Peak Elev=5,307.40'
18.0" x 37.4' Culvert
7.20 cfs7.20 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 34HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 4P: North Pond
Inflow Area = 39.288 ac, 0.00% Impervious, Inflow Depth = 0.32" for 100-yr event
Inflow = 10.99 cfs @ 11.93 hrs, Volume= 1.033 af
Outflow = 9.79 cfs @ 11.96 hrs, Volume= 1.033 af, Atten= 11%, Lag= 1.9 min
Primary = 9.79 cfs @ 11.96 hrs, Volume= 1.033 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,222.07' @ 11.96 hrs Surf.Area= 713 sf Storage= 759 cf
Plug-Flow detention time= 1.1 min calculated for 1.033 af (100% of inflow)
Center-of-Mass det. time= 1.1 min ( 911.2 - 910.2 )
Volume Invert Avail.Storage Storage Description
#1 5,220.00' 1,596 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
5,220.00 80 0 0
5,221.00 326 203 203
5,222.00 683 505 708
5,223.00 1,094 889 1,596
Device Routing Invert Outlet Devices
#1 Primary 5,220.00'18.0" x 95.0' long Culvert
CPP, end-section conforming to fill, Ke= 0.500
Outlet Invert= 5,209.00' S= 0.1158 '/' Cc= 0.900 n= 0.012
#2 Primary 5,223.00'4.0' long (Profile 9) Broad-Crested Rectangular Weir
Head (feet) 1.97 2.46 2.95 3.94 4.92
Coef. (English) 3.55 3.55 3.57 3.60 3.66
Primary OutFlow Max=9.79 cfs @ 11.96 hrs HW=5,222.07' TW=5,201.45' (Dynamic Tailwater)
1=Culvert (Inlet Controls 9.79 cfs @ 5.54 fps)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 35HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Pond 4P: North Pond
Inflow
Primary
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=39.288 ac
Peak Elev=5,222.07'
Storage=759 cf
10.99 cfs
9.79 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 36HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 5P: Culvert
[61] Hint: Exceeded Reach 8Pre outlet invert by 0.32' @ 12.11 hrs
Inflow Area = 34.407 ac, 0.00% Impervious, Inflow Depth = 0.25" for 100-yr event
Inflow = 5.42 cfs @ 12.11 hrs, Volume= 0.722 af
Outflow = 5.42 cfs @ 12.11 hrs, Volume= 0.722 af, Atten= 0%, Lag= 0.0 min
Primary = 5.42 cfs @ 12.11 hrs, Volume= 0.722 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,349.32' @ 12.11 hrs
Flood Elev= 5,350.43'
Device Routing Invert Outlet Devices
#1 Primary 5,347.93'18.0" x 20.0' long Culvert CPP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,347.53' S= 0.0200 '/' Cc= 0.900 n= 0.012
Primary OutFlow Max=5.42 cfs @ 12.11 hrs HW=5,349.32' TW=5,347.55' (Dynamic Tailwater)
1=Culvert (Inlet Controls 5.42 cfs @ 3.17 fps)
Pond 5P: Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
6
5
4
3
2
1
0
Inflow Area=34.407 ac
Peak Elev=5,349.32'
18.0" x 20.0' Culvert
5.42 cfs5.42 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 37HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 6Pre: Existing Culvert
Inflow Area = 82.075 ac, 0.00% Impervious, Inflow Depth = 0.35" for 100-yr event
Inflow = 12.33 cfs @ 12.50 hrs, Volume= 2.378 af
Outflow = 12.33 cfs @ 12.50 hrs, Volume= 2.378 af, Atten= 0%, Lag= 0.0 min
Primary = 12.33 cfs @ 12.50 hrs, Volume= 2.378 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,341.69' @ 12.50 hrs
Flood Elev= 5,646.33'
Device Routing Invert Outlet Devices
#1 Primary 5,340.30'48.0" x 60.0' long Culvert CMP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,332.80' S= 0.1250 '/' Cc= 0.900
n= 0.025 Corrugated metal
Primary OutFlow Max=12.33 cfs @ 12.50 hrs HW=5,341.69' TW=0.00' (Dynamic Tailwater)
1=Culvert (Inlet Controls 12.33 cfs @ 3.17 fps)
Pond 6Pre: Existing Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=82.075 ac
Peak Elev=5,341.69'
48.0" x 60.0' Culvert
12.33 cfs12.33 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 38HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 7P: Culvert
[61] Hint: Exceeded Reach 6R outlet invert by 0.41' @ 11.93 hrs
Inflow Area = 36.132 ac, 0.00% Impervious, Inflow Depth = 0.28" for 100-yr event
Inflow = 6.96 cfs @ 11.93 hrs, Volume= 0.855 af
Outflow = 6.96 cfs @ 11.93 hrs, Volume= 0.855 af, Atten= 0%, Lag= 0.0 min
Primary = 6.96 cfs @ 11.93 hrs, Volume= 0.855 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,321.41' @ 11.93 hrs
Flood Elev= 5,322.65'
Device Routing Invert Outlet Devices
#1 Primary 5,320.00'18.0" x 20.0' long Culvert
CPP, end-section conforming to fill, Ke= 0.500
Outlet Invert= 5,319.60' S= 0.0200 '/' Cc= 0.900 n= 0.012
Primary OutFlow Max=6.94 cfs @ 11.93 hrs HW=5,321.40' TW=5,318.65' (Dynamic Tailwater)
1=Culvert (Inlet Controls 6.94 cfs @ 4.04 fps)
Pond 7P: Culvert
InflowPrimary
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
7
6
5
4
3
2
1
0
Inflow Area=36.132 ac
Peak Elev=5,321.41'
18.0" x 20.0' Culvert
6.96 cfs6.96 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 39HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 7Pre: Existing Culvert
Inflow Area = 4.944 ac, 0.00% Impervious, Inflow Depth = 0.82" for 100-yr event
Inflow = 5.82 cfs @ 12.04 hrs, Volume= 0.339 af
Outflow = 5.82 cfs @ 12.04 hrs, Volume= 0.339 af, Atten= 0%, Lag= 0.0 min
Primary = 5.82 cfs @ 12.04 hrs, Volume= 0.339 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,366.50' @ 12.04 hrs
Flood Elev= 5,368.00'
Device Routing Invert Outlet Devices
#1 Primary 5,365.00'18.0" x 60.0' long insert CMP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,361.00' S= 0.0667 '/' Cc= 0.900
n= 0.025 Corrugated metal
Primary OutFlow Max=5.82 cfs @ 12.04 hrs HW=5,366.50' TW=5,361.79' (Dynamic Tailwater)
1=insert (Inlet Controls 5.82 cfs @ 3.29 fps)
Pond 7Pre: Existing Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
6
5
4
3
2
1
0
Inflow Area=4.944 ac
Peak Elev=5,366.50'
18.0" x 60.0' Culvert
5.82 cfs5.82 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 40HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 9P: Culvert
Inflow Area = 38.369 ac, 0.00% Impervious, Inflow Depth = 0.30" for 100-yr event
Inflow = 8.91 cfs @ 11.94 hrs, Volume= 0.945 af
Outflow = 8.91 cfs @ 11.94 hrs, Volume= 0.945 af, Atten= 0%, Lag= 0.0 min
Primary = 8.91 cfs @ 11.94 hrs, Volume= 0.945 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,281.51' @ 11.94 hrs
Flood Elev= 5,282.10'
Device Routing Invert Outlet Devices
#1 Primary 5,279.00'18.0" x 20.0' long Culvert CPP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,278.60' S= 0.0200 '/' Cc= 0.900 n= 0.012
Primary OutFlow Max=8.88 cfs @ 11.94 hrs HW=5,281.50' TW=5,221.96' (Dynamic Tailwater)
1=Culvert (Inlet Controls 8.88 cfs @ 5.03 fps)
Pond 9P: Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
9
8
7
6
5
4
3
2
1
0
Inflow Area=38.369 ac
Peak Elev=5,281.51'
18.0" x 20.0' Culvert
8.91 cfs8.91 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 41HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 10P: Culvert
Inflow Area = 95.123 ac, 0.00% Impervious, Inflow Depth = 0.32" for 100-yr event
Inflow = 12.66 cfs @ 12.50 hrs, Volume= 2.562 af
Outflow = 12.66 cfs @ 12.50 hrs, Volume= 2.562 af, Atten= 0%, Lag= 0.0 min
Primary = 12.66 cfs @ 12.50 hrs, Volume= 2.562 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,318.96' @ 12.50 hrs
Flood Elev= 5,327.17'
Device Routing Invert Outlet Devices
#1 Primary 5,316.00'18.0" x 70.0' long Culvert
CPP, end-section conforming to fill, Ke= 0.500
Outlet Invert= 5,314.60' S= 0.0200 '/' Cc= 0.900 n= 0.012
Primary OutFlow Max=12.66 cfs @ 12.50 hrs HW=5,318.96' TW=5,303.72' (Dynamic Tailwater)
1=Culvert (Inlet Controls 12.66 cfs @ 7.16 fps)
Pond 10P: Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=95.123 ac
Peak Elev=5,318.96'
18.0" x 70.0' Culvert
12.66 cfs12.66 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 42HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 13P: East Pond
Inflow Area = 6.875 ac, 0.00% Impervious, Inflow Depth = 0.82" for 100-yr event
Inflow = 11.14 cfs @ 11.94 hrs, Volume= 0.470 af
Outflow = 0.70 cfs @ 12.81 hrs, Volume= 0.470 af, Atten= 94%, Lag= 52.1 min
Primary = 0.70 cfs @ 12.81 hrs, Volume= 0.470 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,214.50' @ 12.81 hrs Surf.Area= 2,864 sf Storage= 7,997 cf
Plug-Flow detention time= 105.7 min calculated for 0.470 af (100% of inflow)
Center-of-Mass det. time= 105.7 min ( 959.6 - 853.9 )
Volume Invert Avail.Storage Storage Description
#1 5,208.00' 9,522 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
5,208.00 70 0 0
5,209.00 333 202 202
5,210.00 633 483 685
5,211.00 986 810 1,494
5,212.00 1,427 1,207 2,701
5,213.00 1,965 1,696 4,397
5,214.00 2,552 2,259 6,655
5,215.00 3,182 2,867 9,522
Device Routing Invert Outlet Devices
#1 Primary 5,208.00'4.0" x 72.0' long Culvert CPP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,204.00' S= 0.0556 '/' Cc= 0.900 n= 0.012
#2 Primary 5,215.00'4.0' long (Profile 9) Broad-Crested Rectangular Weir Head (feet) 1.97 2.46 2.95 3.94 4.92
Coef. (English) 3.55 3.55 3.57 3.60 3.66
Primary OutFlow Max=0.70 cfs @ 12.81 hrs HW=5,214.50' TW=5,201.45' (Dynamic Tailwater)
1=Culvert (Barrel Controls 0.70 cfs @ 8.00 fps)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 43HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Pond 13P: East Pond
Inflow
Primary
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=6.875 ac
Peak Elev=5,214.50'
Storage=7,997 cf
11.14 cfs
0.70 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 44HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 14P: West Pond
Inflow Area = 95.881 ac, 0.00% Impervious, Inflow Depth = 0.33" for 100-yr event
Inflow = 12.79 cfs @ 12.50 hrs, Volume= 2.643 af
Outflow = 10.61 cfs @ 12.71 hrs, Volume= 2.642 af, Atten= 17%, Lag= 12.7 min
Primary = 10.61 cfs @ 12.71 hrs, Volume= 2.642 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,266.79' @ 12.71 hrs Surf.Area= 1,897 sf Storage= 4,481 cf
Plug-Flow detention time= 2.4 min calculated for 2.642 af (100% of inflow)
Center-of-Mass det. time= 2.2 min ( 947.4 - 945.2 )
Volume Invert Avail.Storage Storage Description
#1 5,260.00' 5,382 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
5,260.00 0 0 0
5,261.00 49 25 25
5,262.00 188 119 143
5,263.00 406 297 440
5,264.00 694 550 990
5,265.00 1,054 874 1,864
5,266.00 1,489 1,272 3,136
5,267.00 2,003 1,746 4,882
5,267.50 0 501 5,382
Device Routing Invert Outlet Devices
#1 Primary 5,261.00'15.0" x 85.0' long Culvert CPP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,251.00' S= 0.1176 '/' Cc= 0.900 n= 0.012
#2 Primary 5,267.00'4.0' long (Profile 9) Broad-Crested Rectangular Weir
Head (feet) 1.97 2.46 2.95 3.94 4.92
Coef. (English) 3.55 3.55 3.57 3.60 3.66
Primary OutFlow Max=10.61 cfs @ 12.71 hrs HW=5,266.79' TW=5,201.45' (Dynamic Tailwater)
1=Culvert (Inlet Controls 10.61 cfs @ 8.64 fps)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 45HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Pond 14P: West Pond
Inflow
Primary
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=95.881 ac
Peak Elev=5,266.79'
Storage=4,481 cf
12.79 cfs
10.61 cfs
Drainage Report
APPENDIX E
Structure Capacity Calculations
FlowMaster v5.1507/15/08
Page 1 of 1 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-166603:31:09 PM
Worksheet for Trapezoidal Channel
Dam Spillway
Project Description
Project File l:\bd0jtp~b\1xxykc~e\h1vr30~i\103.fm2
Worksheet Dam weir
Flow Element Trapezoidal Channel
Method Manning's Formula
Solve For Discharge
Input Data
Mannings Coefficient 0.030
Channel Slope 2.0000 %
Depth 1.00 ft
Left Side Slope 2.000000 H : V
Right Side Slope 2.000000 H : V
Bottom Width 4.00 ft
Results
Discharge 33.39 cfs
Flow Area 6.00 ft²
Wetted Perimeter 8.47 ft
Top Width 8.00 ft
Critical Depth 1.07 ft
Critical Slope 0.015318 ft/ft
Velocity 5.57 ft/s
Velocity Head 0.48 ft
Specific Energy 1.48 ft
Froude Number 1.13
Flow is supercritical.
07/15/08 FlowMaster v5.15
Page 1 of 1 03:31:49 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Dam Spillway channel
Worksheet for Trapezoidal Channel
Project Description
Project File l:\bd0jtp~b\1xxykc~e\h1vr30~i\103.fm2
Worksheet Dam spillways
Flow Element Trapezoidal Channel
Method Manning's Formula
Solve For Discharge
Input Data
Mannings Coefficient 0.030
Channel Slope 3.000000 H : V
Depth 1.00 ft
Left Side Slope 2.000000 H : V
Right Side Slope 2.000000 H : V
Bottom Width 4.00 ft
Results
Discharge 136.32 cfs
Flow Area 6.00 ft²
Wetted Perimeter 8.47 ft
Top Width 8.00 ft
Critical Depth 2.29 ft
Critical Slope 0.012747 ft/ft
Velocity 22.72 ft/s
Velocity Head 8.02 ft
Specific Energy 9.02 ft
Froude Number 4.63
Flow is supercritical.
Page 1 of 1
FlowMaster v5.15
03:33:53 PM
07/15/08
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Swale
Worksheet for Triangular Channel
Project Description
Project File l:\bd0jtp~b\1xxykc~e\h1vr30~i\103.fm2
Worksheet triangular channel
Flow Element Triangular Channel
Method Manning's Formula
Solve For Discharge
Input Data
Mannings Coefficient 0.035
Channel Slope 5.2800 %
Depth 1.00 ft
Left Side Slope 2.000000 H : V
Right Side Slope 2.000000 H : V
Results
Discharge 11.41 cfs
Flow Area 2.00 ft²
Wetted Perimeter 4.47 ft
Top Width 4.00 ft
Critical Depth 1.15 ft
Critical Slope 0.024899 ft/ft
Velocity 5.70 ft/s
Velocity Head 0.51 ft
Specific Energy 1.51 ft
Froude Number 1.42
Flow is supercritical.
03:33:20 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
07/15/08
Page 1 of 1
FlowMaster v5.15
Existing 48" culvert
Worksheet for Circular Channel
Project Description
Project File l:\bd0jtp~b\1xxykc~e\h1vr30~i\103.fm2
Worksheet Existing 48" Culvert
Flow Element Circular Channel
Method Manning's Formula
Solve For Discharge
Input Data
Mannings Coefficient 0.024
Channel Slope 0.125000 ft/ft
Depth 4.00 ft
Diameter 48.00 in
Results
Discharge 275.07 cfs
Flow Area 12.57 ft²
Wetted Perimeter 12.57 ft
Top Width 0.00 ft
Critical Depth 3.96 ft
Percent Full 100.00
Critical Slope 0.114676 ft/ft
Velocity 21.89 ft/s
Velocity Head 7.45 ft
Specific Energy FULL ft
Froude Number FULL
Maximum Discharge 295.90 cfs
Full Flow Capacity 275.07 cfs
Full Flow Slope 0.125000 ft/ft
FlowMaster v5.15
03:32:24 PM Page 1 of 1
07/15/08
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Worksheet for Triangular Channel
Existing Road Ditch
Project Description
Project File l:\bd0jtp~b\1xxykc~e\h1vr30~i\103.fm2
Worksheet Gas road ditch
Flow Element Triangular Channel
Method Manning's Formula
Solve For Discharge
Input Data
Mannings Coefficient 0.035
Channel Slope 7.0000 %
Depth 1.00 ft
Left Side Slope 2.000000 H : V
Right Side Slope 2.000000 H : V
Results
Discharge 13.14 cfs
Flow Area 2.00 ft²
Wetted Perimeter 4.47 ft
Top Width 4.00 ft
Critical Depth 1.22 ft
Critical Slope 0.024436 ft/ft
Velocity 6.57 ft/s
Velocity Head 0.67 ft
Specific Energy 1.67 ft
Froude Number 1.64
Flow is supercritical.
High Mesa RV Park
Garfield County, Colorado
DRAINAGE REPORT
— ADDENDUM —
February 20, 2009
Prepared for:
Bob Graham
Ridge Partners, LLC
1860 Lousetown Road
Reno, NV 89521
Engineer:
Christopher Furman, P.E.
Bell Consulting LLC
P.O. Box 8
Rifle, CO 81650
970/625- 9313
High Mesa RV Park, Drainage Report - 1 -
June 20, 2008
Contents
introduction
DESCRIPTION
BASINS
METHODOLOGY
Off site impacts
conclusions
Drainage Report Addendum #1
APPENDIX A
Off Site Hydrology Calculations
High Mesa RV Park, Drainage Report - 2 -
June 20, 2008
February 20, 2009
Bob Graham
Ridge Partners, LLC
1860 Lousetown Road
Reno, NV 89521
RE: Drainage Report Addendum – High Mesa RV Park, Near Battlement Mesa, CO
Mr. Graham,
INTRODUCTION
Bell Consulting LLC. has prepared the following Drainage Report Addendum for the High
Mesa RV Park located within Garfield County, near the Communities of Battlement Mesa
and Parachute, Colorado. This report is intended to supplement the Drainage Report prepared
previously for the High Mesa RV Park. The purpose of this addendum is to evaluate offsite
drainage impacts to the private access road serving the RV Park from County Road 300 aka.
Stone Quarry Road. The access road has been previously constructed as a gravel road and
Bell Consulting LLC is performing an evaluation, and redesign if and where necessary, of the
road with respect to road geometry and drainage.
DESCRIPTION
The access road serves the RV Park from the west and is located on the north facing slope
below High Mesa. The grades of the existing surface generally range from about 12% to
20%. The site vegetation is predominantly sage brush and similar plants with Piñon -Juniper
forested areas with grassy understory and good coverage.
BASINS
The designation of basin boundaries is shown on the map provided. The off-site area was
divided into five basins utilizing USGS topographic quadrangle maps to delineate the basin
boundaries and flow patterns. The area up-gradient of the access road was delineated into 4
basins for the analysis. The three easterly basins abut the access road where culverts were
previously constructed. The topography of the site is such that there are many small gullies
running roughly parallel to what we have considered the major basins in the evaluation.
During the construction of the access road culverts were provided for the minor gullies as
well.
METHODOLOGY
The peak runoff flows for the analysis were determined with the HydroCAD computer
program using the methodology given in the Soil Conservation Service’s “Technical Release
No. 20, Urban Hydrology.” Design criteria established by Garfield County require that peak
runoff flows be analyzed assuming a 100-year frequency storm event. The 100-year, 24-hour
precipitation event was estimated to be 2.63 inches. The 2-year, 24-hour precipitation event
was estimated at 1.16-inches. These data were collected from the online National Weather
High Mesa RV Park, Drainage Report - 3 -
June 20, 2008
Service NOAA Atlas 2 interactive program for the 2-year and 100-year data for the subject
site, see appendix.
The NRCS/SCS soils mapping lists the soils in the area primarily in the Hydrologic Group B
with areas of Group D soils within the off-site basins. The type of ground cover as well as
density also affects the runoff volume from a site. The off-site areas consist primarily of a mix
if sagebrush and related vegetation with Piñon -Juniper forest of fair to good coverage.
The curve numbers used have been selected from the standard curve number table, included in
the HydroCAD program. The actual values used are included in the appendices in the
HydroCAD output. Calculations provided herein and the design of the infrastructure is based
upon the 100-year storm event. The design of the proposed storm drainage piping has the
capacity for 100-year event flows.
The site was analyzed for the up-gradient existing conditions to determine the potential
impacts to the access road with respect to rates of runoff flows.
OFF SITE IMPACTS
The four basins contribute run-off flows to the access road from the south. The majority of
the subject area gently slopes to the north northwest with no signs of recent flooding.
Flows from the off-site basins will be mostly intercepted by the improved gravel access road
and directed via road side ditch to existing Corrugated Metal Pipe (CMP) culverts under the
road then within natural existing gullies to the drainage which roughly runs along County
Road 300. The flows ultimately contribute to the Colorado River which is about two-thirds of
a mile to the northwest.
Following is a table indicating peak flows from the pre-developed and offsite basins.
Pre-developed Runoff
BASIN AREA
(acres)
CN Peak Runoff (cfs)
100 year
AR6 57.15 66 23.28
AR7 150.8 60 11.48
AR8 52.76 65 13.10
AR9 160.8 60 22.03
The offsite flows will be directed as follows: Basin AR6 flows are diverted by the existing
improved gravel access road via the road side ditch to existing 36-inch and 48-inch CMP
culverts. Basin AR7 flows are diverted by the existing improved gravel access road via the
road side ditch to existing 24-inch, 36-inch and 72-inch CMP culverts. Basin AR8 flows are
diverted by the existing improved gravel access road via the road side ditch to an existing 72-
inch CMP culvert. The culverts discharge to existing gullies which will remain. The flows
will then continue in the natural gullies, eventually flowing to the Colorado River. Basin AR9
High Mesa RV Park, Drainage Report - 4 -
June 20, 2008
flows do not directly impact the existing access road and flow in natural channels to County
Road 300 to an existing 30-inch CMP culvert.
CONCLUSIONS
The storm drainage analysis provides calculations indicating that the existing gravel access
road drainage structures are sufficient and meets the County’s design guidelines.
If you have any questions, please do not hesitate to call 970-625-9313.
Sincerely,
Chris Furman, P.E.
Encl: Figures, Appendices
L:\BC-jobfiles\103-RV Park\Hydrology - Drainage\Drainage Report\Drainage Report-103 addendum.docx
High Mesa RV Park, Drainage Report - 2 -
June 20, 2008
February 20, 2009
Bob Graham
Ridge Partners, LLC
1860 Lousetown Road
Reno, NV 89521
RE: Drainage Report Addendum – High Mesa RV Park, Near Battlement Mesa, CO
Mr. Graham,
INTRODUCTION
Bell Consulting LLC. has prepared the following Drainage Report Addendum for the High
Mesa RV Park located within Garfield County, near the Communities of Battlement Mesa
and Parachute, Colorado. This report is intended to supplement the Drainage Report prepared
previously for the High Mesa RV Park. The purpose of this addendum is to evaluate offsite
drainage impacts to the private access road serving the RV Park from County Road 300 aka.
Stone Quarry Road. The access road has been previously constructed as a gravel road and
Bell Consulting LLC is performing an evaluation, and redesign if and where necessary, of the
road with respect to road geometry and drainage.
DESCRIPTION
The access road serves the RV Park from the west and is located on the north facing slope
below High Mesa. The grades of the existing surface generally range from about 12% to
20%. The site vegetation is predominantly sage brush and similar plants with Piñon -Juniper
forested areas with grassy understory and good coverage.
BASINS
The designation of basin boundaries is shown on the map provided. The off-site area was
divided into five basins utilizing USGS topographic quadrangle maps to delineate the basin
boundaries and flow patterns. The area up-gradient of the access road was delineated into 4
basins for the analysis. The three easterly basins abut the access road where culverts were
previously constructed. The topography of the site is such that there are many small gullies
running roughly parallel to what we have considered the major basins in the evaluation.
During the construction of the access road culverts were provided for the minor gullies as
well.
METHODOLOGY
The peak runoff flows for the analysis were determined with the HydroCAD computer
program using the methodology given in the Soil Conservation Service’s “Technical Release
No. 20, Urban Hydrology.” Design criteria established by Garfield County require that peak
runoff flows be analyzed assuming a 100-year frequency storm event. The 100-year, 24-hour
precipitation event was estimated to be 2.63 inches. The 2-year, 24-hour precipitation event
was estimated at 1.16-inches. These data were collected from the online National Weather
Drainage Report Addendum #1
APPENDIX A
Off Site Hydrology Calculations
AR6
Access Road
AR7
Access Road
AR8
Access Road
AR9
Access Road
2PCB
36" Culvert
6PCB
24" Culvert
7PCB
72" Culvert
8PCB
30" Culvert
Drainage Diagram for 103 for Access RoadPrepared by Bell Consulting LLC, Printed 2/23/2009
HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
103 for Access Road
Printed 2/23/2009Prepared by Bell Consulting LLC
Page 2HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
(acres)
CN Description
(subcatchment-numbers)
143.503 51 Sagebrush range, Fair, HSG B (AR6,AR7,AR8,AR9)
160.162 58 Pinyon/juniper range, Fair, HSG B (AR7,AR8,AR9)
14.840 68 Desert shrub range, Good, HSG B (AR6)
1.629 70 Sagebrush range, Fair, HSG D (AR6,AR7)
101.432 80 Pinyon/juniper range, Fair, HSG D (AR6,AR7,AR8,AR9)
421.566 TOTAL AREA
103 for Access Road
Printed 2/23/2009Prepared by Bell Consulting LLC
Page 3HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area
(acres)
Soil
Goup
Subcatchment
Numbers
0.000 HSG A
318.505 HSG B AR6, AR7, AR8, AR9
0.000 HSG C
103.061 HSG D AR6, AR7, AR8, AR9
0.000 Other
421.566 TOTAL AREA
Type II 24-hr 100-yr Rainfall=2.63"103 for Access Road
Printed 2/23/2009Prepared by Bell Consulting LLC
Page 4HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Time span=5.00-36.00 hrs, dt=0.01 hrs, 3101 points x 3
Runoff by SCS TR-20 method, UH=SCS
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Runoff Area=57.154 ac 0.00% Impervious Runoff Depth=0.38"Subcatchment AR6: Access Road
Flow Length=5,321' Tc=11.6 min CN=66 Runoff=23.28 cfs 1.805 af
Runoff Area=150.815 ac 0.00% Impervious Runoff Depth=0.21"Subcatchment AR7: Access Road
Flow Length=7,812' Tc=27.3 min CN=60 Runoff=11.48 cfs 2.654 af
Runoff Area=52.758 ac 0.00% Impervious Runoff Depth=0.35"Subcatchment AR8: Access Road
Flow Length=5,082' Tc=19.8 min CN=65 Runoff=13.10 cfs 1.529 af
Runoff Area=160.839 ac 0.00% Impervious Runoff Depth=0.21"Subcatchment AR9: Access Road
Flow Length=5,353' Tc=10.7 min CN=60 Runoff=22.03 cfs 2.830 af
Peak Elev=5,299.14' Inflow=23.28 cfs 1.805 afPond 2P: 36" Culvert
36.0" x 66.7' Culvert Outflow=23.28 cfs 1.805 af
Peak Elev=5,257.30' Inflow=11.48 cfs 2.654 afPond 6P: 24" Culvert
24.0" x 72.3' Culvert Outflow=11.48 cfs 2.654 af
Peak Elev=5,219.26' Inflow=13.10 cfs 1.529 afPond 7P: 72" Culvert
72.0" x 50.0' Culvert Outflow=13.10 cfs 1.529 af
Peak Elev=5,085.64' Inflow=22.03 cfs 2.830 afPond 8P: 30" Culvert
30.0" x 50.0' Culvert Outflow=22.03 cfs 2.830 af
Total Runoff Area = 421.566 ac Runoff Volume = 8.817 af Average Runoff Depth = 0.25"
100.00% Pervious = 421.566 ac 0.00% Impervious = 0.000 ac
Type II 24-hr 100-yr Rainfall=2.63"103 for Access Road
Printed 2/23/2009Prepared by Bell Consulting LLC
Page 5HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment AR6: Access Road
Runoff = 23.28 cfs @ 12.06 hrs, Volume= 1.805 af, Depth= 0.38"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
14.840 68 Desert shrub range, Good, HSG B
20.270 80 Pinyon/juniper range, Fair, HSG D
21.987 51 Sagebrush range, Fair, HSG B
0.057 70 Sagebrush range, Fair, HSG D
57.154 66 Weighted Average
57.154 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
2.7 25 0.0800 0.15 Sheet Flow,
Range n= 0.130 P2= 1.16"
3.6 355 0.1069 1.63 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
5.3 4,941 0.1983 15.42 30.83 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44'
n= 0.025 Earth, clean & winding
11.6 5,321 Total
Subcatchment AR6: Access Road
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=57.154 ac
Runoff Volume=1.805 af
Runoff Depth=0.38"
Flow Length=5,321'
Tc=11.6 min
CN=66
23.28 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 for Access Road
Printed 2/23/2009Prepared by Bell Consulting LLC
Page 6HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment AR7: Access Road
Runoff = 11.48 cfs @ 12.35 hrs, Volume= 2.654 af, Depth= 0.21"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
59.199 58 Pinyon/juniper range, Fair, HSG B
29.863 80 Pinyon/juniper range, Fair, HSG D
60.181 51 Sagebrush range, Fair, HSG B
1.572 70 Sagebrush range, Fair, HSG D
150.815 60 Weighted Average
150.815 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
2.3 25 0.1200 0.18 Sheet Flow,
Range n= 0.130 P2= 1.16"
17.8 1,603 0.0905 1.50 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
7.2 6,184 0.1714 14.33 28.66 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
27.3 7,812 Total
Subcatchment AR7: Access Road
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
12
11
10
9
8
7
6
5
4
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=150.815 ac
Runoff Volume=2.654 af
Runoff Depth=0.21"
Flow Length=7,812'
Tc=27.3 min
CN=60
11.48 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 for Access Road
Printed 2/23/2009Prepared by Bell Consulting LLC
Page 7HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment AR8: Access Road
Runoff = 13.10 cfs @ 12.17 hrs, Volume= 1.529 af, Depth= 0.35"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
22.907 58 Pinyon/juniper range, Fair, HSG B
19.920 80 Pinyon/juniper range, Fair, HSG D
9.931 51 Sagebrush range, Fair, HSG B
52.758 65 Weighted Average
52.758 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
2.7 25 0.0800 0.15 Sheet Flow,
Range n= 0.130 P2= 1.16"
13.1 1,219 0.0968 1.56 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
4.0 3,838 0.2137 16.00 32.01 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
19.8 5,082 Total
Subcatchment AR8: Access Road
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=52.758 ac
Runoff Volume=1.529 af
Runoff Depth=0.35"
Flow Length=5,082'
Tc=19.8 min
CN=65
13.10 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 for Access Road
Printed 2/23/2009Prepared by Bell Consulting LLC
Page 8HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment AR9: Access Road
Runoff = 22.03 cfs @ 12.08 hrs, Volume= 2.830 af, Depth= 0.21"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
78.056 58 Pinyon/juniper range, Fair, HSG B
31.379 80 Pinyon/juniper range, Fair, HSG D
51.404 51 Sagebrush range, Fair, HSG B
160.839 60 Weighted Average
160.839 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.9 25 0.2000 0.22 Sheet Flow,
Range n= 0.130 P2= 1.16"
3.3 379 0.1449 1.90 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
5.5 4,949 0.1859 14.93 29.85 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
10.7 5,353 Total
Subcatchment AR9: Access Road
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=160.839 ac
Runoff Volume=2.830 af
Runoff Depth=0.21"
Flow Length=5,353'
Tc=10.7 min
CN=60
22.03 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 for Access Road
Printed 2/23/2009Prepared by Bell Consulting LLC
Page 9HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 2P: 36" Culvert
Inflow Area = 57.154 ac, 0.00% Impervious, Inflow Depth = 0.38" for 100-yr event
Inflow = 23.28 cfs @ 12.06 hrs, Volume= 1.805 af
Outflow = 23.28 cfs @ 12.06 hrs, Volume= 1.805 af, Atten= 0%, Lag= 0.0 min
Primary = 23.28 cfs @ 12.06 hrs, Volume= 1.805 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,299.14' @ 12.06 hrs
Flood Elev= 5,300.00'
Device Routing Invert Outlet Devices
#1 Primary 5,296.87'36.0" x 66.7' long Culvert CMP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,294.77' S= 0.0315 '/' Cc= 0.900
n= 0.025 Corrugated metal
Primary OutFlow Max=23.25 cfs @ 12.06 hrs HW=5,299.14' (Free Discharge)
1=Culvert (Inlet Controls 23.25 cfs @ 4.05 fps)
Pond 2P: 36" Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
26
24
22
20
18
16
14
12
10
8
6
4
2
0
Inflow Area=57.154 ac
Peak Elev=5,299.14'
36.0" x 66.7' Culvert
23.28 cfs23.28 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 for Access Road
Printed 2/23/2009Prepared by Bell Consulting LLC
Page 10HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 6P: 24" Culvert
Inflow Area = 150.815 ac, 0.00% Impervious, Inflow Depth = 0.21" for 100-yr event
Inflow = 11.48 cfs @ 12.35 hrs, Volume= 2.654 af
Outflow = 11.48 cfs @ 12.35 hrs, Volume= 2.654 af, Atten= 0%, Lag= 0.0 min
Primary = 11.48 cfs @ 12.35 hrs, Volume= 2.654 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,257.30' @ 12.35 hrs
Flood Elev= 5,265.76'
Device Routing Invert Outlet Devices
#1 Primary 5,255.39'24.0" x 72.3' long Culvert CMP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,250.15' S= 0.0725 '/' Cc= 0.900
n= 0.025 Corrugated metal
Primary OutFlow Max=11.47 cfs @ 12.35 hrs HW=5,257.30' (Free Discharge)
1=Culvert (Inlet Controls 11.47 cfs @ 3.71 fps)
Pond 6P: 24" Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=150.815 ac
Peak Elev=5,257.30'
24.0" x 72.3' Culvert
11.48 cfs11.48 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 for Access Road
Printed 2/23/2009Prepared by Bell Consulting LLC
Page 11HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 7P: 72" Culvert
Inflow Area = 52.758 ac, 0.00% Impervious, Inflow Depth = 0.35" for 100-yr event
Inflow = 13.10 cfs @ 12.17 hrs, Volume= 1.529 af
Outflow = 13.10 cfs @ 12.17 hrs, Volume= 1.529 af, Atten= 0%, Lag= 0.0 min
Primary = 13.10 cfs @ 12.17 hrs, Volume= 1.529 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,219.26' @ 12.17 hrs
Flood Elev= 5,223.00'
Device Routing Invert Outlet Devices
#1 Primary 5,218.00'72.0" x 50.0' long Culvert CMP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,215.50' S= 0.0500 '/' Cc= 0.900
n= 0.025 Corrugated metal
Primary OutFlow Max=13.09 cfs @ 12.17 hrs HW=5,219.26' (Free Discharge)
1=Culvert (Inlet Controls 13.09 cfs @ 3.02 fps)
Pond 7P: 72" Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=52.758 ac
Peak Elev=5,219.26'
72.0" x 50.0' Culvert
13.10 cfs13.10 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 for Access Road
Printed 2/23/2009Prepared by Bell Consulting LLC
Page 12HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 8P: 30" Culvert
Inflow Area = 160.839 ac, 0.00% Impervious, Inflow Depth = 0.21" for 100-yr event
Inflow = 22.03 cfs @ 12.08 hrs, Volume= 2.830 af
Outflow = 22.03 cfs @ 12.08 hrs, Volume= 2.830 af, Atten= 0%, Lag= 0.0 min
Primary = 22.03 cfs @ 12.08 hrs, Volume= 2.830 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,085.64' @ 12.08 hrs
Flood Elev= 5,093.00'
Device Routing Invert Outlet Devices
#1 Primary 5,083.00'30.0" x 50.0' long Culvert CMP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,080.50' S= 0.0500 '/' Cc= 0.900
n= 0.025 Corrugated metal
Primary OutFlow Max=22.01 cfs @ 12.08 hrs HW=5,085.64' (Free Discharge)
1=Culvert (Inlet Controls 22.01 cfs @ 4.48 fps)
Pond 8P: 30" Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=160.839 ac
Peak Elev=5,085.64'
30.0" x 50.0' Culvert
22.03 cfs22.03 cfs
High Mesa RV Park
Garfield County, Colorado
DRAINAGE REPORT
— ADDENDUM #2—
February 20, 2009
Prepared for:
Bob Graham
Ridge Partners, LLC
1860 Lousetown Road
Reno, NV 89521
Engineer:
Christopher Furman, P.E.
Bell Consulting LLC
P.O. Box 8
Rifle, CO 81650
970/625- 9313
High Mesa RV Park, Drainage Report Addendum #2 - 1 -
June 24, 2008
Contents
introduction
DESCRIPTION
conclusions
Drainage Report Addendum #2
APPENDIX A
Hydrology Calculations
High Mesa RV Park, Drainage Report Addendum #2 - 2 -
June 24, 2008
June 24, 2009
Bob Graham
Ridge Partners, LLC
1860 Lousetown Road
Reno, NV 89521
RE: Drainage Report Addendum #2 – High Mesa RV Park, Near Battlement Mesa, CO
Mr. Graham,
INTRODUCTION
Bell Consulting LLC. has prepared the following Drainage Report Addendum for the High
Mesa RV Park located within Garfield County, near the Communities of Battlement Mesa
and Parachute, Colorado. This report is intended to supplement the Drainage Reports prepared
previously for the High Mesa RV Park. The purpose of this addendum is to evaluate offsite
drainage impacts to the private emergency access road serving the RV Park from County
Road 300 aka. Stone Quarry Road. The emergency access road is mostly located in the valley
floor of the unnamed drainage down gradient and north of the RV Park property. The
emergency road then joins the sewer access road near the proposed sewer plant location and
traverses the valley slope and connects to the internal road network of the RV Park.
DESCRIPTION
The emergency road serves the RV Park from the west. The emergency road was designed to
closely follow the existing topography of the valley floor with grades up to 8-percent. After
joining the sewer plant access road, grades increase to 10-percent for a short distance as the
road climbs out of the valley floor. Culverts have been designed at several locations along the
road. The culverts were sized for 100-year flows or at a minimum 18-inch diameter.
Due to the location of the additional emergency access road design, one of the previously
designed detention ponds was moved. The pond was moved up the same drainage as it was
located before approximately 50-feet. The size of the pond is roughly the same as before and
the same basin and runoff calculations were used.
Flows from the upstream basins will be mostly intercepted by the improved gravel emergency
road and directed via road side ditch to proposed ADS N-12 HDPE culverts under the road
and then within natural existing gullies to the existing drainage in the valley floor. The flows
ultimately contribute to the Colorado River which is about two-thirds of a mile to the
northwest.
There are 7 proposed culverts crossing the emergency access road. Three are 24-inch
diameter and four are 18-inch diameter. The 24-inch culverts are either upstream or
downstream of detention ponds and were oversized for debris. The other culverts have been
sized at 18-inches as a minimum for debris flow. Road side ditches are a minimum of 1-foot
in depth with 2:1 side slopes and are capable of carrying 100-year flows from the contributing
basins.
High Mesa RV Park, Drainage Report Addendum #2 - 3 -
June 24, 2008
CONCLUSIONS
Impacts from the inclusion of the emergency access road to the valley floor are minimal and
include a relocation of one of the proposed detention ponds and the inclusion of several
additional culverts crossing the road. Supporting calculations are included in this Appendix
A.
If you have any questions, please do not hesitate to call 970-625-9313.
Sincerely,
Chris Furman, P.E.
Encl: Figures, Appendices
L:\BC-jobfiles\103-RV Park\Hydrology - Drainage\Drainage Report\Drainage Report-103 addendum #2.docx
Drainage Report Addendum #2
APPENDIX A
Hydrology Calculations
06/23/09
09:31:08 AM
FlowMaster v5.15
Page 1 of 1 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
1.5% roadside ditch
Worksheet for Triangular Channel
Project Description
Project File l:\bd0jtp~b\1xxykc~e\h1vr30~i\roadside.fm2
Worksheet Roadside ditch
Flow Element Triangular Channel
Method Manning's Formula
Solve For Discharge
Input Data
Mannings Coefficient 0.022
Channel Slope 1.5000 %
Depth 1.00 ft
Left Side Slope 2.000000 H : V
Right Side Slope 2.000000 H : V
Results
Discharge 9.68 cfs
Flow Area 2.00 ft²
Wetted Perimeter 4.47 ft
Top Width 4.00 ft
Critical Depth 1.08 ft
Critical Slope 0.010057 ft/ft
Velocity 4.84 ft/s
Velocity Head 0.36 ft
Specific Energy 1.36 ft
Froude Number 1.21
Flow is supercritical.
FlowMaster v5.15
09:31:52 AM
06/23/09
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Worksheet for Triangular Channel
1.75% roadside ditch
Project Description
Project File l:\bd0jtp~b\1xxykc~e\h1vr30~i\roadside.fm2
Worksheet Roadside ditch
Flow Element Triangular Channel
Method Manning's Formula
Solve For Discharge
Input Data
Mannings Coefficient 0.022
Channel Slope 1.7500 %
Depth 1.00 ft
Left Side Slope 2.000000 H : V
Right Side Slope 2.000000 H : V
Results
Discharge 10.45 cfs
Flow Area 2.00 ft²
Wetted Perimeter 4.47 ft
Top Width 4.00 ft
Critical Depth 1.11 ft
Critical Slope 0.009954 ft/ft
Velocity 5.23 ft/s
Velocity Head 0.42 ft
Specific Energy 1.42 ft
Froude Number 1.30
Flow is supercritical.
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 6/17/2009Prepared by Bell Consulting LLC
Page 1HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 4P: North Pond
Inflow Area = 39.288 ac, 0.00% Impervious, Inflow Depth = 0.32" for 100-yr event
Inflow = 10.99 cfs @ 11.93 hrs, Volume= 1.033 af
Outflow = 10.24 cfs @ 11.95 hrs, Volume= 1.033 af, Atten= 7%, Lag= 1.4 min
Primary = 10.24 cfs @ 11.95 hrs, Volume= 1.033 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,225.20' @ 11.95 hrs Surf.Area= 466 sf Storage= 410 cf
Plug-Flow detention time= 0.3 min calculated for 1.033 af (100% of inflow)
Center-of-Mass det. time= 0.3 min ( 910.4 - 910.2 )
Volume Invert Avail.Storage Storage Description
#1 5,223.00' 1,890 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
5,223.00 4 0 0
5,224.00 126 65 65
5,225.00 394 260 325
5,226.00 759 577 902
5,227.00 1,217 988 1,890
Device Routing Invert Outlet Devices
#1 Primary 5,223.00'18.0" x 82.0' long Culvert
CPP, end-section conforming to fill, Ke= 0.500
Outlet Invert= 5,211.00' S= 0.1463 '/' Cc= 0.900 n= 0.012
#2 Primary 5,227.00'4.0' long (Profile 9) Broad-Crested Rectangular Weir
Head (feet) 1.97 2.46 2.95 3.94 4.92
Coef. (English) 3.55 3.55 3.57 3.60 3.66
Primary OutFlow Max=10.22 cfs @ 11.95 hrs HW=5,225.19' TW=5,201.46' (Dynamic Tailwater)
1=Culvert (Inlet Controls 10.22 cfs @ 5.78 fps)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 6/17/2009Prepared by Bell Consulting LLC
Page 2HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Pond 4P: North Pond
Inflow
Primary
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=39.288 ac
Peak Elev=5,225.20'
Storage=410 cf
10.99 cfs
10.24 cfs
Road culvert below North Pond
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 6/22/2009Prepared by Bell Consulting LLC
Page 1HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 16P: Culvert
Inflow Area = 39.288 ac, 0.00% Impervious, Inflow Depth = 0.32" for 100-yr event
Inflow = 10.24 cfs @ 11.95 hrs, Volume= 1.033 af
Outflow = 10.24 cfs @ 11.95 hrs, Volume= 1.033 af, Atten= 0%, Lag= 0.0 min
Primary = 10.24 cfs @ 11.95 hrs, Volume= 1.033 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,208.51' @ 11.95 hrs
Flood Elev= 5,210.84'
Device Routing Invert Outlet Devices
#1 Primary 5,207.00'24.0" x 23.0' long Culvert
CPP, end-section conforming to fill, Ke= 0.500
Outlet Invert= 5,206.54' S= 0.0200 '/' Cc= 0.900 n= 0.012
Primary OutFlow Max=10.22 cfs @ 11.95 hrs HW=5,208.51' TW=5,201.46' (Dynamic Tailwater)
1=Culvert (Barrel Controls 10.22 cfs @ 5.59 fps)
Pond 16P: Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=39.288 ac
Peak Elev=5,208.51'
24.0" x 23.0' Culvert
10.24 cfs10.24 cfs
Road culvert above east pond
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 6/22/2009Prepared by Bell Consulting LLC
Page 1HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 15P: Culvert
[62] Warning: Exceeded Reach 4R OUTLET depth by 0.94' @ 11.94 hrs
Inflow Area = 6.875 ac, 0.00% Impervious, Inflow Depth = 0.82" for 100-yr event
Inflow = 11.12 cfs @ 11.94 hrs, Volume= 0.470 af
Outflow = 11.12 cfs @ 11.94 hrs, Volume= 0.470 af, Atten= 0%, Lag= 0.0 min
Primary = 11.12 cfs @ 11.94 hrs, Volume= 0.470 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,226.10' @ 11.94 hrs
Flood Elev= 5,227.49'
Device Routing Invert Outlet Devices
#1 Primary 5,224.50'24.0" x 22.0' long Culvert
CPP, end-section conforming to fill, Ke= 0.500
Outlet Invert= 5,224.06' S= 0.0200 '/' Cc= 0.900 n= 0.012
Primary OutFlow Max=11.10 cfs @ 11.94 hrs HW=5,226.10' TW=5,212.93' (Dynamic Tailwater)
1=Culvert (Barrel Controls 11.10 cfs @ 5.64 fps)
Pond 15P: Culvert
Inflow
Primary
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=6.875 ac
Peak Elev=5,226.10'
24.0" x 22.0' Culvert
11.12 cfs11.12 cfs
APPENDIX D
Post-developed Hydrology Calculations
1
Pre-developed
2
Pre-developed
3
Pre-developed
4
Pre-developed
5
Pre-developed
A
Post-developed
B
Post-developed
C
Post-developed
D
Post-developed
E
Post-developed
F
Post-developed
G
Post-developed
H
Post-developed
I
Post-developed
J
Post-developed
2R
Ditch
4R
Gully
6R
Ditch
7R
Gully
8Pre
Gulley
8R
Ditch
9R
(new Reach)
10R
Gully
11R
Gully
NW Post
Northwest control point
1PCB
Culvert
3PCB
Culvert
4P
North Pond
5PCB
Culvert
6PreCB
Existing Culvert
7PCB
Culvert
7PreCB
Existing Culvert
9PCB
Culvert
10PCB
Culvert
13P
East Pond
14P
West Pond
Drainage Diagram for 103 Pre and Post-developedPrepared by {enter your company name here}, Printed 7/15/2008
HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 2HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
(acres)
CN Description
(subcatchment-numbers)
66.014 51 Sagebrush range, Fair, HSG B (1,2,3,4,5,A,E,G)
32.714 58 Pinyon/juniper range, Fair, HSG B (1,2,3,4,5)
2.358 69 50-75% Grass cover, Fair, HSG B (A,B,D,E,F,H,I)
2.041 70 Sagebrush range, Fair, HSG D (2,3,4,A,E)
60.601 80 Pinyon/juniper range, Fair, HSG D (1,2,3,4)
0.068 84 50-75% Grass cover, Fair, HSG D (A,E)
9.571 85 Gravel roads, HSG B (A,B,C,D,E,F,G,H,I,J)
173.367 TOTAL AREA
103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 3HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area
(acres)
Soil
Goup
Subcatchment
Numbers
0.000 HSG A
110.657 HSG B 1, 2, 3, 4, 5, A, B, C, D, E, F, G, H, I, J
0.000 HSG C
62.710 HSG D 1, 2, 3, 4, A, E
0.000 Other
173.367 TOTAL AREA
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 4HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Time span=5.00-36.00 hrs, dt=0.01 hrs, 3101 points x 3
Runoff by SCS TR-20 method, UH=SCS
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Runoff Area=82.075 ac 0.00% Impervious Runoff Depth=0.35"Subcatchment 1: Pre-developed
Flow Length=6,673' Tc=40.9 min CN=65 Runoff=12.33 cfs 2.378 af
Runoff Area=31.323 ac 0.00% Impervious Runoff Depth=0.52"Subcatchment 2: Pre-developed
Flow Length=4,077' Tc=15.2 min CN=70 Runoff=17.46 cfs 1.354 af
Runoff Area=4.944 ac 0.00% Impervious Runoff Depth=0.82"Subcatchment 3: Pre-developed
Flow Length=1,154' Tc=11.2 min CN=77 Runoff=5.82 cfs 0.339 af
Runoff Area=27.733 ac 0.00% Impervious Runoff Depth=0.13"Subcatchment 4: Pre-developed
Flow Length=1,430' Tc=10.9 min CN=56 Runoff=0.77 cfs 0.290 af
Runoff Area=11.747 ac 0.00% Impervious Runoff Depth=0.09"Subcatchment 5: Pre-developed
Flow Length=1,403' Tc=8.8 min CN=54 Runoff=0.16 cfs 0.089 af
Runoff Area=3.166 ac 0.00% Impervious Runoff Depth=0.48"Subcatchment A: Post-developed
Flow Length=1,172' Tc=2.5 min CN=69 Runoff=2.86 cfs 0.127 af
Runoff Area=2.135 ac 0.00% Impervious Runoff Depth=1.04"Subcatchment B: Post-developed
Flow Length=542' Tc=2.0 min CN=81 Runoff=4.62 cfs 0.184 af
Runoff Area=0.981 ac 0.00% Impervious Runoff Depth=1.28"Subcatchment C: Post-developed
Flow Length=409' Tc=2.0 min CN=85 Runoff=2.60 cfs 0.105 af
Runoff Area=0.593 ac 0.00% Impervious Runoff Depth=1.09"Subcatchment D: Post-developed
Flow Length=222' Tc=1.4 min CN=82 Runoff=1.38 cfs 0.054 af
Runoff Area=1.730 ac 0.00% Impervious Runoff Depth=0.64"Subcatchment E: Post-developed
Flow Length=487' Tc=1.4 min CN=73 Runoff=2.30 cfs 0.092 af
Runoff Area=1.725 ac 0.00% Impervious Runoff Depth=0.93"Subcatchment F: Post-developed
Flow Length=345' Tc=1.3 min CN=79 Runoff=3.42 cfs 0.133 af
Runoff Area=2.237 ac 0.00% Impervious Runoff Depth=0.48"Subcatchment G: Post-developed
Flow Length=532' Tc=1.5 min CN=69 Runoff=2.10 cfs 0.090 af
Runoff Area=0.919 ac 0.00% Impervious Runoff Depth=1.15"Subcatchment H: Post-developed
Flow Length=425' Tc=1.0 min CN=83 Runoff=2.28 cfs 0.088 af
Runoff Area=1.301 ac 0.00% Impervious Runoff Depth=0.87"Subcatchment I: Post-developed
Flow Length=379' Tc=1.7 min CN=78 Runoff=2.39 cfs 0.095 af
Runoff Area=0.758 ac 0.00% Impervious Runoff Depth=1.28"Subcatchment J: Post-developed
Flow Length=402' Tc=1.0 min CN=85 Runoff=2.08 cfs 0.081 af
Avg. Depth=0.63' Max Vel=5.73 fps Inflow=4.62 cfs 0.184 afReach 2R: Ditch
n=0.025 L=100.0' S=0.0500 '/' Capacity=98.71 cfs Outflow=4.60 cfs 0.184 af
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 5HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Avg. Depth=0.65' Max Vel=11.61 fps Inflow=9.99 cfs 0.416 afReach 4R: Gully
n=0.022 L=516.0' S=0.1531 '/' Capacity=196.28 cfs Outflow=9.83 cfs 0.416 af
Avg. Depth=0.55' Max Vel=8.99 fps Inflow=5.42 cfs 0.722 afReach 6R: Ditch
n=0.025 L=175.0' S=0.1486 '/' Capacity=170.15 cfs Outflow=5.42 cfs 0.722 af
Avg. Depth=0.44' Max Vel=6.65 fps Inflow=17.46 cfs 1.354 afReach 7R: Gully
n=0.022 L=900.0' S=0.0367 '/' Capacity=629.68 cfs Outflow=17.00 cfs 1.354 af
Avg. Depth=0.86' Max Vel=3.44 fps Inflow=6.23 cfs 0.630 afReach 8Pre: Gulley
n=0.022 L=1,300.0' S=0.0092 '/' Capacity=48.19 cfs Outflow=5.10 cfs 0.630 af
Avg. Depth=0.65' Max Vel=8.04 fps Inflow=6.96 cfs 0.855 afReach 8R: Ditch
n=0.025 L=380.0' S=0.0946 '/' Capacity=135.76 cfs Outflow=6.85 cfs 0.855 af
Inflow=12.49 cfs 2.467 afReach 9R: (new Reach)
Outflow=12.49 cfs 2.467 af
Avg. Depth=0.72' Max Vel=12.34 fps Inflow=12.79 cfs 2.643 afReach 10R: Gully
n=0.022 L=225.0' S=0.1511 '/' Capacity=195.00 cfs Outflow=12.79 cfs 2.643 af
Avg. Depth=0.44' Max Vel=3.45 fps Inflow=1.38 cfs 0.054 afReach 11R: Gully
n=0.022 L=220.0' S=0.0227 '/' Capacity=75.62 cfs Outflow=1.34 cfs 0.054 af
Avg. Depth=0.46' Max Vel=7.66 fps Inflow=14.55 cfs 4.145 afReach NW Post: Northwest control point
n=0.022 L=1,200.0' S=0.0508 '/' Capacity=1,101.08 cfs Outflow=13.80 cfs 4.145 af
Peak Elev=5,313.73' Inflow=4.62 cfs 0.184 afPond 1P: Culvert
18.0" x 27.1' Culvert Outflow=4.62 cfs 0.184 af
Peak Elev=5,307.40' Inflow=7.20 cfs 0.289 afPond 3P: Culvert
18.0" x 37.4' Culvert Outflow=7.20 cfs 0.289 af
Peak Elev=5,222.07' Storage=759 cf Inflow=10.99 cfs 1.033 afPond 4P: North Pond
Outflow=9.79 cfs 1.033 af
Peak Elev=5,349.32' Inflow=5.42 cfs 0.722 afPond 5P: Culvert
18.0" x 20.0' Culvert Outflow=5.42 cfs 0.722 af
Peak Elev=5,341.69' Inflow=12.33 cfs 2.378 afPond 6Pre: Existing Culvert
48.0" x 60.0' Culvert Outflow=12.33 cfs 2.378 af
Peak Elev=5,321.41' Inflow=6.96 cfs 0.855 afPond 7P: Culvert
18.0" x 20.0' Culvert Outflow=6.96 cfs 0.855 af
Peak Elev=5,366.50' Inflow=5.82 cfs 0.339 afPond 7Pre: Existing Culvert
18.0" x 60.0' Culvert Outflow=5.82 cfs 0.339 af
Peak Elev=5,281.51' Inflow=8.91 cfs 0.945 afPond 9P: Culvert
18.0" x 20.0' Culvert Outflow=8.91 cfs 0.945 af
Peak Elev=5,318.96' Inflow=12.66 cfs 2.562 afPond 10P: Culvert
18.0" x 70.0' Culvert Outflow=12.66 cfs 2.562 af
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 6HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Peak Elev=5,214.50' Storage=7,997 cf Inflow=11.14 cfs 0.470 afPond 13P: East Pond
Outflow=0.70 cfs 0.470 af
Peak Elev=5,266.79' Storage=4,481 cf Inflow=12.79 cfs 2.643 afPond 14P: West Pond
Outflow=10.61 cfs 2.642 af
Total Runoff Area = 173.367 ac Runoff Volume = 5.500 af Average Runoff Depth = 0.38"
100.00% Pervious = 173.367 ac 0.00% Impervious = 0.000 ac
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 7HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment 1: Pre-developed
Runoff = 12.33 cfs @ 12.50 hrs, Volume= 2.378 af, Depth= 0.35"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
7.142 58 Pinyon/juniper range, Fair, HSG B
36.491 80 Pinyon/juniper range, Fair, HSG D
38.442 51 Sagebrush range, Fair, HSG B
82.075 65 Weighted Average
82.075 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.8 25 0.0800 0.06 Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 1.16"
30.0 2,637 0.0857 1.46 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
4.1 4,011 0.2199 16.23 32.47 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44'
n= 0.025 Earth, clean & winding
40.9 6,673 Total
Subcatchment 1: Pre-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=82.075 ac
Runoff Volume=2.378 af
Runoff Depth=0.35"
Flow Length=6,673'
Tc=40.9 min
CN=65
12.33 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 8HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment 2: Pre-developed
Runoff = 17.46 cfs @ 12.10 hrs, Volume= 1.354 af, Depth= 0.52"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
6.476 58 Pinyon/juniper range, Fair, HSG B
19.005 80 Pinyon/juniper range, Fair, HSG D
5.170 51 Sagebrush range, Fair, HSG B
0.672 70 Sagebrush range, Fair, HSG D
31.323 70 Weighted Average
31.323 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.8 25 0.0800 0.06 Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 1.16"
5.0 568 0.1427 1.89 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
3.4 3,484 0.2402 16.97 33.93 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
15.2 4,077 Total
Subcatchment 2: Pre-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=31.323 ac
Runoff Volume=1.354 af
Runoff Depth=0.52"
Flow Length=4,077'
Tc=15.2 min
CN=70
17.46 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 9HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment 3: Pre-developed
Runoff = 5.82 cfs @ 12.04 hrs, Volume= 0.339 af, Depth= 0.82"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
0.382 58 Pinyon/juniper range, Fair, HSG B
4.139 80 Pinyon/juniper range, Fair, HSG D
0.236 51 Sagebrush range, Fair, HSG B
0.187 70 Sagebrush range, Fair, HSG D
4.944 77 Weighted Average
4.944 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
4.4 25 0.2400 0.10 Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 1.16"
6.2 835 0.2023 2.25 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
0.6 294 0.0510 7.82 15.64 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
11.2 1,154 Total
Subcatchment 3: Pre-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
6
5
4
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=4.944 ac
Runoff Volume=0.339 af
Runoff Depth=0.82"
Flow Length=1,154'
Tc=11.2 min
CN=77
5.82 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 10HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment 4: Pre-developed
Runoff = 0.77 cfs @ 12.14 hrs, Volume= 0.290 af, Depth= 0.13"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
13.635 58 Pinyon/juniper range, Fair, HSG B
0.966 80 Pinyon/juniper range, Fair, HSG D
12.912 51 Sagebrush range, Fair, HSG B
0.220 70 Sagebrush range, Fair, HSG D
27.733 56 Weighted Average
27.733 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
5.1 25 0.1600 0.08 Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 1.16"
4.7 555 0.1550 1.97 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
1.1 850 0.1317 12.56 25.13 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
10.9 1,430 Total
Subcatchment 4: Pre-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=27.733 ac
Runoff Volume=0.290 af
Runoff Depth=0.13"
Flow Length=1,430'
Tc=10.9 min
CN=56
0.77 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 11HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment 5: Pre-developed
Runoff = 0.16 cfs @ 12.47 hrs, Volume= 0.089 af, Depth= 0.09"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
5.079 58 Pinyon/juniper range, Fair, HSG B
6.668 51 Sagebrush range, Fair, HSG B
11.747 54 Weighted Average
11.747 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.8 25 0.0800 0.06 Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 1.16"
0.1 23 0.5109 3.57 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
1.9 1,355 0.1129 11.63 23.26 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
8.8 1,403 Total
Subcatchment 5: Pre-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=11.747 ac
Runoff Volume=0.089 af
Runoff Depth=0.09"
Flow Length=1,403'
Tc=8.8 min
CN=54
0.16 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 12HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment A: Post-developed
Runoff = 2.86 cfs @ 11.94 hrs, Volume= 0.127 af, Depth= 0.48"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
1.299 85 Gravel roads, HSG B
0.213 69 50-75% Grass cover, Fair, HSG B
0.030 84 50-75% Grass cover, Fair, HSG D
1.214 51 Sagebrush range, Fair, HSG B
0.410 70 Sagebrush range, Fair, HSG D
3.166 69 Weighted Average
3.166 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.3 25 0.1544 1.42 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.5 218 0.1941 7.09 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
1.7 929 0.0528 9.04 18.08 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44'
n= 0.022 Earth, clean & straight
2.5 1,172 Total
Subcatchment A: Post-developed
Runoff
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=3.166 ac
Runoff Volume=0.127 af
Runoff Depth=0.48"
Flow Length=1,172'
Tc=2.5 min
CN=69
2.86 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 13HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment B: Post-developed
Runoff = 4.62 cfs @ 11.93 hrs, Volume= 0.184 af, Depth= 1.04"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
1.550 85 Gravel roads, HSG B
0.585 69 50-75% Grass cover, Fair, HSG B
2.135 81 Weighted Average
2.135 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.6 25 0.0288 0.73 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.4 180 0.1867 6.96 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
1.0 337 0.0291 5.91 11.81 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44'
n= 0.025 Earth, clean & winding
2.0 542 Total
Subcatchment B: Post-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
5
4
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=2.135 ac
Runoff Volume=0.184 af
Runoff Depth=1.04"
Flow Length=542'
Tc=2.0 min
CN=81
4.62 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 14HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment C: Post-developed
Runoff = 2.60 cfs @ 11.93 hrs, Volume= 0.105 af, Depth= 1.28"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
0.981 85 Gravel roads, HSG B
0.981 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.7 25 0.0196 0.62 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.1 54 0.2497 8.05 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
1.2 330 0.0182 4.67 9.34 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
2.0 409 Total
Subcatchment C: Post-developed
Runoff
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=0.981 ac
Runoff Volume=0.105 af
Runoff Depth=1.28"
Flow Length=409'
Tc=2.0 min
CN=85
2.60 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 15HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment D: Post-developed
Runoff = 1.38 cfs @ 11.92 hrs, Volume= 0.054 af, Depth= 1.09"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
0.497 85 Gravel roads, HSG B
0.096 69 50-75% Grass cover, Fair, HSG B
0.593 82 Weighted Average
0.593 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.6 25 0.0312 0.75 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.2 85 0.1269 5.74 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
0.6 112 0.0074 2.98 5.96 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
1.4 222 Total
Subcatchment D: Post-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=0.593 ac
Runoff Volume=0.054 af
Runoff Depth=1.09"
Flow Length=222'
Tc=1.4 min
CN=82
1.38 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 16HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment E: Post-developed
Runoff = 2.30 cfs @ 11.92 hrs, Volume= 0.092 af, Depth= 0.64"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
0.727 85 Gravel roads, HSG B
0.089 69 50-75% Grass cover, Fair, HSG B
0.038 84 50-75% Grass cover, Fair, HSG D
0.324 51 Sagebrush range, Fair, HSG B
0.552 70 Sagebrush range, Fair, HSG D
1.730 73 Weighted Average
1.730 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.3 25 0.1524 1.41 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.5 210 0.1956 7.12 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
0.6 252 0.0374 6.69 13.39 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
1.4 487 Total
Subcatchment E: Post-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=1.730 ac
Runoff Volume=0.092 af
Runoff Depth=0.64"
Flow Length=487'
Tc=1.4 min
CN=73
2.30 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 17HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment F: Post-developed
Runoff = 3.42 cfs @ 11.92 hrs, Volume= 0.133 af, Depth= 0.93"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
1.060 85 Gravel roads, HSG B
0.665 69 50-75% Grass cover, Fair, HSG B
1.725 79 Weighted Average
1.725 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.6 25 0.0212 0.64 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.2 122 0.2585 8.19 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
0.5 198 0.0358 6.55 13.10 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
1.3 345 Total
Subcatchment F: Post-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
3
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=1.725 ac
Runoff Volume=0.133 af
Runoff Depth=0.93"
Flow Length=345'
Tc=1.3 min
CN=79
3.42 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 18HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment G: Post-developed
Runoff = 2.10 cfs @ 11.93 hrs, Volume= 0.090 af, Depth= 0.48"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
1.189 85 Gravel roads, HSG B
1.048 51 Sagebrush range, Fair, HSG B
2.237 69 Weighted Average
2.237 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.6 25 0.0216 0.65 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.1 47 0.3076 8.93 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
0.8 460 0.0710 9.22 18.45 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
1.5 532 Total
Subcatchment G: Post-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=2.237 ac
Runoff Volume=0.090 af
Runoff Depth=0.48"
Flow Length=532'
Tc=1.5 min
CN=69
2.10 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 19HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment H: Post-developed
[49] Hint: Tc<2dt may require smaller dt
Runoff = 2.28 cfs @ 11.91 hrs, Volume= 0.088 af, Depth= 1.15"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
0.777 85 Gravel roads, HSG B
0.142 69 50-75% Grass cover, Fair, HSG B
0.919 83 Weighted Average
0.919 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.3 25 0.1244 1.30 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.1 25 0.2092 7.36 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
0.6 375 0.1028 11.10 22.20 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
1.0 425 Total
Subcatchment H: Post-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=0.919 ac
Runoff Volume=0.088 af
Runoff Depth=1.15"
Flow Length=425'
Tc=1.0 min
CN=83
2.28 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 20HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment I: Post-developed
Runoff = 2.39 cfs @ 11.92 hrs, Volume= 0.095 af, Depth= 0.87"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
0.733 85 Gravel roads, HSG B
0.568 69 50-75% Grass cover, Fair, HSG B
1.301 78 Weighted Average
1.301 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.7 25 0.0200 0.63 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.2 110 0.2681 8.34 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
0.8 244 0.0194 4.82 9.64 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
1.7 379 Total
Subcatchment I: Post-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=1.301 ac
Runoff Volume=0.095 af
Runoff Depth=0.87"
Flow Length=379'
Tc=1.7 min
CN=78
2.39 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 21HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Subcatchment J: Post-developed
[49] Hint: Tc<2dt may require smaller dt
Runoff = 2.08 cfs @ 11.91 hrs, Volume= 0.081 af, Depth= 1.28"
Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-yr Rainfall=2.63"
Area (ac) CN Description
0.758 85 Gravel roads, HSG B
0.758 Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.3 25 0.2092 1.61 Sheet Flow,
Smooth surfaces n= 0.011 P2= 1.16"
0.1 25 0.1140 5.44 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
0.6 352 0.0790 9.73 19.46 Channel Flow,
Area= 2.0 sf Perim= 4.5' r= 0.44' n= 0.025
1.0 402 Total
Subcatchment J: Post-developed
Runoff
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
2
1
0
Type II 24-hr 100-yr
Rainfall=2.63"
Runoff Area=0.758 ac
Runoff Volume=0.081 af
Runoff Depth=1.28"
Flow Length=402'
Tc=1.0 min
CN=85
2.08 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 22HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 2R: Ditch
Inflow Area = 2.135 ac, 0.00% Impervious, Inflow Depth = 1.04" for 100-yr event
Inflow = 4.62 cfs @ 11.93 hrs, Volume= 0.184 af
Outflow = 4.60 cfs @ 11.93 hrs, Volume= 0.184 af, Atten= 0%, Lag= 0.2 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 5.73 fps, Min. Travel Time= 0.3 min
Avg. Velocity = 2.13 fps, Avg. Travel Time= 0.8 min
Peak Storage= 80 cf @ 11.93 hrs, Average Depth at Peak Storage= 0.63'
Bank-Full Depth= 2.00', Capacity at Bank-Full= 98.71 cfs
0.00' x 2.00' deep channel, n= 0.025
Side Slope Z-value= 2.0 '/' Top Width= 8.00'
Length= 100.0' Slope= 0.0500 '/'
Inlet Invert= 5,312.00', Outlet Invert= 5,307.00'
Reach 2R: Ditch
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
5
4
3
2
1
0
Inflow Area=2.135 ac
Avg. Depth=0.63'
Max Vel=5.73 fps
n=0.025
L=100.0'
S=0.0500 '/'
Capacity=98.71 cfs
4.62 cfs4.60 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 23HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 4R: Gully
Inflow Area = 6.282 ac, 0.00% Impervious, Inflow Depth = 0.80" for 100-yr event
Inflow = 9.99 cfs @ 11.93 hrs, Volume= 0.416 af
Outflow = 9.83 cfs @ 11.94 hrs, Volume= 0.416 af, Atten= 2%, Lag= 0.6 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 11.61 fps, Min. Travel Time= 0.7 min
Avg. Velocity = 4.15 fps, Avg. Travel Time= 2.1 min
Peak Storage= 437 cf @ 11.94 hrs, Average Depth at Peak Storage= 0.65'
Bank-Full Depth= 2.00', Capacity at Bank-Full= 196.28 cfs
0.00' x 2.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 2.0 '/' Top Width= 8.00'
Length= 516.0' Slope= 0.1531 '/'
Inlet Invert= 5,295.00', Outlet Invert= 5,216.00'
Reach 4R: Gully
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=6.282 ac
Avg. Depth=0.65'
Max Vel=11.61 fps
n=0.022
L=516.0'
S=0.1531 '/'
Capacity=196.28 cfs
9.99 cfs
9.83 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 24HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 6R: Ditch
Inflow Area = 34.407 ac, 0.00% Impervious, Inflow Depth = 0.25" for 100-yr event
Inflow = 5.42 cfs @ 12.11 hrs, Volume= 0.722 af
Outflow = 5.42 cfs @ 12.12 hrs, Volume= 0.722 af, Atten= 0%, Lag= 0.3 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 8.99 fps, Min. Travel Time= 0.3 min
Avg. Velocity = 4.11 fps, Avg. Travel Time= 0.7 min
Peak Storage= 106 cf @ 12.12 hrs, Average Depth at Peak Storage= 0.55'
Bank-Full Depth= 2.00', Capacity at Bank-Full= 170.15 cfs
0.00' x 2.00' deep channel, n= 0.025
Side Slope Z-value= 2.0 '/' Top Width= 8.00'
Length= 175.0' Slope= 0.1486 '/'
Inlet Invert= 5,347.00', Outlet Invert= 5,321.00'
Reach 6R: Ditch
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
6
5
4
3
2
1
0
Inflow Area=34.407 ac
Avg. Depth=0.55'
Max Vel=8.99 fps
n=0.025
L=175.0'
S=0.1486 '/'
Capacity=170.15 cfs
5.42 cfs5.42 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 25HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 7R: Gully
Inflow Area = 31.323 ac, 0.00% Impervious, Inflow Depth = 0.52" for 100-yr event
Inflow = 17.46 cfs @ 12.10 hrs, Volume= 1.354 af
Outflow = 17.00 cfs @ 12.12 hrs, Volume= 1.354 af, Atten= 3%, Lag= 1.5 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 6.65 fps, Min. Travel Time= 2.3 min
Avg. Velocity = 2.22 fps, Avg. Travel Time= 6.8 min
Peak Storage= 2,302 cf @ 12.12 hrs, Average Depth at Peak Storage= 0.44'
Bank-Full Depth= 3.00', Capacity at Bank-Full= 629.68 cfs
5.00' x 3.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 2.0 '/' Top Width= 17.00'
Length= 900.0' Slope= 0.0367 '/'
Inlet Invert= 5,235.00', Outlet Invert= 5,202.00'
Reach 7R: Gully
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=31.323 ac
Avg. Depth=0.44'
Max Vel=6.65 fps
n=0.022
L=900.0'
S=0.0367 '/'
Capacity=629.68 cfs
17.46 cfs
17.00 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 26HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 8Pre: Gulley
Inflow Area = 32.677 ac, 0.00% Impervious, Inflow Depth = 0.23" for 100-yr event
Inflow = 6.23 cfs @ 12.05 hrs, Volume= 0.630 af
Outflow = 5.10 cfs @ 12.11 hrs, Volume= 0.630 af, Atten= 18%, Lag= 3.8 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 3.44 fps, Min. Travel Time= 6.3 min
Avg. Velocity = 1.43 fps, Avg. Travel Time= 15.2 min
Peak Storage= 1,930 cf @ 12.11 hrs, Average Depth at Peak Storage= 0.86'
Bank-Full Depth= 2.00', Capacity at Bank-Full= 48.19 cfs
0.00' x 2.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 2.0 '/' Top Width= 8.00'
Length= 1,300.0' Slope= 0.0092 '/'
Inlet Invert= 5,361.00', Outlet Invert= 5,349.00'
Reach 8Pre: Gulley
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
6
5
4
3
2
1
0
Inflow Area=32.677 ac
Avg. Depth=0.86'
Max Vel=3.44 fps
n=0.022
L=1,300.0'
S=0.0092 '/'
Capacity=48.19 cfs
6.23 cfs
5.10 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 27HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 8R: Ditch
Inflow Area = 36.132 ac, 0.00% Impervious, Inflow Depth = 0.28" for 100-yr event
Inflow = 6.96 cfs @ 11.93 hrs, Volume= 0.855 af
Outflow = 6.85 cfs @ 11.94 hrs, Volume= 0.855 af, Atten= 2%, Lag= 0.7 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 8.04 fps, Min. Travel Time= 0.8 min
Avg. Velocity = 3.47 fps, Avg. Travel Time= 1.8 min
Peak Storage= 324 cf @ 11.94 hrs, Average Depth at Peak Storage= 0.65'
Bank-Full Depth= 2.00', Capacity at Bank-Full= 135.76 cfs
0.00' x 2.00' deep channel, n= 0.025
Side Slope Z-value= 2.0 '/' Top Width= 8.00'
Length= 380.0' Slope= 0.0946 '/'
Inlet Invert= 5,318.00', Outlet Invert= 5,282.06'
Reach 8R: Ditch
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
7
6
5
4
3
2
1
0
Inflow Area=36.132 ac
Avg. Depth=0.65'
Max Vel=8.04 fps
n=0.025
L=380.0'
S=0.0946 '/'
Capacity=135.76 cfs
6.96 cfs6.85 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 28HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 9R: (new Reach)
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 93.822 ac, 0.00% Impervious, Inflow Depth = 0.32" for 100-yr event
Inflow = 12.49 cfs @ 12.50 hrs, Volume= 2.467 af
Outflow = 12.49 cfs @ 12.50 hrs, Volume= 2.467 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Reach 9R: (new Reach)
InflowOutflow
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Flo
w
(
c
f
s
)
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=93.822 ac
12.49 cfs12.49 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 29HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 10R: Gully
Inflow Area = 95.881 ac, 0.00% Impervious, Inflow Depth = 0.33" for 100-yr event
Inflow = 12.79 cfs @ 12.50 hrs, Volume= 2.643 af
Outflow = 12.79 cfs @ 12.50 hrs, Volume= 2.643 af, Atten= 0%, Lag= 0.2 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 12.34 fps, Min. Travel Time= 0.3 min
Avg. Velocity = 6.35 fps, Avg. Travel Time= 0.6 min
Peak Storage= 233 cf @ 12.50 hrs, Average Depth at Peak Storage= 0.72'
Bank-Full Depth= 2.00', Capacity at Bank-Full= 195.00 cfs
0.00' x 2.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 2.0 '/' Top Width= 8.00'
Length= 225.0' Slope= 0.1511 '/'
Inlet Invert= 5,303.00', Outlet Invert= 5,269.00'
Reach 10R: Gully
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=95.881 ac
Avg. Depth=0.72'
Max Vel=12.34 fps
n=0.022
L=225.0'
S=0.1511 '/'
Capacity=195.00 cfs
12.79 cfs12.79 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 30HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach 11R: Gully
Inflow Area = 0.593 ac, 0.00% Impervious, Inflow Depth = 1.09" for 100-yr event
Inflow = 1.38 cfs @ 11.92 hrs, Volume= 0.054 af
Outflow = 1.34 cfs @ 11.93 hrs, Volume= 0.054 af, Atten= 3%, Lag= 0.7 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 3.45 fps, Min. Travel Time= 1.1 min
Avg. Velocity = 1.26 fps, Avg. Travel Time= 2.9 min
Peak Storage= 85 cf @ 11.93 hrs, Average Depth at Peak Storage= 0.44'
Bank-Full Depth= 2.00', Capacity at Bank-Full= 75.62 cfs
0.00' x 2.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 2.0 '/' Top Width= 8.00'
Length= 220.0' Slope= 0.0227 '/'
Inlet Invert= 5,300.00', Outlet Invert= 5,295.00'
Reach 11R: Gully
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
1
0
Inflow Area=0.593 ac
Avg. Depth=0.44'
Max Vel=3.45 fps
n=0.022
L=220.0'
S=0.0227 '/'
Capacity=75.62 cfs
1.38 cfs
1.34 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 31HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Reach NW Post: Northwest control point
Inflow Area = 142.044 ac, 0.00% Impervious, Inflow Depth = 0.35" for 100-yr event
Inflow = 14.55 cfs @ 11.95 hrs, Volume= 4.145 af
Outflow = 13.80 cfs @ 11.98 hrs, Volume= 4.145 af, Atten= 5%, Lag= 1.7 min
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Max. Velocity= 7.66 fps, Min. Travel Time= 2.6 min
Avg. Velocity = 3.75 fps, Avg. Travel Time= 5.3 min
Peak Storage= 2,161 cf @ 11.98 hrs, Average Depth at Peak Storage= 0.46'
Bank-Full Depth= 4.00', Capacity at Bank-Full= 1,101.08 cfs
3.00' x 4.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 2.0 '/' Top Width= 19.00'
Length= 1,200.0' Slope= 0.0508 '/'
Inlet Invert= 5,201.00', Outlet Invert= 5,140.00'
Reach NW Post: Northwest control point
InflowOutflow
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=142.044 ac
Avg. Depth=0.46'
Max Vel=7.66 fps
n=0.022
L=1,200.0'
S=0.0508 '/'
Capacity=1,101.08 cfs
14.55 cfs
13.80 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 32HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 1P: Culvert
Inflow Area = 2.135 ac, 0.00% Impervious, Inflow Depth = 1.04" for 100-yr event
Inflow = 4.62 cfs @ 11.93 hrs, Volume= 0.184 af
Outflow = 4.62 cfs @ 11.93 hrs, Volume= 0.184 af, Atten= 0%, Lag= 0.0 min
Primary = 4.62 cfs @ 11.93 hrs, Volume= 0.184 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,313.73' @ 11.93 hrs
Flood Elev= 5,315.50'
Device Routing Invert Outlet Devices
#1 Primary 5,312.50'18.0" x 27.1' long Culvert CPP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,312.10' S= 0.0148 '/' Cc= 0.900 n= 0.012
Primary OutFlow Max=4.60 cfs @ 11.93 hrs HW=5,313.73' TW=5,312.63' (Dynamic Tailwater)
1=Culvert (Inlet Controls 4.60 cfs @ 2.98 fps)
Pond 1P: Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
5
4
3
2
1
0
Inflow Area=2.135 ac
Peak Elev=5,313.73'
18.0" x 27.1' Culvert
4.62 cfs4.62 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 33HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 3P: Culvert
[61] Hint: Exceeded Reach 2R outlet invert by 0.40' @ 11.93 hrs
Inflow Area = 3.116 ac, 0.00% Impervious, Inflow Depth = 1.11" for 100-yr event
Inflow = 7.20 cfs @ 11.93 hrs, Volume= 0.289 af
Outflow = 7.20 cfs @ 11.93 hrs, Volume= 0.289 af, Atten= 0%, Lag= 0.0 min
Primary = 7.20 cfs @ 11.93 hrs, Volume= 0.289 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,307.40' @ 11.93 hrs
Flood Elev= 5,308.50'
Device Routing Invert Outlet Devices
#1 Primary 5,305.50'18.0" x 37.4' long Culvert CPP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,304.75' S= 0.0201 '/' Cc= 0.900 n= 0.012
Primary OutFlow Max=7.19 cfs @ 11.93 hrs HW=5,307.40' TW=5,295.64' (Dynamic Tailwater)
1=Culvert (Inlet Controls 7.19 cfs @ 4.07 fps)
Pond 3P: Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
8
7
6
5
4
3
2
1
0
Inflow Area=3.116 ac
Peak Elev=5,307.40'
18.0" x 37.4' Culvert
7.20 cfs7.20 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 34HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 4P: North Pond
Inflow Area = 39.288 ac, 0.00% Impervious, Inflow Depth = 0.32" for 100-yr event
Inflow = 10.99 cfs @ 11.93 hrs, Volume= 1.033 af
Outflow = 9.79 cfs @ 11.96 hrs, Volume= 1.033 af, Atten= 11%, Lag= 1.9 min
Primary = 9.79 cfs @ 11.96 hrs, Volume= 1.033 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,222.07' @ 11.96 hrs Surf.Area= 713 sf Storage= 759 cf
Plug-Flow detention time= 1.1 min calculated for 1.033 af (100% of inflow)
Center-of-Mass det. time= 1.1 min ( 911.2 - 910.2 )
Volume Invert Avail.Storage Storage Description
#1 5,220.00' 1,596 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
5,220.00 80 0 0
5,221.00 326 203 203
5,222.00 683 505 708
5,223.00 1,094 889 1,596
Device Routing Invert Outlet Devices
#1 Primary 5,220.00'18.0" x 95.0' long Culvert
CPP, end-section conforming to fill, Ke= 0.500
Outlet Invert= 5,209.00' S= 0.1158 '/' Cc= 0.900 n= 0.012
#2 Primary 5,223.00'4.0' long (Profile 9) Broad-Crested Rectangular Weir
Head (feet) 1.97 2.46 2.95 3.94 4.92
Coef. (English) 3.55 3.55 3.57 3.60 3.66
Primary OutFlow Max=9.79 cfs @ 11.96 hrs HW=5,222.07' TW=5,201.45' (Dynamic Tailwater)
1=Culvert (Inlet Controls 9.79 cfs @ 5.54 fps)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 35HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Pond 4P: North Pond
Inflow
Primary
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=39.288 ac
Peak Elev=5,222.07'
Storage=759 cf
10.99 cfs
9.79 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 36HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 5P: Culvert
[61] Hint: Exceeded Reach 8Pre outlet invert by 0.32' @ 12.11 hrs
Inflow Area = 34.407 ac, 0.00% Impervious, Inflow Depth = 0.25" for 100-yr event
Inflow = 5.42 cfs @ 12.11 hrs, Volume= 0.722 af
Outflow = 5.42 cfs @ 12.11 hrs, Volume= 0.722 af, Atten= 0%, Lag= 0.0 min
Primary = 5.42 cfs @ 12.11 hrs, Volume= 0.722 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,349.32' @ 12.11 hrs
Flood Elev= 5,350.43'
Device Routing Invert Outlet Devices
#1 Primary 5,347.93'18.0" x 20.0' long Culvert CPP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,347.53' S= 0.0200 '/' Cc= 0.900 n= 0.012
Primary OutFlow Max=5.42 cfs @ 12.11 hrs HW=5,349.32' TW=5,347.55' (Dynamic Tailwater)
1=Culvert (Inlet Controls 5.42 cfs @ 3.17 fps)
Pond 5P: Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
6
5
4
3
2
1
0
Inflow Area=34.407 ac
Peak Elev=5,349.32'
18.0" x 20.0' Culvert
5.42 cfs5.42 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 37HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 6Pre: Existing Culvert
Inflow Area = 82.075 ac, 0.00% Impervious, Inflow Depth = 0.35" for 100-yr event
Inflow = 12.33 cfs @ 12.50 hrs, Volume= 2.378 af
Outflow = 12.33 cfs @ 12.50 hrs, Volume= 2.378 af, Atten= 0%, Lag= 0.0 min
Primary = 12.33 cfs @ 12.50 hrs, Volume= 2.378 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,341.69' @ 12.50 hrs
Flood Elev= 5,646.33'
Device Routing Invert Outlet Devices
#1 Primary 5,340.30'48.0" x 60.0' long Culvert CMP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,332.80' S= 0.1250 '/' Cc= 0.900
n= 0.025 Corrugated metal
Primary OutFlow Max=12.33 cfs @ 12.50 hrs HW=5,341.69' TW=0.00' (Dynamic Tailwater)
1=Culvert (Inlet Controls 12.33 cfs @ 3.17 fps)
Pond 6Pre: Existing Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=82.075 ac
Peak Elev=5,341.69'
48.0" x 60.0' Culvert
12.33 cfs12.33 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 38HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 7P: Culvert
[61] Hint: Exceeded Reach 6R outlet invert by 0.41' @ 11.93 hrs
Inflow Area = 36.132 ac, 0.00% Impervious, Inflow Depth = 0.28" for 100-yr event
Inflow = 6.96 cfs @ 11.93 hrs, Volume= 0.855 af
Outflow = 6.96 cfs @ 11.93 hrs, Volume= 0.855 af, Atten= 0%, Lag= 0.0 min
Primary = 6.96 cfs @ 11.93 hrs, Volume= 0.855 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,321.41' @ 11.93 hrs
Flood Elev= 5,322.65'
Device Routing Invert Outlet Devices
#1 Primary 5,320.00'18.0" x 20.0' long Culvert
CPP, end-section conforming to fill, Ke= 0.500
Outlet Invert= 5,319.60' S= 0.0200 '/' Cc= 0.900 n= 0.012
Primary OutFlow Max=6.94 cfs @ 11.93 hrs HW=5,321.40' TW=5,318.65' (Dynamic Tailwater)
1=Culvert (Inlet Controls 6.94 cfs @ 4.04 fps)
Pond 7P: Culvert
InflowPrimary
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
7
6
5
4
3
2
1
0
Inflow Area=36.132 ac
Peak Elev=5,321.41'
18.0" x 20.0' Culvert
6.96 cfs6.96 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 39HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 7Pre: Existing Culvert
Inflow Area = 4.944 ac, 0.00% Impervious, Inflow Depth = 0.82" for 100-yr event
Inflow = 5.82 cfs @ 12.04 hrs, Volume= 0.339 af
Outflow = 5.82 cfs @ 12.04 hrs, Volume= 0.339 af, Atten= 0%, Lag= 0.0 min
Primary = 5.82 cfs @ 12.04 hrs, Volume= 0.339 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,366.50' @ 12.04 hrs
Flood Elev= 5,368.00'
Device Routing Invert Outlet Devices
#1 Primary 5,365.00'18.0" x 60.0' long insert CMP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,361.00' S= 0.0667 '/' Cc= 0.900
n= 0.025 Corrugated metal
Primary OutFlow Max=5.82 cfs @ 12.04 hrs HW=5,366.50' TW=5,361.79' (Dynamic Tailwater)
1=insert (Inlet Controls 5.82 cfs @ 3.29 fps)
Pond 7Pre: Existing Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
6
5
4
3
2
1
0
Inflow Area=4.944 ac
Peak Elev=5,366.50'
18.0" x 60.0' Culvert
5.82 cfs5.82 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 40HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 9P: Culvert
Inflow Area = 38.369 ac, 0.00% Impervious, Inflow Depth = 0.30" for 100-yr event
Inflow = 8.91 cfs @ 11.94 hrs, Volume= 0.945 af
Outflow = 8.91 cfs @ 11.94 hrs, Volume= 0.945 af, Atten= 0%, Lag= 0.0 min
Primary = 8.91 cfs @ 11.94 hrs, Volume= 0.945 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,281.51' @ 11.94 hrs
Flood Elev= 5,282.10'
Device Routing Invert Outlet Devices
#1 Primary 5,279.00'18.0" x 20.0' long Culvert CPP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,278.60' S= 0.0200 '/' Cc= 0.900 n= 0.012
Primary OutFlow Max=8.88 cfs @ 11.94 hrs HW=5,281.50' TW=5,221.96' (Dynamic Tailwater)
1=Culvert (Inlet Controls 8.88 cfs @ 5.03 fps)
Pond 9P: Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
9
8
7
6
5
4
3
2
1
0
Inflow Area=38.369 ac
Peak Elev=5,281.51'
18.0" x 20.0' Culvert
8.91 cfs8.91 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 41HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 10P: Culvert
Inflow Area = 95.123 ac, 0.00% Impervious, Inflow Depth = 0.32" for 100-yr event
Inflow = 12.66 cfs @ 12.50 hrs, Volume= 2.562 af
Outflow = 12.66 cfs @ 12.50 hrs, Volume= 2.562 af, Atten= 0%, Lag= 0.0 min
Primary = 12.66 cfs @ 12.50 hrs, Volume= 2.562 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,318.96' @ 12.50 hrs
Flood Elev= 5,327.17'
Device Routing Invert Outlet Devices
#1 Primary 5,316.00'18.0" x 70.0' long Culvert
CPP, end-section conforming to fill, Ke= 0.500
Outlet Invert= 5,314.60' S= 0.0200 '/' Cc= 0.900 n= 0.012
Primary OutFlow Max=12.66 cfs @ 12.50 hrs HW=5,318.96' TW=5,303.72' (Dynamic Tailwater)
1=Culvert (Inlet Controls 12.66 cfs @ 7.16 fps)
Pond 10P: Culvert
InflowPrimary
Hydrograph
Time (hours)
36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=95.123 ac
Peak Elev=5,318.96'
18.0" x 70.0' Culvert
12.66 cfs12.66 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 42HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 13P: East Pond
Inflow Area = 6.875 ac, 0.00% Impervious, Inflow Depth = 0.82" for 100-yr event
Inflow = 11.14 cfs @ 11.94 hrs, Volume= 0.470 af
Outflow = 0.70 cfs @ 12.81 hrs, Volume= 0.470 af, Atten= 94%, Lag= 52.1 min
Primary = 0.70 cfs @ 12.81 hrs, Volume= 0.470 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,214.50' @ 12.81 hrs Surf.Area= 2,864 sf Storage= 7,997 cf
Plug-Flow detention time= 105.7 min calculated for 0.470 af (100% of inflow)
Center-of-Mass det. time= 105.7 min ( 959.6 - 853.9 )
Volume Invert Avail.Storage Storage Description
#1 5,208.00' 9,522 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
5,208.00 70 0 0
5,209.00 333 202 202
5,210.00 633 483 685
5,211.00 986 810 1,494
5,212.00 1,427 1,207 2,701
5,213.00 1,965 1,696 4,397
5,214.00 2,552 2,259 6,655
5,215.00 3,182 2,867 9,522
Device Routing Invert Outlet Devices
#1 Primary 5,208.00'4.0" x 72.0' long Culvert CPP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,204.00' S= 0.0556 '/' Cc= 0.900 n= 0.012
#2 Primary 5,215.00'4.0' long (Profile 9) Broad-Crested Rectangular Weir Head (feet) 1.97 2.46 2.95 3.94 4.92
Coef. (English) 3.55 3.55 3.57 3.60 3.66
Primary OutFlow Max=0.70 cfs @ 12.81 hrs HW=5,214.50' TW=5,201.45' (Dynamic Tailwater)
1=Culvert (Barrel Controls 0.70 cfs @ 8.00 fps)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 43HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Pond 13P: East Pond
Inflow
Primary
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=6.875 ac
Peak Elev=5,214.50'
Storage=7,997 cf
11.14 cfs
0.70 cfs
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 44HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Summary for Pond 14P: West Pond
Inflow Area = 95.881 ac, 0.00% Impervious, Inflow Depth = 0.33" for 100-yr event
Inflow = 12.79 cfs @ 12.50 hrs, Volume= 2.643 af
Outflow = 10.61 cfs @ 12.71 hrs, Volume= 2.642 af, Atten= 17%, Lag= 12.7 min
Primary = 10.61 cfs @ 12.71 hrs, Volume= 2.642 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-36.00 hrs, dt= 0.01 hrs / 3
Peak Elev= 5,266.79' @ 12.71 hrs Surf.Area= 1,897 sf Storage= 4,481 cf
Plug-Flow detention time= 2.4 min calculated for 2.642 af (100% of inflow)
Center-of-Mass det. time= 2.2 min ( 947.4 - 945.2 )
Volume Invert Avail.Storage Storage Description
#1 5,260.00' 5,382 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
5,260.00 0 0 0
5,261.00 49 25 25
5,262.00 188 119 143
5,263.00 406 297 440
5,264.00 694 550 990
5,265.00 1,054 874 1,864
5,266.00 1,489 1,272 3,136
5,267.00 2,003 1,746 4,882
5,267.50 0 501 5,382
Device Routing Invert Outlet Devices
#1 Primary 5,261.00'15.0" x 85.0' long Culvert CPP, projecting, no headwall, Ke= 0.900
Outlet Invert= 5,251.00' S= 0.1176 '/' Cc= 0.900 n= 0.012
#2 Primary 5,267.00'4.0' long (Profile 9) Broad-Crested Rectangular Weir
Head (feet) 1.97 2.46 2.95 3.94 4.92
Coef. (English) 3.55 3.55 3.57 3.60 3.66
Primary OutFlow Max=10.61 cfs @ 12.71 hrs HW=5,266.79' TW=5,201.45' (Dynamic Tailwater)
1=Culvert (Inlet Controls 10.61 cfs @ 8.64 fps)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Type II 24-hr 100-yr Rainfall=2.63"103 Pre and Post-developed
Printed 7/15/2008Prepared by {enter your company name here}
Page 45HydroCAD® 8.50 s/n 005531 © 2007 HydroCAD Software Solutions LLC
Pond 14P: West Pond
Inflow
Primary
Hydrograph
Time (hours)36353433323130292827262524232221201918171615141312111098765
Fl
o
w
(
c
f
s
)
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Inflow Area=95.881 ac
Peak Elev=5,266.79'
Storage=4,481 cf
12.79 cfs
10.61 cfs
APPENDIX E
Structure Capacity Calculations
FlowMaster v5.1507/15/08
Page 1 of 1 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-166603:31:09 PM
Worksheet for Trapezoidal Channel
Dam Spillway
Project Description
Project File l:\bd0jtp~b\1xxykc~e\h1vr30~i\103.fm2
Worksheet Dam weir
Flow Element Trapezoidal Channel
Method Manning's Formula
Solve For Discharge
Input Data
Mannings Coefficient 0.030
Channel Slope 2.0000 %
Depth 1.00 ft
Left Side Slope 2.000000 H : V
Right Side Slope 2.000000 H : V
Bottom Width 4.00 ft
Results
Discharge 33.39 cfs
Flow Area 6.00 ft²
Wetted Perimeter 8.47 ft
Top Width 8.00 ft
Critical Depth 1.07 ft
Critical Slope 0.015318 ft/ft
Velocity 5.57 ft/s
Velocity Head 0.48 ft
Specific Energy 1.48 ft
Froude Number 1.13
Flow is supercritical.
07/15/08 FlowMaster v5.15
Page 1 of 1 03:31:49 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Dam Spillway channel
Worksheet for Trapezoidal Channel
Project Description
Project File l:\bd0jtp~b\1xxykc~e\h1vr30~i\103.fm2
Worksheet Dam spillways
Flow Element Trapezoidal Channel
Method Manning's Formula
Solve For Discharge
Input Data
Mannings Coefficient 0.030
Channel Slope 3.000000 H : V
Depth 1.00 ft
Left Side Slope 2.000000 H : V
Right Side Slope 2.000000 H : V
Bottom Width 4.00 ft
Results
Discharge 136.32 cfs
Flow Area 6.00 ft²
Wetted Perimeter 8.47 ft
Top Width 8.00 ft
Critical Depth 2.29 ft
Critical Slope 0.012747 ft/ft
Velocity 22.72 ft/s
Velocity Head 8.02 ft
Specific Energy 9.02 ft
Froude Number 4.63
Flow is supercritical.
Page 1 of 1
FlowMaster v5.15
03:33:53 PM
07/15/08
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Swale
Worksheet for Triangular Channel
Project Description
Project File l:\bd0jtp~b\1xxykc~e\h1vr30~i\103.fm2
Worksheet triangular channel
Flow Element Triangular Channel
Method Manning's Formula
Solve For Discharge
Input Data
Mannings Coefficient 0.035
Channel Slope 5.2800 %
Depth 1.00 ft
Left Side Slope 2.000000 H : V
Right Side Slope 2.000000 H : V
Results
Discharge 11.41 cfs
Flow Area 2.00 ft²
Wetted Perimeter 4.47 ft
Top Width 4.00 ft
Critical Depth 1.15 ft
Critical Slope 0.024899 ft/ft
Velocity 5.70 ft/s
Velocity Head 0.51 ft
Specific Energy 1.51 ft
Froude Number 1.42
Flow is supercritical.
03:33:20 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
07/15/08
Page 1 of 1
FlowMaster v5.15
Existing 48" culvert
Worksheet for Circular Channel
Project Description
Project File l:\bd0jtp~b\1xxykc~e\h1vr30~i\103.fm2
Worksheet Existing 48" Culvert
Flow Element Circular Channel
Method Manning's Formula
Solve For Discharge
Input Data
Mannings Coefficient 0.024
Channel Slope 0.125000 ft/ft
Depth 4.00 ft
Diameter 48.00 in
Results
Discharge 275.07 cfs
Flow Area 12.57 ft²
Wetted Perimeter 12.57 ft
Top Width 0.00 ft
Critical Depth 3.96 ft
Percent Full 100.00
Critical Slope 0.114676 ft/ft
Velocity 21.89 ft/s
Velocity Head 7.45 ft
Specific Energy FULL ft
Froude Number FULL
Maximum Discharge 295.90 cfs
Full Flow Capacity 275.07 cfs
Full Flow Slope 0.125000 ft/ft
FlowMaster v5.15
03:32:24 PM Page 1 of 1
07/15/08
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Worksheet for Triangular Channel
Existing Road Ditch
Project Description
Project File l:\bd0jtp~b\1xxykc~e\h1vr30~i\103.fm2
Worksheet Gas road ditch
Flow Element Triangular Channel
Method Manning's Formula
Solve For Discharge
Input Data
Mannings Coefficient 0.035
Channel Slope 7.0000 %
Depth 1.00 ft
Left Side Slope 2.000000 H : V
Right Side Slope 2.000000 H : V
Results
Discharge 13.14 cfs
Flow Area 2.00 ft²
Wetted Perimeter 4.47 ft
Top Width 4.00 ft
Critical Depth 1.22 ft
Critical Slope 0.024436 ft/ft
Velocity 6.57 ft/s
Velocity Head 0.67 ft
Specific Energy 1.67 ft
Froude Number 1.64
Flow is supercritical.
APPENDIX B
Domestic Water System Calculations
T-
1
1-
2
2-
3
3-
4
1-
5
5-
6
6-
7
7-
8
8-
9
9-
1
0
10
-
1
1
11
-
1
2
12
-
1
3
13
-
1
4
14
-
6
4-
1
5
4-
1
0
6-
1
6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
TA
N
K
Wa
s
h
/
R
V
WW
T
F
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
W
a
t
e
r
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
N
o
d
e
s
a
t
1
:
0
0
H
r
s
El
e
v
a
t
i
o
n
D
e
m
a
n
d
H
e
a
d
P
r
e
s
s
u
r
e
N
o
d
e
I
D
f
t
G
P
M
f
t
p
s
i
Ju
n
c
1
5
3
4
3
5
.
0
0
5
4
3
1
.
3
5
3
8
.
2
8
Ju
n
c
2
5
3
5
2
6
0
.
0
0
5
4
2
9
.
5
0
3
3
.
5
8
Ju
n
c
3
5
3
6
0
6
5
.
0
0
5
4
2
7
.
4
6
2
9
.
2
3
Ju
n
c
4
5
3
5
1
2
0
.
0
0
5
4
2
5
.
9
0
3
2
.
4
5
Ju
n
c
5
5
3
2
9
3
0
.
0
0
5
4
2
8
.
6
5
4
3
.
1
8
Ju
n
c
6
5
3
1
6
4
5
.
0
0
5
4
2
6
.
4
6
4
7
.
8
6
Ju
n
c
7
5
3
2
4
6
0
.
0
0
5
4
2
5
.
6
2
4
4
.
0
3
Ju
n
c
8
5
3
2
9
6
0
.
0
0
5
4
2
5
.
1
7
4
1
.
6
7
Ju
n
c
9
5
3
2
2
8
0
.
0
0
5
4
2
5
.
0
4
4
4
.
6
5
Ju
n
c
1
0
5
3
1
3
1
5
.
0
0
5
4
2
5
.
0
8
4
8
.
5
6
Ju
n
c
1
1
5
3
0
0
3
0
.
0
0
5
4
2
3
.
7
7
5
3
.
6
3
Ju
n
c
1
2
5
2
8
3
3
5
.
0
0
5
4
2
3
.
0
3
6
0
.
6
7
Ju
n
c
1
3
5
2
9
6
6
0
.
0
0
5
4
2
2
.
9
2
5
5
.
0
0
Ju
n
c
1
4
5
3
0
9
4
0
.
0
0
5
4
2
4
.
2
1
4
9
.
9
2
Ju
n
c
1
5
5
3
1
5
2
0
.
0
0
5
4
1
8
.
4
6
4
4
.
8
3
Ju
n
c
1
6
5
2
4
4
0
.
0
0
5
4
2
6
.
4
6
7
9
.
0
6
Ta
n
k
T
A
N
K
5
4
4
0
-
6
2
5
.
0
0
5
4
5
0
.
0
0
4
.
3
3
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
W
a
t
e
r
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
L
i
n
k
s
a
t
1
:
0
0
H
r
s
Le
n
g
t
h
D
i
a
m
e
t
e
r
R
o
u
g
h
n
e
s
s
F
l
o
w
V
e
l
o
c
i
t
y
U
n
i
t
H
e
a
d
l
o
s
s
F
r
i
c
t
i
o
n
F
a
c
t
o
r
L
i
n
k
I
D
f
t
i
n
G
P
M
f
p
s
f
t
/
K
f
t
Pi
p
e
T
-
1
1
5
0
0
8
1
0
0
6
2
5
.
0
0
3
.
9
9
1
2
.
4
3
0
.
0
3
4
Pi
p
e
1
-
2
1
4
6
6
1
0
0
2
9
6
.
3
3
3
.
3
6
1
2
.
6
8
0
.
0
3
6
Pi
p
e
2
-
3
2
4
4
6
1
0
0
2
3
6
.
3
3
2
.
6
8
8
.
3
4
0
.
0
3
7
Pi
p
e
3
-
4
3
4
0
6
1
0
0
1
7
1
.
3
3
1
.
9
4
4
.
6
0
0
.
0
3
9
Pi
p
e
1
-
5
1
8
1
6
1
0
0
3
2
3
.
6
8
3
.
6
7
1
4
.
9
3
0
.
0
3
6
Pi
p
e
5
-
6
1
7
5
6
1
0
0
2
9
3
.
6
8
3
.
3
3
1
2
.
4
7
0
.
0
3
6
Pi
p
e
6
-
7
1
9
6
6
1
0
0
1
6
5
.
0
6
1
.
8
7
4
.
2
9
0
.
0
3
9
Pi
p
e
7
-
8
2
4
6
6
1
0
0
1
0
5
.
0
6
1
.
1
9
1
.
8
6
0
.
0
4
2
Pi
p
e
8
-
9
3
2
7
6
1
0
0
4
5
.
0
6
0
.
5
1
0
.
3
9
0
.
0
4
8
Pi
p
e
9
-
1
0
1
5
6
6
1
0
0
-
3
4
.
9
4
0
.
4
0
0
.
2
4
0
.
0
4
9
Pi
p
e
1
0
-
1
1
1
5
7
4
1
0
0
8
1
.
3
9
2
.
0
8
8
.
3
4
0
.
0
4
1
Pi
p
e
1
1
-
1
2
2
0
8
4
1
0
0
5
1
.
3
9
1
.
3
1
3
.
5
6
0
.
0
4
4
Pi
p
e
1
2
-
1
3
2
4
2
4
1
0
0
1
6
.
3
9
0
.
4
2
0
.
4
3
0
.
0
5
2
Pi
p
e
1
3
-
1
4
4
9
0
4
1
0
0
-
4
3
.
6
1
1
.
1
1
2
.
6
3
0
.
0
4
5
Pi
p
e
1
4
-
6
2
5
7
4
1
0
0
-
8
3
.
6
1
2
.
1
3
8
.
7
7
0
.
0
4
1
Pi
p
e
4
-
1
5
4
1
0
2
1
0
0
2
0
.
0
0
2
.
0
4
1
8
.
1
5
0
.
0
4
7
Pi
p
e
4
-
1
0
2
9
3
6
1
0
0
1
3
1
.
3
3
1
.
4
9
2
.
8
1
0
.
0
4
1
Pi
p
e
6
-
1
6
3
7
0
2
1
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
W
a
t
e
r
Pa
g
e
1
APPENDIX C
Fire System Calculations
P1
-
2
P2
-
3
P3
-
4
P4
-
5
P5
-
6
P6
-
7
P7
-
2
P7
-
8P8
-
4
P6
-
J
1
P-
J
1
-
9
P-
J
1
-
p
d
FH
-
9
FH
-
6
FH
-
5
FH
-
4
FH
-
3
FH
-
2
FH
-
7
FH
-
8
FH
-
1
J-
1
Po
Da
y
1
,
1
2
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
N
o
d
e
s
El
e
v
a
t
i
o
n
D
e
m
a
n
d
H
e
a
d
P
r
e
s
s
u
r
e
N
o
d
e
I
D
f
t
G
P
M
f
t
p
s
i
Ju
n
c
F
H
-
9
5
3
7
8
0
.
0
0
5
4
3
3
.
3
3
2
3
.
9
7
Ju
n
c
F
H
-
6
5
3
4
4
0
.
0
0
5
4
2
7
.
3
0
3
6
.
0
9
Ju
n
c
F
H
-
5
5
3
1
5
0
.
0
0
5
4
2
2
.
4
7
4
6
.
5
7
Ju
n
c
F
H
-
4
5
3
1
3
0
.
0
0
5
4
1
7
.
2
8
4
5
.
1
8
Ju
n
c
F
H
-
3
5
2
8
5
0
.
0
0
5
4
1
1
.
7
0
5
4
.
9
0
Ju
n
c
F
H
-
2
5
3
1
2
.
6
0
.
0
0
5
4
0
5
.
2
8
4
0
.
1
6
Ju
n
c
F
H
-
7
5
3
5
2
0
.
0
0
5
4
1
7
.
2
1
2
8
.
2
5
Ju
n
c
F
H
-
8
5
3
2
8
.
5
0
.
0
0
5
4
1
7
.
2
5
3
8
.
4
6
Ju
n
c
F
H
-
1
5
3
1
7
.
2
1
5
0
0
.
0
0
5
3
9
2
.
6
9
3
2
.
7
1
Ju
n
c
J
-
1
5
3
7
9
0
.
0
0
5
4
3
3
.
3
3
2
3
.
5
4
Ta
n
k
P
o
n
d
5
4
5
0
-
1
5
0
0
.
0
0
5
4
6
0
.
0
0
4
.
3
3
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
N
o
d
e
s
El
e
v
a
t
i
o
n
D
e
m
a
n
d
H
e
a
d
P
r
e
s
s
u
r
e
N
o
d
e
I
D
f
t
G
P
M
f
t
p
s
i
Ju
n
c
F
H
-
9
5
3
7
8
0
.
0
0
5
4
3
3
.
3
3
2
3
.
9
7
Ju
n
c
F
H
-
6
5
3
4
4
0
.
0
0
5
4
2
7
.
3
0
3
6
.
0
9
Ju
n
c
F
H
-
5
5
3
1
5
0
.
0
0
5
4
2
2
.
4
7
4
6
.
5
7
Ju
n
c
F
H
-
4
5
3
1
3
0
.
0
0
5
4
1
7
.
2
8
4
5
.
1
8
Ju
n
c
F
H
-
3
5
2
8
5
0
.
0
0
5
4
1
1
.
7
0
5
4
.
9
0
Ju
n
c
F
H
-
2
5
3
1
2
.
6
1
5
0
0
.
0
0
5
4
0
5
.
2
8
4
0
.
1
6
Ju
n
c
F
H
-
7
5
3
5
2
0
.
0
0
5
4
1
7
.
2
1
2
8
.
2
5
Ju
n
c
F
H
-
8
5
3
2
8
.
5
0
.
0
0
5
4
1
7
.
2
5
3
8
.
4
5
Ju
n
c
F
H
-
1
5
3
1
7
.
2
0
.
0
0
5
4
0
5
.
2
8
3
8
.
1
6
Ju
n
c
J
-
1
5
3
7
9
0
.
0
0
5
4
3
3
.
3
3
2
3
.
5
4
Ta
n
k
P
o
n
d
5
4
5
0
-
1
5
0
0
.
0
1
5
4
6
0
.
0
0
4
.
3
3
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
N
o
d
e
s
El
e
v
a
t
i
o
n
D
e
m
a
n
d
H
e
a
d
P
r
e
s
s
u
r
e
N
o
d
e
I
D
f
t
G
P
M
f
t
p
s
i
Ju
n
c
F
H
-
9
5
3
7
8
0
.
0
0
5
4
3
3
.
3
3
2
3
.
9
7
Ju
n
c
F
H
-
6
5
3
4
4
0
.
0
0
5
4
2
7
.
3
0
3
6
.
0
9
Ju
n
c
F
H
-
5
5
3
1
5
0
.
0
0
5
4
2
2
.
2
6
4
6
.
4
8
Ju
n
c
F
H
-
4
5
3
1
3
0
.
0
0
5
4
1
6
.
8
4
4
4
.
9
9
Ju
n
c
F
H
-
3
5
2
8
5
1
5
0
0
.
0
0
5
4
0
5
.
6
3
5
2
.
2
7
Ju
n
c
F
H
-
2
5
3
1
2
.
6
0
.
0
0
5
4
1
1
.
7
3
4
2
.
9
5
Ju
n
c
F
H
-
7
5
3
5
2
0
.
0
0
5
4
1
7
.
5
6
2
8
.
4
1
Ju
n
c
F
H
-
8
5
3
2
8
.
5
0
.
0
0
5
4
1
7
.
1
2
3
8
.
4
0
Ju
n
c
F
H
-
1
5
3
1
7
.
2
0
.
0
0
5
4
1
1
.
7
3
4
0
.
9
6
Ju
n
c
J
-
1
5
3
7
9
0
.
0
0
5
4
3
3
.
3
3
2
3
.
5
4
Ta
n
k
P
o
n
d
5
4
5
0
-
1
5
0
0
.
0
0
5
4
6
0
.
0
0
4
.
3
3
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
N
o
d
e
s
El
e
v
a
t
i
o
n
D
e
m
a
n
d
H
e
a
d
P
r
e
s
s
u
r
e
N
o
d
e
I
D
f
t
G
P
M
f
t
p
s
i
Ju
n
c
F
H
-
9
5
3
7
8
0
.
0
0
5
4
3
3
.
3
3
2
3
.
9
7
Ju
n
c
F
H
-
6
5
3
4
4
0
.
0
0
5
4
2
7
.
3
0
3
6
.
0
9
Ju
n
c
F
H
-
5
5
3
1
5
0
.
0
0
5
4
2
1
.
4
7
4
6
.
1
3
Ju
n
c
F
H
-
4
5
3
1
3
1
5
0
0
.
0
0
5
4
1
5
.
1
9
4
4
.
2
8
Ju
n
c
F
H
-
3
5
2
8
5
0
.
0
0
5
4
1
6
.
3
0
5
6
.
8
9
Ju
n
c
F
H
-
2
5
3
1
2
.
6
0
.
0
0
5
4
1
7
.
5
7
4
5
.
4
8
Ju
n
c
F
H
-
7
5
3
5
2
0
.
0
0
5
4
1
8
.
7
9
2
8
.
9
4
Ju
n
c
F
H
-
8
5
3
2
8
.
5
0
.
0
0
5
4
1
6
.
5
8
3
8
.
1
6
Ju
n
c
F
H
-
1
5
3
1
7
.
2
0
.
0
0
5
4
1
7
.
5
7
4
3
.
4
9
Ju
n
c
J
-
1
5
3
7
9
0
.
0
0
5
4
3
3
.
3
3
2
3
.
5
4
Ta
n
k
P
o
n
d
5
4
5
0
-
1
5
0
0
.
0
0
5
4
6
0
.
0
0
4
.
3
3
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
N
o
d
e
s
El
e
v
a
t
i
o
n
D
e
m
a
n
d
H
e
a
d
P
r
e
s
s
u
r
e
N
o
d
e
I
D
f
t
G
P
M
f
t
p
s
i
Ju
n
c
F
H
-
9
5
3
7
8
0
.
0
0
5
4
3
3
.
3
3
2
3
.
9
7
Ju
n
c
F
H
-
6
5
3
4
4
0
.
0
0
5
4
2
7
.
3
0
3
6
.
0
9
Ju
n
c
F
H
-
5
5
3
1
5
1
5
0
0
.
0
0
5
4
1
7
.
7
9
4
4
.
5
4
Ju
n
c
F
H
-
4
5
3
1
3
0
.
0
0
5
4
2
1
.
0
6
4
6
.
8
2
Ju
n
c
F
H
-
3
5
2
8
5
0
.
0
0
5
4
2
1
.
6
3
5
9
.
2
0
Ju
n
c
F
H
-
2
5
3
1
2
.
6
0
.
0
0
5
4
2
2
.
2
9
4
7
.
5
3
Ju
n
c
F
H
-
7
5
3
5
2
0
.
0
0
5
4
2
2
.
9
1
3
0
.
7
3
Ju
n
c
F
H
-
8
5
3
2
8
.
5
0
.
0
0
5
4
2
1
.
7
7
4
0
.
4
1
Ju
n
c
F
H
-
1
5
3
1
7
.
2
0
.
0
0
5
4
2
2
.
2
9
4
5
.
5
3
Ju
n
c
J
-
1
5
3
7
9
0
.
0
0
5
4
3
3
.
3
3
2
3
.
5
4
Ta
n
k
P
o
n
d
5
4
5
0
-
1
5
0
0
.
0
1
5
4
6
0
.
0
0
4
.
3
3
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
N
o
d
e
s
El
e
v
a
t
i
o
n
D
e
m
a
n
d
H
e
a
d
P
r
e
s
s
u
r
e
N
o
d
e
I
D
f
t
G
P
M
f
t
p
s
i
Ju
n
c
F
H
-
9
5
3
7
8
0
.
0
0
5
4
3
3
.
3
3
2
3
.
9
7
Ju
n
c
F
H
-
6
5
3
4
4
1
5
0
0
.
0
0
5
4
2
7
.
3
0
3
6
.
0
9
Ju
n
c
F
H
-
5
5
3
1
5
0
.
0
0
5
4
2
7
.
3
0
4
8
.
6
6
Ju
n
c
F
H
-
4
5
3
1
3
0
.
0
0
5
4
2
7
.
3
0
4
9
.
5
3
Ju
n
c
F
H
-
3
5
2
8
5
0
.
0
0
5
4
2
7
.
3
0
6
1
.
6
6
Ju
n
c
F
H
-
2
5
3
1
2
.
6
0
.
0
0
5
4
2
7
.
3
0
4
9
.
7
0
Ju
n
c
F
H
-
7
5
3
5
2
0
.
0
0
5
4
2
7
.
3
0
3
2
.
6
3
Ju
n
c
F
H
-
8
5
3
2
8
.
5
0
.
0
0
5
4
2
7
.
3
0
4
2
.
8
1
Ju
n
c
F
H
-
1
5
3
1
7
.
2
0
.
0
0
5
4
2
7
.
3
0
4
7
.
7
1
Ju
n
c
J
-
1
5
3
7
9
0
.
0
0
5
4
3
3
.
3
3
2
3
.
5
4
Ta
n
k
P
o
n
d
5
4
5
0
-
1
5
0
0
.
0
0
5
4
6
0
.
0
0
4
.
3
3
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
N
o
d
e
s
El
e
v
a
t
i
o
n
D
e
m
a
n
d
H
e
a
d
P
r
e
s
s
u
r
e
N
o
d
e
I
D
f
t
G
P
M
f
t
p
s
i
Ju
n
c
F
H
-
9
5
3
7
8
0
.
0
0
5
4
3
3
.
3
3
2
3
.
9
7
Ju
n
c
F
H
-
6
5
3
4
4
0
.
0
0
5
4
2
7
.
3
0
3
6
.
0
9
Ju
n
c
F
H
-
5
5
3
1
5
0
.
0
0
5
4
2
3
.
1
1
4
6
.
8
5
Ju
n
c
F
H
-
4
5
3
1
3
0
.
0
0
5
4
1
8
.
6
0
4
5
.
7
6
Ju
n
c
F
H
-
3
5
2
8
5
0
.
0
0
5
4
1
7
.
8
2
5
7
.
5
5
Ju
n
c
F
H
-
2
5
3
1
2
.
6
0
.
0
0
5
4
1
6
.
9
1
4
5
.
2
0
Ju
n
c
F
H
-
7
5
3
5
2
1
5
0
0
.
0
0
5
4
1
6
.
0
4
2
7
.
7
5
Ju
n
c
F
H
-
8
5
3
2
8
.
5
0
.
0
0
5
4
1
7
.
6
2
3
8
.
6
2
Ju
n
c
F
H
-
1
5
3
1
7
.
2
0
.
0
0
5
4
1
6
.
9
1
4
3
.
2
0
Ju
n
c
J
-
1
5
3
7
9
0
.
0
0
5
4
3
3
.
3
3
2
3
.
5
4
Ta
n
k
P
o
n
d
5
4
5
0
-
1
5
0
0
.
0
1
5
4
6
0
.
0
0
4
.
3
3
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
N
o
d
e
s
El
e
v
a
t
i
o
n
D
e
m
a
n
d
H
e
a
d
P
r
e
s
s
u
r
e
N
o
d
e
I
D
f
t
G
P
M
f
t
p
s
i
Ju
n
c
F
H
-
9
5
3
7
8
0
.
0
0
5
4
3
3
.
3
3
2
3
.
9
7
Ju
n
c
F
H
-
6
5
3
4
4
0
.
0
0
5
4
2
7
.
3
0
3
6
.
0
9
Ju
n
c
F
H
-
5
5
3
1
5
0
.
0
0
5
4
2
2
.
2
5
4
6
.
4
7
Ju
n
c
F
H
-
4
5
3
1
3
0
.
0
0
5
4
1
6
.
8
1
4
4
.
9
8
Ju
n
c
F
H
-
3
5
2
8
5
0
.
0
0
5
4
1
7
.
0
5
5
7
.
2
2
Ju
n
c
F
H
-
2
5
3
1
2
.
6
0
.
0
0
5
4
1
7
.
3
2
4
5
.
3
8
Ju
n
c
F
H
-
7
5
3
5
2
0
.
0
0
5
4
1
7
.
5
8
2
8
.
4
2
Ju
n
c
F
H
-
8
5
3
2
8
.
5
1
5
0
0
.
0
0
5
4
1
3
.
4
1
3
6
.
7
9
Ju
n
c
F
H
-
1
5
3
1
7
.
2
0
.
0
0
5
4
1
7
.
3
2
4
3
.
3
8
Ju
n
c
J
-
1
5
3
7
9
0
.
0
0
5
4
3
3
.
3
3
2
3
.
5
4
Ta
n
k
P
o
n
d
5
4
5
0
-
1
5
0
0
.
0
0
5
4
6
0
.
0
0
4
.
3
3
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Network Table - Nodes
Elevation Demand Head Pressure
Node ID ft GPM ft psi
Junc FH-9 5378 1500.00 5431.67 23.26
Junc FH-6 5344 0.00 5433.33 38.71
Junc FH-5 5315 0.00 5433.33 51.27
Junc FH-4 5313 0.00 5433.33 52.14
Junc FH-3 5285 0.00 5433.33 64.27
Junc FH-2 5312.6 0.00 5433.33 52.31
Junc FH-7 5352 0.00 5433.33 35.24
Junc FH-8 5328.5 0.00 5433.33 45.42
Junc FH-1 5317.2 0.00 5433.33 50.32
Junc J-1 5379 0.00 5433.33 23.54
Tank Pond 5450 -1500.00 5460.00 4.33
High Mesa RV Park - Fire System
EPANET 2 Page 1
Ne
t
w
o
r
k
T
a
b
l
e
-
L
i
n
k
s
Le
n
g
t
h
D
i
a
m
e
t
e
r
R
o
u
g
h
n
e
s
s
F
l
o
w
V
e
l
o
c
i
t
y
U
n
i
t
H
e
a
d
l
o
s
s
F
r
i
c
t
i
o
n
F
a
c
t
o
r
L
i
n
k
I
D
f
t
i
n
G
P
M
f
p
s
f
t
/
K
f
t
Pi
p
e
P
1
-
2
2
0
0
8
1
0
0
-
1
5
0
0
.
0
0
9
.
5
7
6
2
.
9
2
0
.
0
2
9
Pi
p
e
P
2
-
3
5
2
9
8
1
0
0
-
6
1
7
.
1
0
3
.
9
4
1
2
.
1
4
0
.
0
3
4
Pi
p
e
P
3
-
4
4
5
9
8
1
0
0
-
6
1
7
.
1
0
3
.
9
4
1
2
.
1
5
0
.
0
3
4
Pi
p
e
P
4
-
5
3
6
2
8
1
0
0
-
6
7
5
.
5
5
4
.
3
1
1
4
.
3
6
0
.
0
3
3
Pi
p
e
P
5
-
6
3
3
6
8
1
0
0
-
6
7
5
.
5
5
4
.
3
1
1
4
.
3
6
0
.
0
3
3
Pi
p
e
P
6
-
7
4
8
6
8
1
0
0
8
2
4
.
4
5
5
.
2
6
2
0
.
7
7
0
.
0
3
2
Pi
p
e
P
7
-
2
5
0
6
8
1
0
0
8
8
2
.
9
0
5
.
6
4
2
3
.
5
8
0
.
0
3
2
Pi
p
e
P
7
-
8
2
7
5
8
1
0
0
-
5
8
.
4
6
0
.
3
7
0
.
1
5
0
.
0
4
8
Pi
p
e
P
8
-
4
1
7
2
8
1
0
0
-
5
8
.
4
6
0
.
3
7
0
.
1
5
0
.
0
4
7
Pi
p
e
P
6
-
J
1
2
8
4
1
0
1
0
0
1
5
0
0
.
0
0
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Pi
p
e
P
-
J
1
-
9
7
8
1
0
1
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
-
J
1
-
p
d
1
2
5
7
1
0
1
0
0
-
1
5
0
0
.
0
0
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
L
i
n
k
s
Le
n
g
t
h
D
i
a
m
e
t
e
r
R
o
u
g
h
n
e
s
s
F
l
o
w
V
e
l
o
c
i
t
y
U
n
i
t
H
e
a
d
l
o
s
s
F
r
i
c
t
i
o
n
F
a
c
t
o
r
L
i
n
k
I
D
f
t
i
n
G
P
M
f
p
s
f
t
/
K
f
t
Pi
p
e
P
1
-
2
2
0
0
8
1
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
2
-
3
5
2
9
8
1
0
0
6
0
0
.
1
3
3
.
8
3
1
1
.
5
3
0
.
0
3
4
Pi
p
e
P
3
-
4
4
5
9
8
1
0
0
-
8
9
9
.
8
7
5
.
7
4
2
4
.
4
2
0
.
0
3
2
Pi
p
e
P
4
-
5
3
6
2
8
1
0
0
-
6
9
1
.
4
1
4
.
4
1
1
4
.
9
9
0
.
0
3
3
Pi
p
e
P
5
-
6
3
3
6
8
1
0
0
-
6
9
1
.
4
1
4
.
4
1
1
4
.
9
9
0
.
0
3
3
Pi
p
e
P
6
-
7
4
8
6
8
1
0
0
8
0
8
.
5
9
5
.
1
6
2
0
.
0
3
0
.
0
3
2
Pi
p
e
P
7
-
2
5
0
6
8
1
0
0
6
0
0
.
1
3
3
.
8
3
1
1
.
5
3
0
.
0
3
4
Pi
p
e
P
7
-
8
2
7
5
8
1
0
0
2
0
8
.
4
6
1
.
3
3
1
.
6
3
0
.
0
3
9
Pi
p
e
P
8
-
4
1
7
2
8
1
0
0
2
0
8
.
4
6
1
.
3
3
1
.
6
3
0
.
0
3
9
Pi
p
e
P
6
-
J
1
2
8
4
1
0
1
0
0
1
5
0
0
.
0
0
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Pi
p
e
P
-
J
1
-
9
7
8
1
0
1
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
-
J
1
-
p
d
1
2
5
7
1
0
1
0
0
-
1
5
0
0
.
0
0
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
L
i
n
k
s
Le
n
g
t
h
D
i
a
m
e
t
e
r
R
o
u
g
h
n
e
s
s
F
l
o
w
V
e
l
o
c
i
t
y
U
n
i
t
H
e
a
d
l
o
s
s
F
r
i
c
t
i
o
n
F
a
c
t
o
r
L
i
n
k
I
D
f
t
i
n
G
P
M
f
p
s
f
t
/
K
f
t
Pi
p
e
P
1
-
2
2
0
0
8
1
0
0
-
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
2
-
3
5
2
9
8
1
0
0
-
6
1
7
.
1
0
3
.
9
4
1
2
.
1
5
0
.
0
3
4
Pi
p
e
P
3
-
4
4
5
9
8
1
0
0
-
6
1
7
.
1
0
3
.
9
4
1
2
.
1
5
0
.
0
3
4
Pi
p
e
P
4
-
5
3
6
2
8
1
0
0
-
6
7
5
.
5
6
4
.
3
1
1
4
.
3
6
0
.
0
3
3
Pi
p
e
P
5
-
6
3
3
6
8
1
0
0
-
6
7
5
.
5
6
4
.
3
1
1
4
.
3
6
0
.
0
3
3
Pi
p
e
P
6
-
7
4
8
6
8
1
0
0
8
2
4
.
4
5
5
.
2
6
2
0
.
7
7
0
.
0
3
2
Pi
p
e
P
7
-
2
5
0
6
8
1
0
0
8
8
2
.
9
1
5
.
6
4
2
3
.
5
8
0
.
0
3
2
Pi
p
e
P
7
-
8
2
7
5
8
1
0
0
-
5
8
.
4
6
0
.
3
7
0
.
1
5
0
.
0
4
8
Pi
p
e
P
8
-
4
1
7
2
8
1
0
0
-
5
8
.
4
6
0
.
3
7
0
.
1
5
0
.
0
4
7
Pi
p
e
P
6
-
J
1
2
8
4
1
0
1
0
0
1
5
0
0
.
0
1
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Pi
p
e
P
-
J
1
-
9
7
8
1
0
1
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
-
J
1
-
p
d
1
2
5
7
1
0
1
0
0
-
1
5
0
0
.
0
1
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
L
i
n
k
s
Le
n
g
t
h
D
i
a
m
e
t
e
r
R
o
u
g
h
n
e
s
s
F
l
o
w
V
e
l
o
c
i
t
y
U
n
i
t
H
e
a
d
l
o
s
s
F
r
i
c
t
i
o
n
F
a
c
t
o
r
L
i
n
k
I
D
f
t
i
n
G
P
M
f
p
s
f
t
/
K
f
t
Pi
p
e
P
1
-
2
2
0
0
8
1
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
2
-
3
5
2
9
8
1
0
0
2
5
7
.
6
3
1
.
6
4
2
.
4
1
0
.
0
3
8
Pi
p
e
P
3
-
4
4
5
9
8
1
0
0
2
5
7
.
6
3
1
.
6
4
2
.
4
1
0
.
0
3
8
Pi
p
e
P
4
-
5
3
6
2
8
1
0
0
-
7
4
8
.
1
1
4
.
7
8
1
7
.
3
5
0
.
0
3
3
Pi
p
e
P
5
-
6
3
3
6
8
1
0
0
-
7
4
8
.
1
1
4
.
7
8
1
7
.
3
5
0
.
0
3
3
Pi
p
e
P
6
-
7
4
8
6
8
1
0
0
7
5
1
.
8
9
4
.
8
0
1
7
.
5
1
0
.
0
3
3
Pi
p
e
P
7
-
2
5
0
6
8
1
0
0
2
5
7
.
6
3
1
.
6
4
2
.
4
1
0
.
0
3
8
Pi
p
e
P
7
-
8
2
7
5
8
1
0
0
4
9
4
.
2
6
3
.
1
5
8
.
0
5
0
.
0
3
5
Pi
p
e
P
8
-
4
1
7
2
8
1
0
0
4
9
4
.
2
6
3
.
1
5
8
.
0
5
0
.
0
3
5
Pi
p
e
P
6
-
J
1
2
8
4
1
0
1
0
0
1
5
0
0
.
0
0
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Pi
p
e
P
-
J
1
-
9
7
8
1
0
1
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
-
J
1
-
p
d
1
2
5
7
1
0
1
0
0
-
1
5
0
0
.
0
0
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
L
i
n
k
s
Le
n
g
t
h
D
i
a
m
e
t
e
r
R
o
u
g
h
n
e
s
s
F
l
o
w
V
e
l
o
c
i
t
y
U
n
i
t
H
e
a
d
l
o
s
s
F
r
i
c
t
i
o
n
F
a
c
t
o
r
L
i
n
k
I
D
f
t
i
n
G
P
M
f
p
s
f
t
/
K
f
t
Pi
p
e
P
1
-
2
2
0
0
8
1
0
0
-
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
2
-
3
5
2
9
8
1
0
0
1
8
0
.
1
2
1
.
1
5
1
.
2
4
0
.
0
4
0
Pi
p
e
P
3
-
4
4
5
9
8
1
0
0
1
8
0
.
1
2
1
.
1
5
1
.
2
4
0
.
0
4
0
Pi
p
e
P
4
-
5
3
6
2
8
1
0
0
5
2
5
.
6
7
3
.
3
6
9
.
0
3
0
.
0
3
4
Pi
p
e
P
5
-
6
3
3
6
8
1
0
0
-
9
7
4
.
3
3
6
.
2
2
2
8
.
3
0
0
.
0
3
1
Pi
p
e
P
6
-
7
4
8
6
8
1
0
0
5
2
5
.
6
8
3
.
3
6
9
.
0
2
0
.
0
3
4
Pi
p
e
P
7
-
2
5
0
6
8
1
0
0
1
8
0
.
1
2
1
.
1
5
1
.
2
4
0
.
0
4
0
Pi
p
e
P
7
-
8
2
7
5
8
1
0
0
3
4
5
.
5
6
2
.
2
1
4
.
1
5
0
.
0
3
7
Pi
p
e
P
8
-
4
1
7
2
8
1
0
0
3
4
5
.
5
6
2
.
2
1
4
.
1
5
0
.
0
3
7
Pi
p
e
P
6
-
J
1
2
8
4
1
0
1
0
0
1
5
0
0
.
0
1
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Pi
p
e
P
-
J
1
-
9
7
8
1
0
1
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
-
J
1
-
p
d
1
2
5
7
1
0
1
0
0
-
1
5
0
0
.
0
1
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
L
i
n
k
s
Le
n
g
t
h
D
i
a
m
e
t
e
r
R
o
u
g
h
n
e
s
s
F
l
o
w
V
e
l
o
c
i
t
y
U
n
i
t
H
e
a
d
l
o
s
s
F
r
i
c
t
i
o
n
F
a
c
t
o
r
L
i
n
k
I
D
f
t
i
n
G
P
M
f
p
s
f
t
/
K
f
t
Pi
p
e
P
1
-
2
2
0
0
8
1
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
2
-
3
5
2
9
8
1
0
0
0
.
2
6
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
3
-
4
4
5
9
8
1
0
0
0
.
2
6
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
4
-
5
3
6
2
8
1
0
0
0
.
3
9
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
5
-
6
3
3
6
8
1
0
0
0
.
3
9
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
6
-
7
4
8
6
8
1
0
0
0
.
3
9
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
7
-
2
5
0
6
8
1
0
0
0
.
2
6
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
7
-
8
2
7
5
8
1
0
0
0
.
1
3
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
8
-
4
1
7
2
8
1
0
0
0
.
1
3
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
6
-
J
1
2
8
4
1
0
1
0
0
1
5
0
0
.
0
0
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Pi
p
e
P
-
J
1
-
9
7
8
1
0
1
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
-
J
1
-
p
d
1
2
5
7
1
0
1
0
0
-
1
5
0
0
.
0
0
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
L
i
n
k
s
Le
n
g
t
h
D
i
a
m
e
t
e
r
R
o
u
g
h
n
e
s
s
F
l
o
w
V
e
l
o
c
i
t
y
U
n
i
t
H
e
a
d
l
o
s
s
F
r
i
c
t
i
o
n
F
a
c
t
o
r
L
i
n
k
I
D
f
t
i
n
G
P
M
f
p
s
f
t
/
K
f
t
Pi
p
e
P
1
-
2
2
0
0
8
1
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
2
-
3
5
2
9
8
1
0
0
-
2
1
4
.
3
6
1
.
3
7
1
.
7
1
0
.
0
3
9
Pi
p
e
P
3
-
4
4
5
9
8
1
0
0
-
2
1
4
.
3
6
1
.
3
7
1
.
7
1
0
.
0
3
9
Pi
p
e
P
4
-
5
3
6
2
8
1
0
0
-
6
2
5
.
6
0
3
.
9
9
1
2
.
4
6
0
.
0
3
4
Pi
p
e
P
5
-
6
3
3
6
8
1
0
0
-
6
2
5
.
6
0
3
.
9
9
1
2
.
4
6
0
.
0
3
4
Pi
p
e
P
6
-
7
4
8
6
8
1
0
0
8
7
4
.
4
0
5
.
5
8
2
3
.
1
6
0
.
0
3
2
Pi
p
e
P
7
-
2
5
0
6
8
1
0
0
-
2
1
4
.
3
5
1
.
3
7
1
.
7
1
0
.
0
3
9
Pi
p
e
P
7
-
8
2
7
5
8
1
0
0
-
4
1
1
.
2
4
2
.
6
2
5
.
7
3
0
.
0
3
6
Pi
p
e
P
8
-
4
1
7
2
8
1
0
0
-
4
1
1
.
2
4
2
.
6
2
5
.
7
3
0
.
0
3
6
Pi
p
e
P
6
-
J
1
2
8
4
1
0
1
0
0
1
5
0
0
.
0
0
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Pi
p
e
P
-
J
1
-
9
7
8
1
0
1
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
-
J
1
-
p
d
1
2
5
7
1
0
1
0
0
-
1
5
0
0
.
0
1
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
L
i
n
k
s
Le
n
g
t
h
D
i
a
m
e
t
e
r
R
o
u
g
h
n
e
s
s
F
l
o
w
V
e
l
o
c
i
t
y
U
n
i
t
H
e
a
d
l
o
s
s
F
r
i
c
t
i
o
n
F
a
c
t
o
r
L
i
n
k
I
D
f
t
i
n
G
P
M
f
p
s
f
t
/
K
f
t
Pi
p
e
P
1
-
2
2
0
0
8
1
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
2
-
3
5
2
9
8
1
0
0
1
1
1
.
7
2
0
.
7
1
0
.
5
1
0
.
0
4
3
Pi
p
e
P
3
-
4
4
5
9
8
1
0
0
1
1
1
.
7
2
0
.
7
1
0
.
5
1
0
.
0
4
3
Pi
p
e
P
4
-
5
3
6
2
8
1
0
0
-
6
9
2
.
1
7
4
.
4
2
1
5
.
0
2
0
.
0
3
3
Pi
p
e
P
5
-
6
3
3
6
8
1
0
0
-
6
9
2
.
1
7
4
.
4
2
1
5
.
0
2
0
.
0
3
3
Pi
p
e
P
6
-
7
4
8
6
8
1
0
0
8
0
7
.
8
3
5
.
1
6
2
0
.
0
0
0
.
0
3
2
Pi
p
e
P
7
-
2
5
0
6
8
1
0
0
1
1
1
.
7
2
0
.
7
1
0
.
5
1
0
.
0
4
3
Pi
p
e
P
7
-
8
2
7
5
8
1
0
0
6
9
6
.
1
1
4
.
4
4
1
5
.
1
8
0
.
0
3
3
Pi
p
e
P
8
-
4
1
7
2
8
1
0
0
-
8
0
3
.
8
9
5
.
1
3
1
9
.
8
2
0
.
0
3
2
Pi
p
e
P
6
-
J
1
2
8
4
1
0
1
0
0
1
5
0
0
.
0
0
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Pi
p
e
P
-
J
1
-
9
7
8
1
0
1
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
-
J
1
-
p
d
1
2
5
7
1
0
1
0
0
-
1
5
0
0
.
0
0
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1
Ne
t
w
o
r
k
T
a
b
l
e
-
L
i
n
k
s
Le
n
g
t
h
D
i
a
m
e
t
e
r
R
o
u
g
h
n
e
s
s
F
l
o
w
V
e
l
o
c
i
t
y
U
n
i
t
H
e
a
d
l
o
s
s
F
r
i
c
t
i
o
n
F
a
c
t
o
r
L
i
n
k
I
D
f
t
i
n
G
P
M
f
p
s
f
t
/
K
f
t
Pi
p
e
P
1
-
2
2
0
0
8
1
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
2
-
3
5
2
9
8
1
0
0
0
.
2
6
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
3
-
4
4
5
9
8
1
0
0
0
.
2
6
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
4
-
5
3
6
2
8
1
0
0
0
.
3
9
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
5
-
6
3
3
6
8
1
0
0
0
.
3
9
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
6
-
7
4
8
6
8
1
0
0
0
.
3
9
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
7
-
2
5
0
6
8
1
0
0
0
.
2
6
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
7
-
8
2
7
5
8
1
0
0
0
.
1
3
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
8
-
4
1
7
2
8
1
0
0
0
.
1
3
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
6
-
J
1
2
8
4
1
0
1
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
.
0
0
0
Pi
p
e
P
-
J
1
-
9
7
8
1
0
1
0
0
1
5
0
0
.
0
0
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Pi
p
e
P
-
J
1
-
p
d
1
2
5
7
1
0
1
0
0
-
1
5
0
0
.
0
0
6
.
1
3
2
1
.
2
2
0
.
0
3
0
Hi
g
h
M
e
s
a
R
V
P
a
r
k
-
F
i
r
e
S
y
s
t
e
m
EP
A
N
E
T
2
Pa
g
e
1