HomeMy WebLinkAboutApplication-PermitGarfield County
Building & Sanitation Department
108 8111 Street, Suite #401 Glenwood Springs, Co. 81601
Office- 945-8212 Inspection Line- 384-5003
l
Job Address X3`1 1�i�
Building Permit oo—n ��
Cr `lir. �t
Nature of Work 1J1 - Db—e--)121
Use of Building 0 nU iet -Pit ,�` Q_JC
Owner CN (ULl.��l'�.0"t Q J'\(� CA
Contractor n'\Q-� J
Amount of Permit $ meq. u
Date In M. bL
Clerk
GARFIELD COUNTY BUILDING PERMIT APPLICATION
106 S" Btmet, Salta 401, OMaaaa4 BFrla., CO 81601
Phone: 91t -94S 12 / In: 9'70-3843470 / Inspection Una: 97O-388003 ,`�y� Z
Permit No' 9/�154 Pared/ScheduleNo'Z`tQ7.. g) .- 0 3 018
J9bAddresr 339.:-R0 C C -14-Th r Call CO 8Iln3S
1 Lot No:Black
l
No:
dress �
333 Kocon
Address:
Sc.n Y
Erell hon: '/
11Q telt A C.e- 1k" VI iWG1J
2
__.
Owner: _r
4-11c.n
ll ..
Ph2S 913'1
ph
$a en i
20e-46-2.2-
3
Contra or'
Owner
lac. No.
4
Arch itect/Er� eer: ``
C
s(. rt J tC, • 1.-S�
Address:
to fllA..�-3
Sq.Ft .t, t4�
y l
a45 - 11 Zb
Lar. No.
No. of Floors:
5
_
Sq Ft Lf Bud 53/3 �i1,
I 5�1
Height
6
Use of Budding: �rll�
tt1Ve1 over ---Vec1L
7
Desenbe Work
er�A ���� A� 11
ETT O& Kit. AP r74004- O lX Y ,QJ a re--o&-i I.
8
Class of Work:
❑
x New
❑ Single
Double
Alteration 0 Remove
Addition}Q Move
9
10
11
Garage:
0
Carport: 0 Single
❑ Double
0 Driveway Permit 0 On -Site Sewage
Disposal
dr& site pian
S /O No
` /
Val uationof Work; E
t,l_i 1TVCf�,.(e tO)O0O.
Adjusted Valuations:
12
Srtaal Conditions.
NOTICE
A SEPARATE ELECTRICAL PERMIT I3 REQUIRED AND
ISSUED BY THE STATE OF COLORADO
11113PEImIT BECOMES NULL AND VOID IFWORK OR
AUTHORIZED 13 NOT COMMENCED WTI1011 180 DAYS,
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED
PERIOD OF 180 DAYS AT ANY TIME AFTER WORE IS
T I HAVE READ AND EXAMINED
HEREBY NAND KNOW
APPLICATION AND KNOW THE]ANE TO BETRUE F
PROVISIONS OF LAWS 00 1 THIS TYPE OF WORK
moors
CONSTRUCTION
OR, IF
FOR A
COMMENCED
CORRECT.
OWRRFLT.ALL
WUL BE
OR NOT. THE
AUTHORITY
SPATE OR
PERFORMANCE
5/�1/�
Plan Chec Fee:
1 l 8181.s
/
Permit Fee:
Total Fee:
/ 9 9. O
I IL
Dated Permit Issued:
OCCL,
ec
Const. Type:
COMPLETED WITHIN / :. IN® HEREM
GRPOINTEr • �,.. ',UNE TO GIVE
• fir .. 1 9 OF ANY OTHER
LOCAL LAW 1 • 1 ON OR THE
OF CON • ,O -C T i/1
a pef/
zoning:
Setbacks:
Manu. Home:
ISDS No. & Fee:
14 •
. Dr` - -r; -- . 1. 1
.. A TUTS APPROVAL/DATE /
I
/AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APRICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT'
THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY tun BUILDING DEPARTMENT
IN CONSDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH AIL. BUILDING CODES AND LAND
USE REGUTA1IONS ADOPTED BY GARN= COUNTY PURSUANT TO AOn10WTY GIVEN 121 3028.201 CULT AS AI®D®. THE STONER FURTHER AGREES
THAT IF THE ABOVE SAM ORODIAIANCES Alm NOT PULLY COURTED WITH IN TIM LOCATION, ERECTION. COPTS RUCTION, AND USE OF THE
MOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE T SHALL BECOME
NULL AND VOM. TINE ISSUANCE OF A FERMI BASED UPON PANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL
FROM THEREAFTER REQUMMO THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OILER DATA OR FROM PREVENTING
BUILDING OPERATION BEING CARRIED ON THEfEU11DER WHEN IN VIOIATION OF 'TIS CODE OR ANY OTHER ORDINANCE OR REODUTOPI OF
THIS JURISDICTION THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIOf19 CONDUCTED THEREAFTER DOES NOT CON SITTTIE
AN ACCEPTANCE OF ANY REBPoNS®BAIM OR 11`rmmn BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DECRWlC[6S. THE 1B8PONS1
BUSTY FOR THESE ITEMS AND W PEMENTATION DURING CONSTRUCTION 113813 SPECIFICIATLY WITH THE ARIICIRCT, DESIGNER BUILDER
AND OWNER COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST.
1HEREBY ACKNOWLEDGE THAT 1 HAVE READ AND UNDERSTAND THE AGREEMENT *BOW IIf0'1M1' _,
The following items are required by Garfield County for a fmal inspection:
I. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access mad;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. MI bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold
running water, non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all IBC and IRC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating cucurnstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made;
8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any fatal sign off by the Fire District, and/or State
Agencies where applicable.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
""CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDmONS ARE MET.
1 understand and agree to abide by the above conditions for occupancy, yqe
Certificate of Occ pan , .r the dwelling under building permit # t
Signature
Bpappl'y?` on feb2006
6
Date
the issuance of a
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
For
SINGLE FAMILY DWELLING CONSTRUCTION
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite the
issuance of a permit it is important that complete information be provided. When reviewing a plan
and it's discovered that required information has not been provided by the applicant, this will result
in the delay of the permit issuance and in proceeding with building construction. The owner or
contractor shall be required to provide this information before the plan review can proceed. Other
plans that are in line for review may be given attention before the new information may be reviewed
after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. Also, please consider
using a design professional for assistance in your design and a construction professional for
construction of your project. Any project with more than ten (10) occupants requires the
plans to be sealed by a Colorado Registered Design Professional.
To provide for a more understandable plan in order to determine compliance with the building,
plumbing and mechanical codes, applicants are requested to review the following checklist prior to
and during design. Applicants are required to indicate appropriately and to submit the
completed checklist at time of application for a permit.
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and
drawn to scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
1
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line
and original grade. A section showing in detail, from the bottom of the footing to the top of the roof,
including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation,
sheeting, house -rap, (which is required), siding or any approved building material. Engineered
foundations may be required.
A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be
designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind
speed, wind exposure B or C, and a 36 inch frost depth.
All sheets to be identified by number and indexed. All of the above requirements must be met or
your plans will be returned.
All plans submitted must be incompliance with the 2003 IRC.
1. Is a site plan included that identifies the location of the proposed structure or addition and
distances to the property lines from each corner of the proposed structure(s) prepared by
a licensed surveyor and has the surveyors signature and professional stamp on the
drawing? Properties with slopes of 30% or greater must be shown on the site plan.
(NOTE Section: 106.2) Any site plan for the placement of any portion of a structure
within 50 ft. of a property line and not within a previously surveyed building envelope on
a subdivision final plat shall be prepared by a licensed surveyor and have the surveyor's
signature and professional stamp on the drawing. Any structure to be built within a
building envelope of a lot shown on a recorded subdivision plat shall include a copy of
the building envelope as it is shown on the final plat with the proposed structure located
within the envelope.
Yes }(
2. Does the site plan also include any other buildings on the property, setback easements and
utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution
if the property you are applying for a building permit on is located on a corner lot. Special
setbacks do apply.
Yes
3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage
Disposal System) and the distances to the property lines, wells (on subject property and
adjacent properties), streams or water courses?
2
4. Does the site plan indicate the location and direction of the County or private road accessing
the prope} ty?
Yes
5. Do the p ans include a foundation plan indicating the size, location and spacing of all
reinforcing Leel in accordance with the IRC or per stamped engineered design?
Yes N reel
6. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes N I /T
7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist
spaces and its?
Yes
8. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and wind loads?
Yes fk,
9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof
construction?
Yes!
10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rafters or joists or trusses?
Yes
11. Does the building section drawing or other detail include the method of positive connection
of all columns and beams?
Yes
12. Does the elevation plan indicate the height of the building or proposed addition from the
undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the
top of a roof? (Building height measurement usually not to exceed 25 feet)
Yes
13. Does the plan include any stove or zero clearance fireplace planned for installation including
make and model and Colorado Phase II certifications or phase II EPA certification?
Yes No
3
14. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the IRC?
Yes No
15. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the IRC?
Yes No
16. Does the plan include a window schedule or other verification that windows provide natural
light and ventilation for all habitable rooms?
Yes No '$
17. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as
a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures
and specify safety glazing for these areas?
Yes No
18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan? \/
Yes No l�
19. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes
and/or covenants?
Yes )c No
20. Do you understand that if you belong to a homeowners association, it is your responsibility
to obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? The building permit application will not
be accepted thout it.
Yes No
21. Will this be the only residential structure on the parcel?
Yes % No If no -Explain:
22. Have two 2 complete sets of construction drawings been submitted with the application?
Yes
23. Do you understand that the minimum dimension a home can be on a lot is 20ft.wide and
20ft. long?
Yes No
4
24. Have you designed or bad this plan designed while considering building and other
construction code requirements?
Yes x No
25. Do your plans comply with all zoning rules and regulations in the County related to your
properties zone district?
Yes X No
26. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection b the Garfield County Building Department?
Yes A No
27. Do you understand that approval for design and/or construction changes are required prior
to the application of these changes?
Yes X No
28. Do you understand that the Building Department will collect a "Plan Review" fee from you
at the time of application submittal and that you will be required to pay the "Permit Fee" as
well as any "Road Impact" or "Septic System" fees required, at the time you pick up your
buildingrmit?
Yes a No
29. Are you aware that you must can in for an inspection by 3:30 the business day before
the requested inspection in order to receive it the following business day? Inspections
will be made from 7:30 a.m. to 3:30 p.m. Monday through Friday. Inspections are to
be called in to 384-5003.
Yes to No
30. Are you aware that requesting inspections on work that is not ready or not accessible will
result in a $50.00 re -inspection fee?
Yes x No
31. Are you aware that you are required to call for all inspections required under the IRC
including approval on a final inspection prior to receiving a Certificate of Occupancy and
occupancy of the building?
Yes No
32. Are you aware that the Permit Application must be signed by the Owner or a written
authority being given for an Agent and that the party responsible for the project must comply
with the IRC?
Yes No
5
33. Are you aware that prior to submittal of a building permit application you are required to
show proof of a driveway access pemtit or obtain a statement from the Garfield County Road
& Bridge Department stating one is not necessary? You can contact the Road & Bridge
Department at 625-8601.
Yes iC No
34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number of the person performing the work will be
required at time of applicable inspection.
Yes x No
35. Are you aware, that on the front of the Building Permit Application you will need to fill in
the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal
of a building p t application? Your attention in this is appreciated.
Yes No
36. Do you know that the local fire district may require you to submit plans for their review of
fire safety issues? Yes k No (please check with the
building department about this requirement)
37. Do you understand that if you are planning on doing any excavating or grading to the
property prior to issuance of a building permit that you will be required to obtain a grading
permit?
Yes
Ih e
/.
Signa '�f I wner
owledge that I have read, understand and answered these questions to the
ility.
54/06
Date
Phe: a4, 0 - lB aa. (days); (evenings)
Project Name:
Project Address:
S3 R R 04 • Cr .C.c
Notes: If you have answered "No" on any of the questions, you may be required to provide this
information at the request of the Building Official prior to beginning the plan review process.
Delays in issuing the permit are to be expected. Work may not proceed without the issuance of a
permit. If it is determined by the Building Official that additional information is necessary to review
the application and plans to determine minimum compliance with the adopted codes, the application
may be placed behind more recent applications for building permits in the review process and not
reviewed until required information has been provided and the application rotates again to first
6
BATTLEMENT MESA SERVICE ASSOCIATION
ARCHITECTURAL COMMITTEE APPLICATION & CHECKLIST
(Short Form for Repainting, Landscaping or other Minor Projects Only)
Homeowner: U\ O n¢-1-`1(iat \C
3
Home Mailing Address:
Clckr 1<
• s
Home Phone: Ck1i)•-Z8,S-q1 S2 S' Work Phone(ifdesired): 9-10--ZtoC-1 32 Z
Project Address:33"- , Lot: l S Block: Z Subdivision: -tAl(,it.z„_4-- c, -1/4C._
Submittal Date: L\\Lk\liG Estimated Start Date:`7\2UACL.EstimatedCompletion Date: jl3010(n
PLEASE PROVIDE A DESCRIPTION OF THE PROPOSED PROTECT WORK ITEMS THAT ARE
INCLUDED IN THIS SUBMITTAL APPLICATION:
1. CCA1P r
3.
4.
5.
SUBMITTAL REQUIREMENTS: Two copies each of items 1, 2 & 4 need to be submitted.
(Check off items attached to the Application and fill in the spaces as indicated.)
X
1. Site Plan Drawing (1” = 10' or 1" = 20' scale) with the following information shown:
Lot, Block and Subdivision Name.
Street Address of the Project.
Building setback Lines (also fill in the shortest distance between property line to the exterior wall closest to that
property line):
Dwelling Unit Garage
Front Setback: 1\31,A feet
Lett Side Setback: feet
Right Side Setback: feet
Utility Easements.
55' Clear Site -Line at Intersection ofComer Lots.
Placement Location for Outbuildings, Patios, Patio Covers, Decks, etc.
2. Architectural Drawings (I/4" = For 1/3" = 1' scale) with the following information shown:
Outbuildings indicating dimensions, elevations and overall height to ridge line.
_ \ Patio and Deck Cover construction details and dimensions.
3. Exterior Materials (Ell in the selections below):
Roofing Material: •C\ htYe-
Primary Siding Material:
Accent Siding Material:
Color: Swblca./rocI
Color:
Color:
feet
feet
feet
Trim Material: LOCO C Color: W h L,
Masonry Material: Color:
Stucco Material: Color:
Front Door Material: Color:
Garage Door Material: Color:
Color sample needs to be at least 5" x 6". Stucco color should be on stucco sample with texture.
COLOR SAMPLE COLOR SAMPLE COLOR SAMPLE
COLOR SAMPLE
COLOR SAMPLE COLOR SAMPLE
4. Landscape/Irrigation Plans with the following information:
N
kifY Planting Plan (indicate areas of irrigated lawn, tree placement, shrub beds, groundcover, etc.).
Plant material Listing by species of trees, shrubs and grasses.
Groundcover Materials including weed control bather.
5. Fences with the following information:
Location.
Height.
Materials of Construction and Style.
6. Other Improvements (decks, patios, site lighting, flag poles, etc.).
7. Variance Request (if Applicable). Give details below.
I/We hereby acknowledge that Home Remodel or Improvement Projects or Landscape Construction
features which are built in non-conformance with this full application, including the Conditions of
Approval noted on Page 5 of 5 herein, I/We will be cited by the BMSA /AC in written citation form at the
time of discovery. In extenuating circumstances a Variance may be requested from the BMSA/AC,
provided such Variance request item is within the purview and approval jurisdiction of the BMSA/AC.
If a Variance is not granted by the BMSA/AC and if the Non -Conforming Item(s) are not corrected within
60 days after the date of written citation, I/We will be served Notice of a Hearing before the BMSA Board
Adopted and Effective December 20, 2005
of Directors, and if I/We are found in violation of these Non -Conforming Items at the Hearing I/We will
be fined a minimum of 5500.00 per Non -Conforming Item. Notwithstanding the foregoing, I/We
acknowledge that the BMSA Board of Directors and/or Architectural Committee may pursue any legal
remedy available in the event of a non-compliance.
Failure to pay fines levied as determined at the Hearing may also result in a Lien being placed on your
property or a litigation process initiated by the BMSA Board of Directors to secure conformance with this
full Application and its respective Conditions of Approval.
I/We understand that Architectural Committee approval does not constitute approval of the local building
department, drainage design or structural soundness, nor does it constitute assurance that the plans
comply with all applicable codes, regulations, ordinances and Taws.
IJWe further acknowledge that any subsequent field changes which I/We may desire for my/our Home
Construction or Improvement Projects orLandscapingProjects of this original Application Submittal and
the original Conditions of Approval issued by the BMSAJAC will require an additional Revised
Application Submittal on my/our behalf, and thatl/We will not proceed with any subsequent field changes
until a Revised Conditions of Approval have been issued to me/us by the BMSA/AC.
Applicants Signature:
Applicants Printed Name:
1 ,Ocki ,c-3?• Cc —L
Date of Application: Lk\ \LAD)o
.♦doped and Effective April 16.7002
This portion of the Application Form is to be completed by the
Architectural Committee (not the Applicant).
CONDITIONS OF APPROVAL or DISAPPROVAL
No sitework or building construction may proceed on any Lot (including no preliminary site clearing,
grubbing, grade alteration, storing of material, foundation excavation, extension of underground utilities,
etc.) until the Project has received a Project approval from the Architectural Committee and has been
issued a Building Permit (as required by Garfield County for new home or Renovation projects).
All general building and site improvements construction for any Project shall be completed no later than
one (1) year after the issuance date of this Architectural Committee Approval.
3. The complete landscaping and revegetation of the improved Lot, to specifically include the front side and
rear yard areas, shall be completed no later than six (6) months from the date of the Certificate of
Occupancy.
4.
5.
6.
7.
Completion Date
Required By
Architectural Committee
Application Approval (Initials of Ambit tural Com e Member
By:
y
Application Appr ed fostruction su ' to the above conditions: )_/ 9_O'
By Chairman: r C nDate: `9
Application Denied (Initials of Architectural Committee Members):
By:
Application Denied for reason(s) stated above:
By Chairman: Date:
Adoped and Effective April 16 2002
BATTLEMENT MESA SERVICE ASSOCIATION
ARCHITECTURAL CONIMI I I ltE APPLICATION SUBMITTAL FORM
(Short Form for Repainting, Landscaping or other Minor Projects Only)
INSTRUCTIONS:
This Application & Checklist is to be used for all project submittals to the Battlement Mesa Service
Association Architectural Committee (BMSA/AC). This form is intended to assist in ensuring that the
application submittal is complete. This will help provide a quicker, more thorough review process.
It is recommended that each Applicant thoroughly review the requirements of the current Architectural
Standards, the Amended and Restated Declaration of Covenants (including Resolutions) and the recorded
Final Plat for their respective neighborhood prior to preparing a submittal.
Applicants preparing a submittal should compare the information they are about to submit with the
requirements of this form and "check off" each required item on the form. If any item is not checked, the
Application submittal is not complete and should not be submitted. Incomplete Applications will not be
processed and will be returned to the Applicant.
In addition to the checklist, Applicants should fill in all of the places on the Application Form where
information is requested. The Architectural Committee will use this information in evaluating your
Application. If information is requested but is not applicable to your specific project submittal, write
"N/A" in the space provided. If some required information is yet to be determined (such as exterior paint
colors you may not have yet selected) write "TBD" in the appropriated space provided. You will then be
required to make a follow-up submittal with these selections at a later date but before installation in the
home.
DO NOT fill in any information in the "Conditions for Approval" section of this form. This portion of
the form is for Architectural Committee use only.
When an Application is complete, please mail or deliver it to the following address:
Battlement Mesa Service Association
Architectural Committee Application
73-G Sipprelle Drive
P.O. Box 6006
Battlement Mesa, Colorado 81636
The Architectural Committee meets twice monthly on the 1" and 3rd Wednesday, and Applications are due
one week prior to the Scheduled Meeting Dates for prior review by Committee members. Please contact
Jane Chapman at (970) 285-9740 to confirm the next scheduled meeting date or to request further
information.
We thank you in advance for your cooperation and in complying with the Architectural Standards of the
Battlement Mesa Service Association.
.4doped awl Effective-Ipri116. 2002
I
o
9
i
00 r
r
xi 0
0 omN
N m "e.
I. iFc m�
0
•
Lr
yy
r -r
Lr
__
0
°'�=_
0 lo= z
yrn
W-Z�4f
z
0
ONI100J JOON
00 00
cm.
eRR
9s
a
2=8
id
3'-0"
ala
m N m
0o0a 8p
=
oz -ub
%8N2 2
vmnz
m
n
N
•
0
4Vd 31383NO3 .tlx.t!
2'd 0Lb£b8£0L6i:01 92LLS1720L6 1SlaI03dS N9IS30:WOld £17:60 9002-9-Nnf