Loading...
HomeMy WebLinkAboutApplication-PermitGarfield County Building & Sanitation Department 108 8"' Street, Suite #401 Glenwood Springs, Co. 81601 Office- 945-8212 Inspection Line- 384-5003 �„ , _ „ Dk Q �0 9 _ f �. `x" 4 yI -6 9-oas Job Address ( Y MP 3g Nature of Work Building Permit(4-(2-6-6441" c Use of Bui[dtn NO. 99 a1 Owner > ��V�C 1 - Contractor Amount of' Permit $ 5-30 • o 6 it41Mki -t- 110 , drE) Date LitYl Clerk �, ado 6 GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 8th Street, Suite 201, Glenwood Springs, CO 81601 � Phone: 970-945-8212 / Fax: 970-384-3470 / Inspection Line: 970-384-5003 j permit No.' (/a,( Parcel/Schedule No. K800352 I/ ! v /p2 4Oq O` r / J o9-� Job Address 17 Black Sulphur Place, Parachute CO 81635 1 Lot No 05 Block No: 09 Subd / Exemption Taman t 4Un4 k Meadows • thc+ F f n_ 2 Owner- Cimarron Land & Homes Address. 17 Black Sulphur Place, Parachute Ph 285-7330 I, Wk Ph• 285-733 3 Contractor Cimarron Land & Homes Address: 73 Sipprelle Dr/Ste E3, Parachute Ph 285-7330 Lic No 4 Architect / Engineer. Greg Robson Address: 73 Sipprelle Dr/Ste E3, Parachute Ph 285-7330 Lic.No 5 Sq. Ft Of Building: 1369 Sq. Ft Of Lot. 8870 Height 14' No of Floors One 6 Use of Building: Single FaputbDwe In n 4, ` L k y ii, n 4rv.._ „re eciakset cAi/., Y1t 7 Describe Work: FountoCtion, Set odul r, Attach Garage, Site Concrete, Landscape r 8 Class of Work ® New 0 Alteration 0 Remove 0 Addition 0 Move 9 Garage 0 Single Carport 0 Single ® Double 0 Double 10 ® Driveway Permit ® On -Site Sewage Disposal ® Site Plan 11 Valuation oofJUWork $ Adjusted Valuations $ i�/ , ) 1 12 Special Conditions / Al (-� (1 y.L„� f i1 NOTICE Plan Check Fee Permit Fee A SEPARATE ELECTRICAL PERMIT 1S REQUIRED AND MUST BE ISSUED BY THE STATE OE COLORADO ,yyt� j ZO a �Z fr2� THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION v� AUTHORIZED 15 NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION Total Fee Date Permit Issued OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ^' ANY TIME AFTER WORK IS COMMENCED 530,040 +L� 00 93°. oc 1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND I KNOW THE SAME TO BE TRUE AND CORRECT ALL PROVISIONS OF OCC Group. Const Type LAWS GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITHIN, /Q WHETHER SPECIFIED HEREIN OR NOT THE GRANTING OF A PERMIT DOES Rb NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE 1( Jam. .fL\ PROVISI• NS OF ANY OTHER STATE OR LOCAL LAW REGULATING Zoning. Setbacks. CONS 110 OR TH O'NCE OF CONS U N (��,��iri,� �i� 4 0, 0 SI ;o'iW ,O a' DATE wt nu Home (SDS No Br Fee , ` - 5-1 �` , �� a BLDG DE PING DEPT APPROV • • TE APPROVAL /DATE i ,azwee9 AGREEMENT PERMISSION 15 HEREBY GRANTED TO THE APPLICANT AS OWNER CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT IN CONSIDERATION OFTHE ISSUANCE OFTHIS PERM IT, THE SIGNER HEREBY AGREES TOCOMPLY W TTH ALL BUILDING CODES AND LA ND USE REGUI ATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN1N30 28 201 CRS AS AMENDED THE SIGN ER FURTHER AGREF, TH AT IF THE ABOVESA ID ORDINANCES ARE NOT FULLY COMPLIED WITHIN THE LOCATION, ERECTION, CONSTRUCTION AND USE OFTHE ABOVE DESCRIBED STRUCIUR E. THE PERM R MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THIN AND THERE IT SHALL BECOME NULL AND VOID ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFIC I AI FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS. SPECIFICATIONS AND OTHER DATA OR FOR PREVENTING BUILD( NG OPER ATI ( iN BEING L A RR I ED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION THE REVIEW OF SUBMITTED PLANS ANDSPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUT E AN ACC EPTANCE. OF AN Y RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURWG CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT. DESIGNER, BUILDJR AND OWNER COMMENTS ARE INTENDED TO BE CONSERVATIVE ANT) IN SUPPORT OF THE OWNERS INTEREST Garform 003 1 HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL) ttd/0G t ,408-.ai (Cot (3qe The following items are required by Garfield County for a final inspection: L , A final Electrical Inspection from the Colorado State Electrical Inspector. 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road. 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non- absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing. 4. All bathrooms must be complete with wash bowl, tub or shower, toilet stool, hot & cold running water, non-absorbent floors and walls finished and a privacy door. 5. All steps outside or inside over three (3) steps must have handrails, guardrails on balconies or decks over 30" high constructed to all IBC and IRC requirements. 6. Outside grading done to where water will detour away from the building. 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e., weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made. 8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, anchor State Agencies where applicable. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a Certificate of Occupancy for the dwelling under building permit # R 5a_i c{Io(o (oce Signature Date BpcontOct2004 PLAN REVIEW CHECKLIST ApplicanQDate 5—IG 040 Building ineered Foundation Driveway Permit purveyed Site Plan yf</ Septic Permit and Setbacks rade/Topography 30% _./sttta Residential Plan Review List Min m Application Questionnaire Subdivision Plat Notes yekFire Department Review Valuation Determination/Fees ed Line Plans/Stamps/Sticker ,---A1 Conditions c_-1 iication Signed rfan sewer To Sign Application Parc chedule No. 40# Snowload Letter- Manf. Hms. 44 Soils Report GENERAL NOTES: 13 (e4 r 7 1 12,321 40o s tt 7200 l9,fzl Planning/Zoning Property Line Setb 30ft St r Setbacks Flo•. Plain B ilding Height ning Sign -off oad Impact Fees HOA/DRC Approval Grade/Topography 40% Planning Issues Subdivision Plat Notes 1. Is a site plan included that identifies the location of the proposed structure or addition and distances to the property lines from each corner of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Properties with slopes of 30% or more must be shown on site plan. (NOTE: 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes X 2. Does the site plan, when applicable, include the location of the I.S.D.S. (Individual Sewage Disposal System) and the distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamp on the design. Yes X 3. Does this site plan include any other buildings, setback easements and utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution if the property you are applying for a building permit on is located on a corner lot. Special setbacks do apply. Yes X 4. Does the site plan indicate the location and direction of the County or private road accessing the property? Yes X 5. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? A floor plan of the modular unit showing exterior doors is required. Yes X 6. Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? The building permit application will not be accepted without it. Yes X No 7. Will this be the only residential structure on the parcel? Yes X No If No, Explain 8. Have two (2) complete sets of construction drawings been submitted with the application? Yes X 2 9. For the placement of a manufactured home, have the following been specified? The size of the unit (min. 20ft x 20ft); live roof load (min. 40# could be more depending on elevation of property); wind design (min. wind speed of 90 mph); foundation design; method of anchoring? Yes X 10. Have you designed or had this plan designed while considering building and other construction code requirements? Yes X No 11. Do your plans comply with all zoning rules and regulations in the County rela ted to your zone district? Yes X No 12. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes X No 13. Do you understand that approval for design and/or construction changes are required prior to the application of these changes? Yes X No 14. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit Fee" as well as any "Road Impact" or "Septic System" fees required, at the time you pick up your building permit? Yes X No 15. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003. Yes X No 16. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re -inspection fee? Yes X No 17. Are you aware that you are required to call for all inspections required under the IRC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes X No 3 18. Are you aware as part of the submittal for a building permit, you are required to show proof of a driveway access permit from Garfield County Road & Bridge Department or if applicable the State Highway Department? If a permit is not necessary, then a letter stating that information is required. You can contact the Road & Bridge Department at 625-8601 or refer to the phone book for the State Highway Departments number if applicable. Yes X No 19. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups unless you, as the homeowner are performing the work? The license number of the person performing the work will be required at time of applicable inspection. Yes X No 20. Are you aware that on the front of the Building Permit Application , you will need to fill in the Parcel/Schedule Number for the lot you are applying for this permit on prior to the submittal of a building permit application? Your attention in this is appreciated. Yes X No 21. Are you aware that you will need to have your installer obtain an installation inspection as per the State Division of Housing requirements prior to the County building department doing their final inspection? The state will charge a fee for this inspection. Yes X No 22. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an agent and that the party responsible for the project must comply with the Uniform Building Code? Yes X No 23. Are you aware, that if you receive your water and/or sewer from an Association, a District or Municipality, you will be required to provide the County with a copy of the Tap Permit (or evidence of an exemption) at the time of the building permit application submittal? Yes X No 24. Do you understand that if you are planning on doing any excavation or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit? Yes X 4 I hereby acknowledge that I have read, understand and answered these questions to the best of my ability. 1/4442- 4-1 local 0 (c Signature of Owner Date Phone: (970) 285-7330 (days) N/A (evenings) Project Name: Cimarron Land & Homes Project Address: 17 Black Sulphur Place, Parachute CO 81635 Notes: If you have answered "No" on any of the questions, you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If it is determined by the Building Official that additional information is necessary to review the application and plans to determine minimum compliance with the adopted codes, the application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction. bpminregmhFeb2005 5 BATTLEMENT MESA SERVICE ASSOCIATION ARCHITECTURAL COMMITTEE APPLICATION & CHECKLIST (for New Home Construction projects) Homeowner: _Cimarron Land & Homes, LLC Home Mailing Address: _ 73 Sipprelle Drive / Suite E3, Parachute CO 81635_ Phone: _(970) 285-7330 _ Project Address: _17 Black Sulphur Place Lot: _05 _ Block: _09_ Subdiv: _Tamarisk Meadows_ Production Home Plan Name (if applicable): _Skyline Manufactured Home Plan "Madison" Spec_ Homebuilder: Cimarron Land & Homes, LLC. Business Mailing Address: 73 Sipprelle Drive / Suite E3, Parachute CO 81635 Business Phone: (970)-285-7330 Fax (if desired): (970)-285-7303 Submittal Date: _03/31/06_ Estim. Start Date: _05/01/06_ Estim. Completion Date: _07/31/06_ SUBMITTAL REQUIREMENTS: Two Copies each of items 1, 2 & 4 need to be submitted. (Check -off items attached to the Application. Fill in spaces as indicated.) X 1. Site Plan Drawing (1" = 10' or 1" = 20' scale) with the follow' formation shown: X Lot, Block & Subdivision name. X Street Address of Project. X Building Setback Lines (also fill-in the shortest distance between property line to the exterior wall closest to that property line). Please be aware that all Building Setback Lines are taken from your Property Line Pins!! Your Property Line is NOT the Curb Line!! Dwelling Unit Garage Front Setback: _38'-0"_ 18'-0" Left Side Setback: _n/a 12'-2" Right Side Setback: _9'-0"_ n/a Rear Setback: 46'-6" n/a X_ Utility Easements. n/a 55' Clear Site -Line at Intersection Corner Lots. X Site Grading Elevations & Drainage. X_ First (main) Floor Height in relation to top of street curb at front -center of lot. X_ Driveways (including width of driveway), Walkways, Patios, etc. n/a Outbuildings. Page 2 of 6 X 2. Architectural Drawings (1/4" = 1' or 1/8" = 1' scale) with the following information shown. X Floor Plan(s) with overall dimensions (fill-in the following square foot areas). n/a_ n/a n/a_ First Floor Finished Living Area: Second Floor Finished Living Area: Lower Floor Finished Living Area: Total Finished Living Area: 1369_square feet _n/a_ square feet _n/a_ square feet _1369_square feet Total Unfinished Living Area: _n/a_ square feet Garage Area: 400_ square feet Building Elevations Plans indicating doors, windows, exterior materials, building height, roof pitch, roof -mounted evaporative coolers, etc. (Std. manuf. home plan on file.) Maximum building height to highest ridge line or building structural projection _14_ feet above top of street curb at front -center of your lot. Engineered (stamped) Foundation Plan. (Std. manuf. home foundation plan on file.) Outbuildings indicating dimensions, elevations and overall height to ridge line. X 3. Exterior Materials (fill-in the selections below): X_ X_ X_ X_ n/a n/a X X_ Roofing Material: _3 -Tab Comp. Shingle_ Primary Siding Material: _Vinyl Lap_ Accent Siding Material: _Vinyl Shutters_ Trim Material: _Vinyl_ Masonry Material: _n/a_ Stucco Material: n/a Front Door Material: Insulated Steel Garage Door Material: _Steel Overhead Door_ BODY COLOR Color: _Gray_ Color: _Gray_ Color: Green Color: White Color: n/a Color: n/a Color: Pre -Finished White Color: Pre -Finished White TRIM COLOR ACCENT SHUTTERS (WHITE) Page 3 of 6 X 4. Landscape/Irrigation Plans with the following information: n/a_ X Planting Plan (indicate areas of irrig. lawn, tree placement, shrub beds, ground cover, etc). X_ Plant Material listing by species of trees, shrubs and grasses. X_ Groundcover Material with weed control barrier. n/a Fences. n/a_ Other Landscape Improvements (decks, site lighting, flag poles, etc.). 5. Variance Request (if applicable) Give details below: X 6. Residential Construction Monetary Deposit: (Existing pre -paid deposit by CLH.) I/We hereby acknowledge and understand that our failure to complete Home Construction, Improvement Projects or Landscaping Construction within the time constraints noted in Conditions 2. & 3. On Page 6 of this Application will result in a Notice and Opportunity for a Hearing before the BMSA Board of Directors. If I/We are found in violation of these Conditions at the Hearing it will result in a fine to the Owner of not less than $500.00 per month for each full month in excess of the allotted completion time frame. I/We hereby acknowledge that Home Construction or Improvement Projects or Landscape Construction features which are built in non-conformance with this full application, including the Conditions of Approval noted on Page 6 of 6 herein, I/We will be cited by the BMSA/AC in written citation form at the time of discovery. In extenuating circumstances a Variance may be requested from the BMSA/AC, provided such Variance request item is within the purview and approval jurisdiction of the BMSA/AC. If a Variance is not granted by the BMSA/AC and if the Non -Conforming Items are not corrected within 60 days after the date of written citation, I/We will be served Notice of a Hearing before the BMSA Board of Directors, and if I/We are found in violation of these Non -Conforming Items at the Hearing I/We will be fined a minimum of 5500.00 per Non -Conforming Item. Notwithstanding the foregoing, I/We acknowledge that the BMSA Board of Directors and/or Architectural Committee may pursue any legal remedy available in the event of a non-compliance. Page 4 of 6 Failuie to pay fines levied as determined at the Hearing may also result in a Lien being placed on your Property or litigation Process initiated by the BMSA Board of Directors to secure conformance with this full Application and its respective Conditions Of Approval. I/We understand that Architectural Committee approval does not constitute approval of the local building department, drainage design or structural soundness, nor does it constitute assurance that the plans comply with all applicable codes, regulations, ordinances and laws. I/We further acknowledge that any subsequent field changes which I/We may desire to the Home Construction or Improvement Projects of this original Application Submittal and the original Conditions of Approval issued by the BMSA/AC will require an additional Revised Application Submittal on our behalf, and that I/We will not proceed with any subsequent field changes until a Revised Conditions of Approval have been issued to us by the BMSA/AC. Owner's Signature(s): igt04_ a.562, Owner's Printed Name(s): _William Wilde Builder's Signature: Builder's Printed Name: Date: 313' loCe William Wilde, Manager_ Date: 3I3 l ` o(e Page 5 of 6 This portion of the Application Form is to be completed by the Architectural Committee (not the Applicant). CONDITIONS OF APPROVAL or DISAPPROVAL 1. No sitework or building construction may proceed on any Lot (including no preliminary site clearing, grubbing, grade alteration, storing of material, foundation excavation, extension of underground utilities, etc.) until the Project has received a Project approval from the Architectural Committee and has been issued a Building Permit (as required by Garfield County for new home or Renovation projects). 2. All general building and site improvements construction for any Project shall be completed and shall have issued a Certificate of Occupancy from the Garfield County Building Department no later than one (1) year after the issuance date of this Architectural Committee Approval. 3. The complete landscaping and revegetation of the improved Lot, to specifically include the front, side and rear yard areas, shall be completed no later than six (6) months from the date of the Certificate of Occupancy. 4. If the selection of colors and /or landscaping plans are not included with this application they must be submitted for approval before any action is taken to install the missing items. 5. 6. Completion Date 7. Required By Arohitootural Committee "7— 921—O& Application Ap royal(Init. of Architect al Committte� bers)f `sn By: D� Application App ved for onstruction ' Eto the above conditions: By Chairman: AGt.c !`7 Application Denied (Initials of Architectural Committee Members): By: Date: y - � O Application Denied for reason(s) stated above: By Chairman: Date: Page 6 of 6 HOME URED SALES ORDER 44340 1 CIM 2211 9(YLINE )-NES 171 SOLD CIMARRON LAND & HOMES LLC TO: 363 COUNTY ROAD 251 RIFLE, CO 81650-9030 la SKYLINE CORPORATION 920 W. SECOND P.O. BOX 311 HALSTEAD,KS 670560311 (316)835-2214 FINANCED BY: Approval NoJFarne rloorgan A221CTG CAD -Axton! date // Casaba ober In CASHIERDEL PRODUCT NAME - LODE NO HILLCREST 119 SHIP TO: CIMARRON LAND & HOMES LLC 73 SIPPRELLE DRIVE STE F-3 PARACHUTE. CO 81635-92 &ICES S: DOM Har Saimaa! CONVOY CARRIER Cost. Order No. Order Date RSSeranoe No. 15838 A221 -CTG SO a 1a' SD' it 14' 4CIK 28 Sirs 6O' 2 2r Insulation Wan Who WaII Flocs Aesl Lao 40 _dmaM,r,n w/a..n..e.:er..asaim. TECHNICAL INFORMATION R-Vaare afavalwa. Trin Type 8-118' Cellulose 6' Fiberglass 8" Frola% ERRS Zone Best Zone ZONE 1, 15 PSF 3 R-30 R-19 R-19 H.UD. Cmlekaaun V41 Nwnbpp) ICING WHITE VINYL_ Ve INT. PANEL PANEL COUNTER TOP SANDSTEIN QUARTZ L TILE 9238 !el CARPVING ANCHORAGE BEIGE TWIL "cm. PANEL mammy PFOAK/OAK STILES COUNTER TOP SANDSTEIN QUARTZ FI _Tao 993R/BEIGF TWIT L NTER TOP SANGSTEILLQUARTZ TILE_ 9218 APP SMOOTHTOP PKG O13& QMIT PBAPES & BUNOS PRELIMINA 17 Black Sulphur Place Lot 5 Block 9 Tamarisk Meadows Garfield County Application for Driveway Permit Passe Obis ilag Pak GTh tn= Ind sad Hass Permit Mather: Gfd06-D-26 Apple/km Date: 3/23/2106 Tenalraiaa Dae: 443/2006 Cent, Road Number: 374 k Distil* a Impeder: Jake Mall hereby reqs permission end authority frau the Bond of Carry C mnissioners to construct a driveway approach (es) on the right-of-way off of Coity Road, 374 At Aare w at 17 mart Sulphur Pbee, located m the gr.tk side of rod for the purpose of obtaining access to property. Applicant submits herewith for the considerate mod approval of the Board of Catty Ca3pryiniogws, a sketch of the proposed innfladan showing all the necessary specification detail velndiag: 1. Frontage of lot along road. 2. Distance from centerline of road to property lime. 3. Number of driveways requested 4. Width of proposed driveways and angle of approach. 5. Distance from driveway to road intasaedoo, if any. 6. Size and shape of area separating driveways if more than one approach. 7. Setback distance of building(s) and other stractere improvements. 8. No unloading of equipment on county road, say damapu canted to county road will be repaired at subdivision 9. Responsible for two years from the den of completion. fanticaLbsibiat 1) The applicant represents ell parties in interest, and affirms that the driveway approach (es) is to be constructed by him for the bona fide purpose of sawing access to his property and not for the purpose of doing business or servicing vehiola on the road right of way. 2) The applicant shall flints all labor and materials, perform all work, and pay all costs is 000nection with the construction of the driveway(s). All work shall be completed within thirty (30) days of the permit date. 3) The type of construction shall be as designated sod/or approved by the Board of County Commissioners or their repromotstive and all materiels used shall be of setisfictary gaeliy tad subject to inspection end approval of the Board of County Committionen or thus repeamtative. 4) The traveling public shall be protected daring the installation with proper warning signs and signals and the Board of Couany Ccamissioaas and their duly appointed agents and anployee dell be held harmless against any action for pastel Sty or property rage sustained by any mason of the stein of the Permit. 5) The Applicant shall assume responsibility for the removal or tante of snow, ice, or sleet upon any portion of the driveway approach (a) even though deposited on the driveway(s) in the course of the County snow removal 7.a qexia ROaINO GW IIVOd LL989?9 tic:le 9001/EL/E0 Date Issued 3/23/06 Connect Permit , 20 Permit # CO2 -5164 ❑—Biiitemeain 'Mesa Conso7idid"Melropolitn Issued to: Cimarron Land & Homes, LLC U Home Owner 0 Contractor Address: 73 Sipprelle Drive Ste E3, Parachute CO 81635 Type of Connection: 0 WATER 0 SEWER ❑ OTHER Describe Other: Service Address: 17 Black Sulphur Place Permit Fee $ 50.00 The permit fee covers the cost of ONE trip to inspect all services indicated above. If more than one inspection trip is required, they will be billed at $35.00 per inspection. Plans must be submit- ted to the District for approval prior to this permit being issued to insure compliance with District Rules and Regulations. Connections and installations must be In accordance with the approved plans. The District requires a 24 hour notice for all Inspection (excluding weekends and holidays). No inspections will be performed on weekends or holidays. All connections and lines must be fully exposed for Inspec- tions. All service connections must be inspected and approved prior to the District providing water and sewer services. Customer Signature Date Initials COUNTY OF GARFIELD - BUILDING DEPARTMENT CORRECTION NOTICE 108 8th St., Suite 201 Glenwood Springs, Colorado Phone (970) 945-8212 Job located at /7 cif Se.�i� Permit No. 7? Z / I have this day inspected this structure and these premises and found the following corrections needed: r Q :% , `' prarlf ate- 4( on 4„tta q, .,� /Ciro . 2 a 50.00 =441at` S ,ineatt -64 11,42.4 nrCZni ligerntarie� You are hereby notified that the above correction must be inspected before covering. When correction(s) have been made, call for inspection at 970-384-5003. Date 6-626-06 20 Building Inspector Wu� 7nai-ri+r/i Phone (970) 945-8212 N. _ 9 (9, - Job Job Add pss Assessors Parcel No0°C( / - . I 'Oli-oQs Date Sin/ BUILDING PERMIT CARD Pa-`-a-ct..S._ �' 1635 17L , i , , , s Meek -9 Krt Owner AMCLII c`(l u �idt)ye a. Address 3 G �a.�e Q 1 E3 hone8 1s at '7 c ovWx--t Address Se -44W ra A ct c Phone # o -?5 "#7-3 ,+ha Contractor Ueihacks: Front Rear RH LH oils Test VGA Footing %- $�J * (� Foundation SigRAttr€ QI 1-20 -CXo19yrt_ Grout Underground Plumbing nom, Rough Plumbing &-29-0& /OIL - Framing Framing Insulation Roofing Drywall Gas Piping C26-06 *C X952-o'oy-V&i} 404 spew Lack (,c)/ 1jQJ INSPECTIONS LINA NOTES Zoning Weatherproofing Mechanical �` c7 Electrical Rough (State) i t/I 2-7:9A(F Electr' al ina State) 6 Q! e44 Final Check i� om e ed? Certificate Occupappcy A .5 V[$ Date is- J -d c. Septic System # Atte . tr e -ate w n �l Date Final Other 1/41n1 C Rg0G0-D-ate (continue on back) INSPECTIONS WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB 24 IlOt RS NOTICE REQUIRED FOR ALL INSPECTION MANUFACTURED HOME 4D d> BUILDING PERMIT ll .� IELD COUNTY, COLORADO .Zoned Area Permit Noe( n Date Issued& /l AGREEMENT In consideration of the issuance of this permit the applicant hereby agrees to comply with all laws and regulations related to zoning, location, construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Official and IMMEDIATELY BECOMES NULL AND VOID. ``4akk.&rat Use m%/VAddress Legal tion l�4a. `,� tractor atalr IGr Own INSPECTION RECORD Footing: (0- p_Dr. tv/7.-6 A, 7_2o•06kiryt_ Foundation or Blocking Driveway : / s- c i /7 Rough Plumbing : , a9_0 knit Gas Piping : 6-.A6-04- n �� / Electrical Final :I lLk4J.2 Qi� 4'06 l0 (by State Inspector) gk y/i/mss 7/____Oipptic Final : { Final : �C,n I ` Y J'' ` Notes: �¢I �,1, ,C VIL I73 6� 1�yva seriaSegl aUntr: 4952-IYact- t114rz THIS PERMIT IS NOT TRANSFERABLE Phone 384-5003 108 8th Street, Suite 201. County Courthouse Plaza Glenwood Springs,Colorado DO NOT DESTRO\ THIS CARD APPROVED /^ //� Date w! 046 (IF PLACED OUTSIDE, COVER WITH CLEAR PLASTIC) 17 Black Sulphur Place Lot 5, Block 9, Tamarisk 2 The Madison 1,369 square feet Cimarron Land & Homes, LLC 04/01/2006 a Battlement Mesa Homes, Inc. 17 Black Sulphur Place Lot 5 Block 9 Tamarisk Meadows standard 3 -tab asphalt composition shingles over one layer of 30* roofing paper 1/16" 0513 roof sheathing engineered manufactured trusses, 3:12 sloped top chord, at 24" o.c. 2 x 4 blocking between trusses, typ. metal drip -edge prefinished metal Fascia over continuous 2 x 4 sub -fascia vinyl soffit (venting), to match soffit on manufactured home 8'-I I/8" (minimum) dbl. 2 x 4 top plate PRE-ENGINEERED RF TRUSS HAVE ENGINEERING FOR INSPECTO AT TIME OF FRAME INSPECTION 416 */� 4o* S" t,R l.9 S J redwood or pressure -treated J 2 x 4 base plate 1/16" 05B sheathing vinyl siding, to match siding on manufactured home 2 x 4 studs at Ib" o.c. foam sill sealer -a NME: Header over garage door (16' wide) is a double 13/4" x 11 T/8" LVL. finished grade, min. 6" below bottom of siding engineered foundation, see Structural drawing STANDARD MAMIFAGNRED HOME GARAGE SECTION 3/4' . I'-0' Battlement Mesa Homes, Inc. P.O. Box 6000 Battlement Mesa, Colorado 81636 (970) 285-7330 SITE PLAN Lot 5, Block 9, First Amended Plat of Tamarisk Subdivision, Filin! ' SCfr z. e �`� // APPROVED Lot 6 DATE AC �EOP�TED CONSTRUCTION 4 0 / `.\ / \ See .. Sir, - 54.0 ,% `: ► ,,:. -Coe or 4k 1-lprlie. (bell -Orr. o P C10...a GSC SIbdb 9.0 oo•4 CL. 91•l EL. leo. CL 6.0 5.0 Lot 4 i RESERVATIONS, RESTRICTIONS, S OF RECORD OR IN PLACE. I)0214 CAT bh&C .. loo. o "G444,4 -set rn-n2-• ESD Irn / / -R. tel.' 1 1 1 1 1 1 1 1 1 N l -to 4. 0w ti 0 a 2 Qo •ebhle„ Sj? 4�e / a • y �y 1.4 O N v 0 0 6> 0 // / // // hig MI Phn 0 380 mob kr 09 o $ot3 'D�o Qt Fin Sofl el 0 ; : 8 co 18 a pbi HPP 0J 1-0100,, c ° O v>0 CI ,4C$ CO co r� P. Vl by NORTH 01 N q1. - LOT >. BLBOt 1 }AMMO( SLBOM9OH CIMARRON LAND & HOMES, LLC 73 SIPPRELLE DRIVE. SURE E-3 BATTLELMENT MESA, CO SITE PLAN 6 '..'.'-".,� 0 C[Y]YBa 1 I �oo���'l• �� .SrH !''1'SP�rnc•, �n�l