HomeMy WebLinkAboutApplication-PermitGarfield County
Building & Sanitation Department
108 8th Street, Suite #201 Glenwood Springs, Co. 81601
Office- 945-8212 Inspection Line- 384-5003
Job Address —3�,-)( `Gl O'er 't' f C Kc v
Nature of Work _ Buildins Permit P1 - ` 4 (:)C) - �Z
NO. QcaOS
_c
se of Buildin
wner
Contractor C. any
Amount of Permit $ &) R. S
Date r ICI 010
Clerk
GARFIELD COUNTY BUILDING PERMIT APPLICATION
108 6-" Street. Suite 201, Glenwood Springs. CO 81801
Phone: 970-945-8212 / Fax: 970384-3470 / inspection Line: 970-384-5003
Permit No: C Phl0S
Parcel/Schedule No: 2181 -0400- a 02 -
AGREEMENT
PERMISSION 15 HEREBY GRANTED TO THE APPLICANT AS OWNER CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT
THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT. THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND
USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30 28.201 CRS AS AMENDED THE SIGNER FURTHER AGREES
THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH EN THE LCOATION, ERECTION. CONSTRUCTION AND USE OF THE
ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME
NULL AND VOID THE ISSUANCE OF A PERMT BASED UPON PLANS. SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL
FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING
BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF 1115 CODE OR ANY OTHER ORDINANCE OR REGULATION OF
THIS JURISDICTION THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE
AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITTES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES THE RESPONSI
BILIN FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT DESIGNER BUILDER.
AND OWNER COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST.
Garfom 003
f HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE IINDIAL)
SH'1(0Ca t cu- " 1 )jSo`i & /10,6(
Job Address:
36730 Rides Franfoye Rci /slew Ca,s+i- CoVbv7
1 Lot No: - . ^ $lock Na• Subd. / Exemption:
jam-.
-�Menge
4
2
Owner '+Lm r
"Moma5 i- Sarah Rumertt
Address 3 67 3 0 RItleV
Pont -age Rd.
Ph: 970.9gy• 2044-
Wk Ph
969-204o
3
Co tractor:
Colonna Const. Corp.
Address:
, 6903 Co. Rb.3ZoAlcic
ph,
(02 5 •3376
Lic No.
_Penile
4
Architect/Engineer: Address:
Ph:
Lir. No.
5
Sq. Ft. o u
Iding:
/y S6
Sq. Ft of Lot
20• y6 gcrc5
Height:
No. of Floors
G
` _
Use of Building
Yr
Commerical Carport v CMQa
7
Describe Work:
Net: ConstYuctron r
u
Class of Work: Jr New ❑ Alteration o Remove
J y Addition J Move
N
10
Garage. ❑ Single
0 Double
Carport: ❑ Single
J Double
0 Dnveway Permit 0 On -Site Sewage
ex a pi pt NIA Disposal
S Site Plan
11
Valuation f Work. S
r7 3i, so
Adjusted Valuations: 5
�°ILOS
12
Special Conditions:
NOTICE Plan Check Fee:
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE
ISSUED BY THE STATE OF COLORADO 2 /. ry1 1 0
Permit Fee:
q8.43
TMS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHLN 180 DAYS. OR, 1F
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED
Total Fee:
6'7 8,g?
Dated Permit Issued:
1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT ALL
PROVISIONS OF ]AWS GOVERNING THIS TYPE OF WORK WILL BE
OCC Group:
`�--� e[[))�� _
l n:
CAj35t., Type:
-(V/_ (((f.., J2
COMPLETED VATHIN WHETHER SPECIFIED HEREIN OR NOT THE
GRANTING OF A PERMIT DOES NO7 PRESUME TO GIVE AUTHORITY
70 VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE
Zoning:
Setbacks:
OF CO ON.
! r
j �� March 0% 06
Manu. Home:
ISDS No. & Fee:
GN •, •• OWNER ` DATE
-_. .1A •-13 o .. A
gG
BLI D: • PLNG DEFT.
•. ;, AL/DATE APPROVAL/DATE
AGREEMENT
PERMISSION 15 HEREBY GRANTED TO THE APPLICANT AS OWNER CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT
THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT. THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND
USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30 28.201 CRS AS AMENDED THE SIGNER FURTHER AGREES
THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH EN THE LCOATION, ERECTION. CONSTRUCTION AND USE OF THE
ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME
NULL AND VOID THE ISSUANCE OF A PERMT BASED UPON PLANS. SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL
FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING
BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF 1115 CODE OR ANY OTHER ORDINANCE OR REGULATION OF
THIS JURISDICTION THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE
AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITTES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES THE RESPONSI
BILIN FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT DESIGNER BUILDER.
AND OWNER COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST.
Garfom 003
f HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE IINDIAL)
SH'1(0Ca t cu- " 1 )jSo`i & /10,6(
1
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold
running water, non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all IBC and IRC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
al] the required items are completed and a final inspection made;
8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, anchor State
Agencies where applicable.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupant , use and t e issuance of a
Certificate of Occupancy for the dwelling under building permit #
Signature
BpcontOct2004
Marcll 17 2006
Date
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
FOR
CONSTRUCTION OF
COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite
the issuance of a permit it is important that complete information be provided. When reviewing
a plan and it's discovered that required information has not been provided by the applicant, this
will result in the delay of the permit issuance and in proceeding with building construction. The
owner or contractor shall be required to provide this information before the plan review can
proceed. Other plans that are in line for review may be given attention before the new
information may be reviewed after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. Also, please consider
using a design professional for assistance in your design and a construction professional for
construction of your project. Any project with more than ten (10) occupants requires the
plans to be sealed by a Colorado Registered Design Professional.
To provide for a more understandable plan and in order to determine compliance with the
building, plumbing and mechanical codes, applicants are requested to review the following
checklist prior to and during design.
Plans to be included for a Building Permit must be on draft paper at least 18"x 24" and
drawn to scale.
1
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade
and original grade line. A section showing in detail, from the bottom of the footing to the top of
the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and
spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building
material, Engineered foundations may be required. Check with the Building Department.
A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must
be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H.
windspeed, wind exposure B or C, and a 36 inch frost depth.
All sheets need to be identified by number and indexed. All of the above requirements must be
met or your plans will be returned.
All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC.
Applicants are required to indicate appropriately and to submit completed checklist at
time of application for a permit:
Is a site plan included that identifies the location of the proposed structure, additions or
other buildings, setback easements, and utility easements showing distances to the
property lines from each corner of the proposed structure prepared by a licensed surveyor
and has the surveyors signature and professional stamp on the drawing? Slopes of 30%
or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan
for the placement of any portion of a structure within 50 ft. of a property line and not
within a previously surveyed building envelope on a subdivision final plat shall be
prepared by a licensed surveyor and have the surveyors signature and professional stamp
on the drawing. Any structure to be built within a building envelope of a lot shown on a
recorded subdivision plat, shall include a copy of the building envelope as it is shown on
the final plat with the proposed structure located within the envelope.
Yes
2. Does the site plan when applicable include the location of the I.S.D.S. (Individual
Sewage Disposal System) and distances to the property lines, wells (on subject property
and adjacent properties), streams or water courses? This information must be certified by
a licensed surveyor with their signature and professional stamp on the design.
Yes / No Not necessary for this project
3. Are the plans submitted for application review construction drawings and not drawings
that are stamped or marked identifying them as "Not for construction, for permit issuance
only", "Approval drawings only", "For permit issuance only" or similar language?
Yes %' No Not necessary for this project
4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a
Colorado Registered Engineer?
Yes No Not necessary for this project X
5. Does the site plan indicate the location and direction of the State, County or private road
accessing the property?
YesX
6. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?
Yes )( No Not necessary for this project
7. If the building is a pre-engineered structure, is there a stamped, signed engineered
foundation plan for this building?
Yes No Not necessary for this project X
8. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes No Not necessary for project X
9. Do the plans indicate the size and location of the ventilation openings for the attic, roof
joist spaces and soffits?
Yes X No Not necessary for this project K
10. Do the plans include design loads as required under the IBC or IRC for roof
snowloads, (a minimum of 40 pounds per square foot in Garfield County)?
Yes X No Not necessary for this project
11. Do the plans include design loads as required for floor loads under the IBC or IRC?
Yes No Not necessary for this project )(
12. Does the plan include a building section drawing indicating foundation, wall, floor, and
roof construction?
Yes X No Not necessary for this project
13. Is the wind speed and exposure design included in the plan?
Yes X No Not necessary for this project
14. Does the building section drawing include size and spacing of floor joists, wall studs,
ceiling joists, roof rafters or joists or trusses?
Yes X No Not necessary for this project
3
15. Does the building section drawing or other detail include the method of positive
connection of all colunnns and beams?
Yes No Not necessary for this project X
16. Does the elevation plan indicate the height of the building or proposed addition from the
undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or
the top of a flat roof? (Check applicable zone district for building height maximum)
Yes )C No Not necessary for this project
17. Does the plan include any stove or zero clearance fireplace planned for installation
including make and model and Colorado Phase II certifications or Phase II EPA
certification?
Yes No Not necessary for this project )(
18. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the IBC or IRC?
Yes No Not necessary for this project X
19. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the IBC or IRC?
Yes X No Not necessary for this project
20. Does the plan include a window schedule or other verification that windows provide
natural light and ventilation for all habitable rooms?
Yes y No Not necessary for this project
21. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used
as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub
enclosures and specify safety glazing for these areas?
Yes No Not necessary for this project X
22. Do the plans include a complete design for all mechanical systems planned for installation
in this building?
Yes No Not necessary for this project X
23. Have all areas in the building been accurately identified for the intended use? (Occupancy
as identified in the IBC Chapter 3)
Yes X No Not necessary for this project it
24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that
may be in use in this building?
Yes No Not necessary for this project X
25., Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes No Not necessary for this project �C
26. Do the plans indicate the location and dimension of restroom facilities and if more than
four employees and both sexes are employed, facilities for both sexes?
Yes No Not necessary for this project X
27. Do the plans indicate that restrooms and access to the building are handicapped
accessible?
Yes No Not necessary for this project
28. Have two (2) complete sets of construction drawings been submitted with the
application?
Yes X No
29. Have you designed or had this plan designed while considering building and other
construction code requirements?
Yes f No Not necessary for this project
30. Does the plan accurately indicate what you intend to construct and what will receive a
final inspection by the Garfield County Building Department?
Yes )( No
31. Do your plans comply with all zoning rules and regulations in the County related to your
zone district? For comer lots see supplemental section 5.05.03 in the Garfield County
Zoning Resolution for setbacks.
Yes No
32. Do you understand that approval for design and/or construction changes are required
prior to the implementation of these changes?
Yes 'C No
33. Do you understand that the Building Department will collect a "Plan Review" fee from
you at the time of application and that you will be required to pay the "Permit" fee as well
as any "Septic System" or "Road Impact" fees required, at the time you pick up your
building permit?
Yes )( No
34. Are you aware that you are required to call for all inspections required under the IBC
including approval on a final inspection prior to receiving a Certificate of Occupancy
and oc\rpancy of the building?
Yes 1 No
5
35. Are you aware that the Permit Application must be signed by the Owner or a written
authority be given for an Agent and that the party responsible for the project must comply
with the Uniform Codes?
Yes K No
36. Are you aware that you must call in for an inspection by 3:30 the business day
before the requested inspection in order to receive it the following business day?
Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday.
Inspections are to be called in to 384-5003.
37. Are you aware that requesting inspections on work that is not ready or not accessible
will result in a $50.00 re -inspection fee?
Yes X No
38. Are you aware that prior to issuance of a building permit you are required to show proof
of a driveway access permit or obtain a statement from the Garfield County Road &
Bridge Department stating one is not necessary? You can contact the Road & Bridge
Department at 625-8601.TaKe Said he Would Coil bui inq cert
Yes No
39. Do you understand that you will be required to hire a State of Colorado Licensed
Electrician and Plumber to perform installations and hookups? The license number will
be required at time of inspection.
Yes )( No
40. Are you aware, that on the front of the building permit application you will need to fill in
the Parcel/ Schedule Number for the lot you are applying for this permit on prior to
submittal of the building permit application? Your attention in this is appreciated.
Yes c No
41. Do you know that the local fire district may require you to submit plans for their review
of fire safety issues? Yes ✓ No (Please check with the
building department about this requirement)
42. Do you understand that if you are planning on doing any excavating or grading to the
property prior to issuance of a building permit that you will be required to obtain a
grading permit?
Yes 'C
I hereby acknowledge that I have read, understand, and answered these questions to
the best of my ability.
Mord) 17 '06
Signature Date
Phone: I8LI-2096 (days)• 981.2010 (evenings)
Colonna Cell 5f,, 311- 87oG 62s-3376
Project Name: Annapurna LLC
Project Address: 3673f O Rluer' iron -1'41e Qd.
Neuf Casfle, CO $1`'/7
Note:
If you answered "No" on any of these questions you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in
issuing the permit are to be expected. Work may not proceed without the issuance of the permit.
*If you have answered "Not necessary for this project" on any of the questions and it is
determined by the Building Official that the information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, please expect the
following:
A. The application may be placed behind more recent applications for building permits in the
review process and not reviewed until required information has been provided and the
application rotates again to first position for review.
B. Delay in issuance of the permit.
C. Delay in proceeding with construction.
*If you answered "No" to this question the circumstances described in the question could result
in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued.
Bpcomm
Feb2005
7
PLAN REVIEW CHECKLIST
Applicant u_ One rd
Building
Engineered Foundation
t-{r\p Driveway Permit
XS,tveyed Site Plan -7 To r
1174. Septic Permit and Setbacks
✓6ade/Topography 30%
fi.A. Attach Residential Plan Review List
/Minimum Application Questionnaire
ate Subdivision Plat Notes
At 'Tire Department Review
✓Valuation Determination/Fees
,Red Line Plans/Stamps/Sticker
✓Attach Conditions
1pplication Signed
Plan Reviewer To Sign Application
arcel/Schedule No.
40# Snowload Letter- Manf. Hms.
GENERAL NOTES:
/45(c 24,zO
Date
Plann/Zooing
Prop rty Line Setbacks
30 Stream Setbacks
F . od Plain
uilding Height
Zoning Sign -off
Road Impact Fees
HOA/DRC Approval
Grade/Topography 40%
Planning Issues
Subdivision Plat Notes
Osage gc ardens
Thomas Er sarah Rumery P.O. Box 993 New Castle, CO 81647
Ph. 970-984-2040 Fax 970-984-2191
Garfield County Building £r Planning
Glenwood Springs, Colorado
Att: Andy Schwaller
Dear Andy
March 17, 2006
Re: Osage Gardens Packing Facility
36730 River Frontage Rd.
New Castle, CO 81647
At this time we are resubmitting plans to comply with the county building code.
These new plans are to cover our walk-in and to provide a dry storage area.
All ADA parking Er sidewalks will be completed as weather permits.
We have hired Colona Construction to do the required work.
We are asking for a variance to move into the main building.
Thank You, Thomas £r Sarah RumeryRumery
No
Job Address ? s 7
Owner
Assessor's Parcel No.2( 2S) - 0641-1:0-a584
- BUILDING PERMIT AR
Contractor FfYVl0. _
Setbacks: Front Rear
Soils Test ''ff
Footing Y-o?.S O /Br'sl
Foundation 5-5 'OGTTb
Grout
Underground Plumbing
Rough Plumbing/
Framing pppp"""��• ����'''�/o ioob 1emyi
Insulation eat4i -14/4L&. 1GP
Roofing
Drywall /0 -10 -0G. /CM -
Gas Piping
Address
Address
RH
Date
niG
INSPECTIONS
NOTES
LH
one #C1V `T "C 4C
one #14- 3-76
Zoning
Weatherproofing
Mechanical
Electrical Rough (State)
Electric F'nal (State) 074A -
Final Po Checklist Completed?
Certificate Occupancy #
Date
Septic System #
Date
Final
Other
(continue on back)
INSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issued4.t14tQ..i