Loading...
HomeMy WebLinkAbout3.0 Permitr 1111 N Ii«'liK411C110.104 CI 11 III Reception#: 742403 02-;'05/2008 01:20:27 PM Jean Alberico - 1 of 3 Rec Fee,$0.00 Doc Fee:0.00 GARFIELD COUNTY CO FLOODPLAIN SPECIAL USE PERMIT for LOTS 2 — 4 OF THE DEANE EXEMPTION LOCATED IN THE %2 OF SECTION 35, TOWNSHIP 7 SOUTH, RANGE 88 WEST OF THE 6TH P.M. EAST OF CARBONDALE, CO In accordance with and pursuant to Section 6.00 of the Garfield County Zoning Resolution of 1978, as amended, and Resolution No. 20C 8 - 23 of the Board of County Commissioners of Garfield County, State of Colorado, the Chairman of the Board of County Commissioners hereby authorizes the following activity: The construction of single-family dwellings and ISDS within approved building envelopes as shown on Lots 2, 3, and 4 of the Deane Exemption Plat within the 100 year floodplain This Special Use Permit is issued subject to the conditions set forth in Exhibit A (attached hereto), and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Zoning Resolution, Subdivision Regulations, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. BOAR.Li' OF COUNTY COMMISSIONERS GARF LD CO TY COLORADO ATTEST Cha' } my Clerk 11I11 k 1+if ',11IIi,N!,L411 ,L011thli47.1411 I0i 11111 Reception#: 742403 02/05/2008 01:20:27 PM Jean Alberico 2 of 3 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO EXHIBIT A 1. That all representations of the Applicant, either within the application or stated at the meeting before the Board of County Commissioners, shall be considered conditions of approval. 2. When substantial construction is complete, the Applicant or future owner of the property shall submit a floodplain elevation certificate to Garfield County Building and Planning Department to verify construction of the first finished floor is at least 1 -foot above the 100 -year floodplain prior to fmal inspection approval and the issuance of a Certificate of Occupancy. 3. That all manufactured homes or those to be substantially improved to be placed within Zone A on a community's FEMA or FIRM shall be installed using methods and practices which minimize flood damage. For the purposes of this requirement, manufactured homes must be elevated and anchored to resist flotation, collapse or lateral movement. Methods of anchoring may include, but are not limited to, use of over -the -top or frame ties to ground anchors. This requirement is in addition to applicable State and local anchoring requirements for resisting wind forces. A manufactured home should be elevated a minimum of one (1) foot above the base flood level and anchored to the elevated foundation. 4. Proper erosion and sediment control measures shall be taken during any site construction disturbance which shall include enclosing the construction envelopes with silt fencing and hay bale check dams. 5. The following uses and activities are prohibited in the Flood Fringe/Flood Prone Areas: a. The development, use, fill, construction, substantial improvement or alteration on or above any portion of the Flood Fringe or Flood Prone Areas which alone, or cumulatively with other activities, would cause or result in the danger of substantial solid debris being carried downstream by floodwaters; b. The storage or processing of materials that in times of flooding are buoyant, flammable, explosive or otherwise potentially injurious to human, animal or plant life; c. The disposal of garbage or other solid waste materials; and d. Any obstruction, which would adversely affect the efficiency of or restrict the flow capacity of a designated floodplain so as to cause foreseeable damage to others. 6. All Individual Sewage Disposal Systems proposed for Lots 2 — 4 shall be located in the respective ISDS enveloped as delineated on this final plat and shall be 1111 F I ',MIlILI,L !,lr4'G011I Ifrli 11111 Reception#: 742403 02/05/2008 01:20:27 PM Jean Alberico 2, of 3 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO engineered by a Professional Registered Engineer within the State of Colorado in accordance to the Guidelines on Individual Sewage Disposal Systems as adopted by the Colorado State Board of Health. 7. Due to the construction of buildings within the flood plain an alternative ISDS design such as a moundable sand filter system will be required to elevate the leeching area above the ground water elevation, flood water elevation, and be prepared in accordance to the Guidelines on Individual Sewage Disposal Systems as adopted by the Colorado State Board of Health. Dosing pumps shall be integrated into each design to ensure that wastewater can be pumped up to the proposed absorption area.