Loading...
HomeMy WebLinkAbout2.0 Staff Report 7.6.10Exhibits for Public Hearing held on July 6, 2010 for a Text Amendment for 1) lnclusion of the Traffic lmpact Fee requirements to Article Vll Standards; 2) Clarifications and amendments to Section 4-5O2 (lmprovements Agreement and Development Agreements); Exhibit Lefrer tA to Z) Exhibit A Proof of Publication B Garfield County Unified Land Use Resolution of 2008, as amended c Garfield County Comprehensive Plan of 2000 D Staff Memorandum dated 0710612010 E Proposed Lanquage for Traffic lmpact Fees F Proposed Language for Development / lmprovements Agleernenle G Resolution Form H I J (D [Lrr, /'l>' ?? - '/- (.,/"r/-h'*rn - : ft, J i/ ,\4 /' l- @ 4 ?7'/// 'frl7 oF*) F- Af f f - z/ t/,-'htfr{,",/ rua1 1a'"4')-) x+/,, itl fy'*/n'/s ( ?-r'c) '' //' )i{f "/ fi^ ?L'i fl f ? t. ,t'r"/"a4 ), tt"e"'t't' 77--/ t \'tl *n4,'a/ mn'lt / '; o c /o'-"ln / Jazz/v 5 -/ k Arl, 1L il," / f'?L flr' /;l RE: TO: FROM: DATE: MEMORANDUM Garfield County Board of County Commissioners / /-, Fred A. Jarman, AICP ( '' Director, Building & Planning Text Amendments to the Unified land Use Resolution of 20008, as amended to include: 1) tnclusion of the Trolfic lmpact Fee requirements to Article Vll Standards; and 2) Clorificotions ond omendments to Section 4-502 (lmprovements Agreement and Development Agreements) July 6, 2010 l. Background & Purpose As expected and anticipated, as Staff has been administering the new Unified Land Use Resolution of 2008 (the New Code), we have identified substantive conflicts, mis-references, typographical errors, unintended timelines, and unantic and regula sions that did not carry over into the New Code from the Zoning Resolution of \978, as amended and the Subdivision Regulations of 1984, as amended (together known as the Old Code). ln order to resolve these issues, this memorandum contains a list of proposed amendments to the New Code to address these identified issues. The specific amendments that are covered in this memo include the following: 1) lnclusion of the Traffic lmpact Fee requirements to Article Vll Standards (attached as Exhibit E); Clarifications and amendments to Section 4-502 (lmprovements Agreement and Development Agreements) attached as Exhibit G; Traffic lmpact Fees The Board of County Commissioners adopted Traffic lmpact Fees (Resolution 97-111, reception # 517936) and included them in the subdivision regulations (section 9:49) of the old code via Resolution 97-O4, reception # 503446, and adopted Road lmpact Districts via Resolution 98-28. ln the adoption of the new code, this section regarding impact fees was inadvertently left out of the subdivision regulations. Staff recommends re-inserting them in Article V (Divisions of Land) in the new code just as they existed in the old code with no change. This language is provided here as well as "Exhibit A" and "Exhibit B" which is a worksheet to calculate the fee as it would only apply to 2l il. Divisions of Land. Staff suggests adding this language as a new separate section, Section 7-406 in Article 7 (Standards) as follows: Section 7-406 Stondords for Troffic lmpoct Fees A. General Requirements Off-site rood impacts sholl be evaluoted for subdivisions throuah completion of a traffic studv identifvinq the volume of troffic aenerated from the development. bosed on Trip Generation Rate calculations utilizina the most current lnstitute of Traffic Enqineers. Trip Generotion Manual. to estoblish on Averaqe Doilv Troffic (ADTI. The rood impact fee shall be established os a result of enterinq the applicable data identified in the Rood lmpact Fee calculotion Work Sheet locoted in Appendix A. Fiftv percent (50%) of the road impact fees shall be collected at the Final Plat for o subdivision. if the offected Countv road proiect is scheduled to stort within five vears in a Copital lmprovements Plan adopted bv the Board of Countv Commissioners. All other road impoct fees will be collected at the issuance of a buildinq permit. Anv road impact fees collected will be put into a seporote interest bearina account in the Countv Treasurer's office, for each rood that impoct fees ore collected. All fees collected and interest occrued must be spent on copital improvements to the specific rood for which the fees were collected within twentv (20) vears of the dote that the fee is established. All copital expenditures must be consistent with the capital improvements plan used as a basis for establishinq the fee. lf. after twentv (2O) vears, the fees collected have not been spent in accordance with the capital improvements plan used to estoblish the fee. all fees will be returned to the land owner of the propertv assessed on impact fee. with interest accrued. To the extend the Countv hos expended funds consistent with o copitol improvements plon for a particular road ond a propertv owner hos not poid a road impoct fee os required for a buildina permit which establishes additional ADT. the impact fee shall be collect at the time a buildina permit is issued to recoup the expenditure. Anv fees collected after the completion of on identified road proiect. will be credited to the appropriate proiect ond will be used to reimburse the Countv for the funds odvanced to complete the proiect. The Countv mav use road impact fees for a specific road improvement identified as o critical facilitv with a hiqh prioritv for health and safetv reasons in a Capital lmprovements Plan adopted bv the Boord of Countv Commissioners. in advance of the completion of the entire rood improvement proiect. Anv such use of funds must be consistent with the bosis for the impact fee. lf. after the use of rood impact fees for a critical facilitv road improvement. the Countv fails to complete the entire proiect identified in the copital improvements plan within the twentv (2A) vear period of collection, t onate share.will be r to the own the propertv subiect to the impact fee bosed on the actuol amount of the expenditures made on a particular rood svstem. As a part of the Copital lmprovements Plon. the Board mav determine that certain portions of the road improvements to o road are criticol to complete. before there ore additi eneratinq use to the rood.tis ital lm the ollowed to totol cost needed improvements prior to the Countv's schedule. The Countv will reimburse the portion of the cost that exceeds the omount thot would be opplicable for road imgoct fees plus interest bv the time thot the proiect hod oriainollv been scheduled to be completed. lf the Board of Countv Commissioners hos not estoblished a base road cost per ADT for the area in question, the opplicont will not be oblioated to Provide on analvsis of the off-site rood impacts. B. Traffic Study Areas (Vio Resolution 98'28) (Mop attached) before the Countv has scheduled to make the necessorv improvements identified in the Traffic Study Area Estimated Cost Level of Service Design Copacity (ADr)Cost per ADT Area 1A Totals / Fees s 7o,o0o E 16,000 s 4 Area lTotals/Fees S q,s+o,ooo E 15,725 $ 276 Area2Totals/Fees S 1,54o,ooo E 13,800 s 112 Area3Totals/Fees s 3,830,000 E 16,917 s 226 Area4Totals/Fees s 1,760,000 E 16,977 s 104 Area6Totals/Fees S g,+ro,ooo E 16,200 s 210 Area 8A*s 520,000 E 17,000 S 31 Area 8B*s 1,77o,ooo E 17,000 s 104 Area 8C*s 790,000 E 77,700 $68 Area 8D*s 71o,ooo E 11,700 s 61 Area 8E*s 1,600,000 E 77,700 s 137 Area 8F*s 1,810,000 E L1,700 s 1ss Area 8G*$ 2,220,000 E !7,700 s 1s0 Area 8* Totals S a,zoe,ooo E C. lmpoct Fee Worksheet lnstructions 1) Note the name for the project or fee payer on line 1 os well os the type of lond use. 2) Enter the road cost ot the point of service on line 2. The rood cost will be bosed on o Capital lmprovements Plan adopted by the Board of county Commissioners. 3) Enter the road copacity (expressed in Average Daily Trips IADT] ot the point of service. This may be determined by the Speciat Report 209, Highwoy Capacity Monuol (7994, Tr o n s portati on Rese o rch Boo r d ). 4) Calculate the bose road cost per ADT ot the point of service by dividing Line 2 by Line 3. Enter the result on Line 4. Determine the ADT per Lond use from the ITE Trip Generotion Manual or another credible source occepted by the Board and enter the result on Line 5. Calculote the Bose Troffic tmpact Fee for the type of land use by multiplying the ADT per Land Use (Line 5) by the Bose Road Cost per ADT (Line 4) and enter the result on Line 6. Calculote Tax Credits os follows: o. Enter the equivolent of 80% of the Rood and Bridge property tox mill levy (for the type of land use) on Line 7. b. Enter the County Discount Rote (the rote of return the County receives from its investments) on Line 8. c. Enter the Road Design Life (in yeors) on Line 9. d. Enter the Present Worth Foctor (PWF) on Line 70. The PWF for various combinations of Term ond Discount Rotes is found in the Appendix. e. Colculote the Net Present Value of the tax credit by multiplying the Road & Bridge equivalent tax (Line 7) by the PWF (Line 10). Enter the result on Line 11. 8) Calculate the UNADJUSTED ROAD TMPACT FEE by subtrocting the tox credit (Line 11) from the Base Traffic tmpoct Fee (Line 6). Enter the results on Line 72. 9). Calculate the INFLATION ADJUSTMENT os follows: s) 6) 7) 5 2,24O,OOOAreagTotals/Fees Area 10 Totals / Fees Area ll Totals / Fees 4 o. On Line 7j, enter Denver-Boulder Consumer Price lndex (CPt) for the yeor the rood cost estimote wos prepored or the yeor the cost estimote is bosed. b. Enter the CPt for the yeor the impact fee is collected on Line 14. Uf the current CPI is not ovoiloble, use the overoge rote of change for the lost three yeors to derive the current yeor index.l c. Colculate the tnflotion Foctor by dividing the entry on Line 74 by the entry on line 1j. Enter the Result on Line 15. 70) Cotcutate the pRE-CONSTRUCTION INFLATION ADJUSTMENT TMPACT FEE by multiplying the unodjusted Road lmpoct Fee (Line 12) by the lnflation Foctor (Line 75). Enter the result on Line 16. Note: This adjustment is not necessory if the construction cost estimate is determined the same yedr os the fee is collected. 11) Colculote the PosT-coN'TRUCTtaN ADJUSTED IMPACT FEE os follows: Enter the County's Discount or lnvestment Rate on Line 17. lf the road construction wos finonced, derive the finonced rote from the debt repoyment schedule prepored for the finoncing ond substitute the derived rate for the Discount Rote. Enter the number of years since the rood wos constructed on Line 18. Determine the Compound tnterest Multiplier from Appendix A. Enter this multiplier on Line 79. ln the cose of debt finoncing, enter the imputed multiplier from the debt service schedule prepared for the finonce instrument. Calculote the POST-CONSTRUCTTON ADJUSTED IMPACT FEE by multiplying the 1NADJUSTED ROAD tMpACT FEE (Line 12) by the Compound lnterest Multiplier (or imputed finance multiplier) from Line 79. Enter the result on Line 20. IMPROVEMENTS AGREEMENT / DEVELOPMENT AGREEMENT (SEE EXHIBIT -)ATTACHED PLANNING COMMISSION RECOMMENDATION On April 28,2010, the Planning Commission unanimously voted to recommend the BOCC approve the proposed amendments to the Unified Land Use Resolution of 2008, as amended. V. RECOMMENDED MOTION "l will make a motion to approve the proposed amendments to the Unified Land Use Resolution of 2008, as amended including lnclusion of the Traffic lmpact Fee requirements to Article Vll Standards and certain clarifications and amendments to Section 4-502 for lmprovements Agreement and Development Agreements with the findings set forth below:" b. c. d. ilt. tv. 1. That the public hearings before the Planning Commission and Board of County Commissioners were extensive and complete, that all pertinent facts, matters and issues were submitted and that all interested parties were heard. 2. That the application has met the public notice and public hearing requirements of the Garfield County Unified Land Use Resolution of 2008, as amended. 3. That the proposed text amendments have been determined to be in the best interest of the health, safety, morals, convenience, order, prosperity and welfare of the citizens of Garfield County. 4. The proposed text amendments are consistent with applicable standards of the Unified Land Use Resolution of 2008, as amended, and complies with the Garfield County Comprehensive Plan of 2000, as amended. 5. The proposed text amendments do not conflict with State statutory provisions regulating land use. EXHIBIT 6'oonDd Section 7-406 Standords for Troffic lmpoct Fees D. General Requirements Off-site road impocts shall be evoluated for subdivisions throUqh completion of a traffic studv identifvina the volume of traffic aeneroted from the development, bosed on Trip Generation Rate calculotions utilizina the most current lnstitute of Troffic Enqineers. Trip Generation Manual. to estoblish an Averaae Dailv Traffic (ADTI. The road impact fee sholl be estoblished os o result of enterinq the opplicable data identified in the Road lmpoct Fee colculation Work Sheet located in Appendix A. Fiftv percent (50%) of the road impact fees shall be collected ot the Final Plat for o subdivision. if the affected Countv road proiect is scheduled to start within five veors in a Capital lmprovements Plan adopted bv the Board of Countv Commissioners. All other road impact fees wtll be collected at t Anv road impoct fees collected will be put into a separate interest bearina account in the Countv Treasurer's office. for eoch road thot impact fees are collected. All fees collected and interest occrued must be spent on capital improvements to the specific road for which the fees were collected within twentv (2d vears of the dote that the fee is estoblished. All capitol expenditures must be consistent with the capitol improvements plan used as a basis for estoblishinq the fee. lf . after twentv (201 veors. the fees collected have not been spent in accordance with the capital improvements plan used to establish the fee. ollfees will be returned to the lond owner of the propertv ossessed an impoct fee. with interest accrued. To the extend the Countv has expended funds consistent with a capitol improvements plan for a particulor rood and a propertv owner hos not paid a road impact fee as required for o buildinq permit which estoblishes additionol ADT, the impact fee sholl be collect at the time a buildina permit is issued to recoup the expenditure. Anv fees collected after the completion of an identified road proiect- will be credited to the oppropriate proiect and will be used to reimburse the Countv for the funds advonced to complete the proiect. The Countv mav use road impoct fees for a specific road improvement identified as a criticol facilitv with o hioh prioritv for health and safetv reasons in a Capital lmprovements Plan odopted bv the Boord of Countv Commissioners. in advance of the completion of the entire road improvement .proiect. Anv such use of funds must be consistent with the basis for the impoct fee. tf . after the use of rood impact fees for a criticol focilitv road improvement. the Countv fails to complete the entire proiect identified in the copital improvements plan within the twentv (20) vear period of collection. the proportionote share. with interest. will be returned to the owner of the propertv subiect to the impact fee based on the actual amount of the expenditures made on o porticular road svstem. As a part of the Copitol lmprovements Plan, the Boord mav determine that certain portions of the road improvements to a road are criticol to complete. before there are anv additional traffic aeneratina uses added to the road. lf a development is proposed before the Countv has scheduled to make the necessarv improvements identified in the Capital lmprovements Plan. the developer mov be ollowed to pav the total cost of the needed improvements prior to the Countv's schedule. The Countv will reimburse the portion of the cost that exceeds the amount that would be applicable for road impoct fees. plus interest. bv the time that the proiect hod oriqinollv been scheduled to be completed. lf the Board of Countv Commissioners hos no.t established a base rood cost per ADT for the areo in question. the opplicant will not be obliqated to provide an analvsis of the off-site road impacts. E. Traffic Studv Areas (Via Resolution 98-281 (Map attoched) Traffic Studv Areo Estimqted Cost Level of Service Desian CapociW (ADT)Cost per ADT Area 14 Totals / Fees S zo,ooo E 16,000 s ArealTotals/Fees S +,:qo,ooo E 15,725 S zto Area2Totals/Fees S r,s+o,ooo E 13,800 su2 Arca 3llIalilleEs S :,9:o,ooo E 76,917 5 ?26 Area4Totals/Fees $ 1,760,000 E 76,917 S roa Area6Totals/Fees S :,+ro,ooo E 16,200 S zro Area 8A*S szo,ooo E 17,000 s31 Area 8B*S t,zzo,ooo E 17,000 S ro+ Area 8C*S zgo,ooo E tl,700 s68 Area 8D*s 710,000 E 77,70O s61 Area 8E*s 1,600,000 E LL,7OO S r:z Area 8F*s 1.81Qp0q E 17,799 S rss Area 8G*s 2,220,000 E Tff,99 S rgo Area 8* Totals Area 11 Totals / Fees F. lmpoct Fee Worksheet lnstructions 12) Note the nome for the proiect or fee paver on line 7 os well as the type of lond use. 7i) Enter the rood cost ot the point of service on line 2. The rood cost will be bosed on o Capitol lmprovements Plon adopted bv the Board of Countv Commissioners. 74) Enter the road copacitv kxpressed in Averoqe Dailv Trips IADTI ot the point of service. This mav be determined bv the Soecial Report 209. Hiohwov Cooacitv Monuol (1994 Transoortation Research Boord). 15) Colculote the base rood cost per ADT at the point of service by dividinq Line 2 bv Line 3. Enter the result on Line 4. 16) Determine the ADT per Lond lJse from the ITE Trip Generotion Manual or onother credible source accepted bv the Boord ond enter the result on Line 5. 17) Colculate the Bose Troffic lmpact Fee for the tvpe of lond use bv multiplvinq the ADT per Land Use (Line 5) bv the Base Rood Cost per ADT (Line 4) and enter the result on Line 6. 18) Colculate Tox Credits os follows: f. Enter the equivalent of 80% of the Rood and Bridqe propertv tox mill levv (for the tvpe of lond use) on Line 7. g. Enter the Countv Discount Rote (the rote of return the Countv receives from its investmentsl on Line 8. h. Enter the Road Desian Life (in veorsl on Line 9. i. Enter the Present Worth Foctor (PWF) on Line 10. The PWF for vorious combinotions of Term ond Discount Rotes is found in the Aopendix. j. Calculote the Net Present Value of the tox credit bv multiplvinq the Road & Bridae equivalent tax (Line 7) bv the PWF (Line 10). Enter the result on Line 77. 19) Colculote the IJNADJIJSTED ROAD IMPACT FEE bv subtroctina the tox credit (Line 17) from the Base Traffic lmpoct Fee (Line 61. Enter the results on Line 12. 20) Calculote the INFLATION ADJUSTMENT os follows: d. On Line 1j. enter Denver-Boulder Consumer price tndex lCpll for the vear the road cost estimote wos preoored or the vear the cost estimote is bosed. e. Enter the CPI for the veor the impact fee is collected on Line 14. fif the current Cpt is not ovoiloble- use the overoqe rote of chanae for the lost three veors to derive the current vear index.l f. Calculate the lnflotion Foctor bv dividino the entrv on Line 74 bv the entrv on line 73. Enter the Result on Line 75. 27) Colculate the PRE-CONSTRUCTTON INFLATION ADJIJSTMENT IMPACf fff bv multiplvinq the Unodiusted Road lmpoct Fee (Line 12) bv the tnflation Foctor (Line 15t. Enter the result on Line 16. Note: This adiustment is not necessarv if the construction cost estimote is determined the same veor as the fee is collected. 22) colculate the Posr-coNSTRlJCTtoN ADJUSTED tMpACT FEE os foltows: e. Enter the Countv's Discount or tnvestment Rote on Line 77. tf the rood construction wos finonced derive the finonced rote from the debt repavment schedule prepored for the finoncino and substitute the derived rote for the Discount Rote. f. Enter the number of veors since the rood wos constructed on Line 7g. g. Determine the Comoound lnterest Multiplier from Appendix A. Enter this multiplier on Line 79. ln the case of debt finoncina. enter the imouted multiplier from the debt service schedule prepored for the finance instrument. h. colculate the Posr-coNSTRIJCTtoN ADJIJSTED IMpACT FEE bv muttiplvinq the UNADJUSTED ROAD IMPACT FEE (Line 721 bv the Compound tnterest Multiolier (or imputed finonce multiplierl from Line 79. Enter the result on Line 20. 10 G.ralltc Fee Worksheet E ROAD IMPACT FEE CALCUUTION WORK SHEET ("Example") No,BASE INFORMATION Troffic lmpoct Study Areo 8D Dote Prepared 2/16/2010 1 Project / Lond Use (Number of Total Dwelling Units, lncluding ADUs)27 2 Base Rood Cost SE,zgo,ooo j Rood Capocity in ADT 74,350 4 Road Cost per ADT 5264.11 5 ADT per Lond Use 9.57 6 Bose Road lmpoct Fees per Land Use S2,s27.ss TAX CREDITS 7 80% of Annuol R & B Property Tox per Lond Use 528.16 8 County Discount Rate 4.78% 9 Rood Design Life (Yeors)12 10 Present Worth Factor 8.98 11 Property Tox Credit 52s2.7s 12 UNADIUSTED ROAD IMPACT FEE 52,224.70 [Base Rood lmpact Fee - Property Tox Credit] INFLATION ADJUSTMENT 7i Denver-Boulder CPI Year of Cost Estimote 158.5 74 Denver-Boulder CPI Year of lmpoct Fee Calc.197.9 15 lnflotion Factor 1.2107 [CPl for Collection Year/CPl of Yeor of Cost Estimote] 16 PRE-CONSTRUCTION INFLATION ADIUSTED ROAD IMPACT FEE 52,7s4.71 P OST.CO N STR U CTI O N CO ST AD] U STM E NT 77 County Discount Rate 4.78% 18 Term (Yeors since Construction 0 79 Com pou nd I nte rest M u lti plier 1.0000 20 POST.CONSTRUcTION AIUSTED ROAD IMPAC-T FEE TOTAL FEE BREAKDOWN TOTAL FEE FOR TOTAL NUMBER OF DWELLING UNITS S74360.eg 1.1. 1/2 OF FEE TO BE PAID AT FINAL PUT IMPACT FEE TO BE COLLEC|ED WITH EACH BUILDING PERMIT H. Map of Traffic Study Areos (via Resolution 98-28) ;::!iiEai=:Ei:!!:=i;i: =E :"i':!i 72 13 EXHIBIT ( ARTtcLE lV Apprrcntrotr eruo Rrvtrw PRocrouRes 4-502 DESCRIPTION OF SUBM TAL REQUIREMENTS Formatted: Not Different flrst page header County, prior to final approval of the land use change application. An approved development agreement shall be signed by the applicant, the Board of County Commissioners, and all owners of the subject property. The signed agreement shall be included with the final plat filing. The development agreement must include the following: 1. Phasing schedule. 2. Language establishing a vested property right pursuant to the provisions of Section 1-202, Establishment of Vested Property Rlghfs of Article l. I. Improvements Agreement. An.lmprovements Aqrqg[]ent is reg.!.lired ln a form acceptable to the County. addressinq the followinq: 1. Security for construction of necessary of improvements. The following methods are suooestions and a letter of credit or cash deposit is typical ly requi!:ed for i nfrastructur a*. Restrictions on the conveyance, sale or transfer of any lot' lots, tract, or tracts of land within the subdivision as set forth in the plat or as recorded by separate instrument. b2. Performance or property bonds. c3. Private or public escrow agreements. d4. Loan commitments. e5. Assignments of receivables. f6. Liens on property. a7. Letters of credit. h8. Deposits of certified funds. i. Performance ouarantees. ig. Other similar surety agreements. 2. The lmprovements Aqreement must also address the followinq: GARFIELD CouNw Urutrteo LAND UsE RESoLUTIoN oF 2008, AS AMENDED 4-73 ARTICLE IV AppLrcerroN Rruo Revrew PRocrouRes 4-502 DESCRIPTION OF SueIvIIrTeL REQUIREMENTS a40. Necessary deeds or transfer of property. b{4. Provisions and schedule for construction of improvements, includinq engineered plans and cost estimates.. 12, Perforrnanee guarantees and letters ef erediL c43. Payment of sewer and water tap fees. d14. Payment of any other necessary fees. e45. Transfer of water rights. f+6. Transfer of roads and improvements, rights-of-way, and other common elements. a44. Agreements to provide "as built" plans. h{4. Methods of providing perpetual maintenance of common property and equipment. izg. Process for amending the @ Agreement. i*+. eovenants-ang-eEnforcement p rovisions. J. Traffic Study. A Traffic Study shall be submitted as part of the lmpact Analysis, to identify construction impacts and projected impacts of the proposed land use. The Traffic Study shall be comprised of a Basic Traffic Analysis utilizing existing County traffic counts as mapped, the current County Transportation Plan, the Manual on Uniform Traffic Control Devices, accepted Trip Generation Manuals, and current standards as applied by the Colorado Department of Transportation. The Traffic Study may also include a Detailed Traffic Analysis, pursuant to Section 4-502(J)(7), Thresholds Triggering a Detailed Traffic Analysis. The Traffic Study shall be prepared by a registered professional engineer, experienced in Transportation Engineering, 1. Applications Requiring Traffic Study. A Traffic Study shall be required for applications subject to Major lmpact Review, Subdivision Review Review, Rural Land Development Exemption Review, Rezoning and PUD. GIRTICIO COUNTY UNIFIED LAND USE RESOLUTION OF 2008, AS AMENDED 4-74 /)7'70 '40 ) )ss ) hi/'- srArE oF coLoRA#" fr";EXHIBIT @':'/,ln ( *[5':') County of Garfield At a regular meeting of the Board of County Commissioners for Garfield County, Colorado, held in the Commissioners' Meeting Room, Garfield County Courthouse, in Glenwood Springs on Monday the 6ft of July, z}l},there were present: John Martin , Commissioner Chairman Mike Samson -) Commissioner Trdsi Houpt , Commissioner Deborah Ouinn , Assistant County Attorney Jean Alberico , Clerk of the Board Ed Green (absent), CountY Manager when the following proceedings, among others were had and done, to-wit: RESOLUTION NO. A RESOLUTION CONCERNED WITH THE APPROVAL OF A TEXT AMENDMENT TO THE TJNIFIED LAND USE RESOLUTION OF 2008, AS AMENDED, SPECIFICALLY FOR THE INCLUSION OF THE TRAFFIC IMPACT FEE REQUIREMENTS TO ARTICLE VII STANDARDS AND CLARIFICATIONS AND AMENDMENTS TO SECTION 4-502 (IMPROVEMENTS AGREEMENT AND DEVELOPMENT AGREEMENTS) PROVIDED FOR IN EXHIBITS A AND B (ATTACHED HERETO) PARCEL NO# N/A Recitals A. The Planning Director of Garfield County, Colorado, initiated a Text Amendment application to amend certain provisions (below) of the Unihed Land Use Resolution of 2008, as amended which are specifically contained in Exhibits A and B (attached hereto) and described below: 1) lnclusion of the Traffic lmpoct Fee requirements to Article Vll Standords; and 2) Clorificotions and dmendments to Section 4-502 (lmprovements Agreement and Devel o pment Agre e m e nts) B. On April 28,2}|O,the Garfield County Plan-ning and Zoning Commission forwarded a unanimous recommendation of approval to the Board of County Commissioners. Page 1 of3 C. On July 6fr,2010, the Board of County Commissioners opened a public hearing upon the question of whether the Text Amendment should be approved, approved with changes, or denied at which hearing the public and interested persons were given the opportunity to express their opinions regarding the issuance of said Text Amendments. D. The Board of County Commissioners closed the public hearing on July 6ft, 2010 to make a final decision. E. The Board on the basis of substantial competent evidence produced at the aforementioned hearing, has made the following determinations of fact: 1. That the public hearings before the Planning Commission and Board of County Commissioners were extensive and complete, that all pertinent facts, matters and issues were submitted and that all interested parties were heard' 2. That the application has met the public notice and public hearing requirements of the Garfield county Unified Land Use Resolution of 2008, as amended. 3. That the proposed text amendments have been determined to be in the best interest of the health, .uf"iy, morals, convenience, order, prosperity and welfare of the citizens of Garfield County. 4. The proposed text amendments are consistent with applicable standards of the Unified Land Use Resolution of 2008, as amended, and complies with the Garfield Coturty Comprehensive Plan of 2000, as amended. 5. The proposed text amendments do not conflict with State statutory provisions regulating land use. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Garfield County, Colorado, that the Garfield County Unified Land Use Resolution of 2008, and identified as its Resolution No. 08-115, as subsequently amended by this Board, shall be and hereby is amended as shown on the attached Exhibits A and B and said language will be incorporated into the codified Garfietd County Unified Land Use Resolution adopted on October 13ft,2009: ADOPTED this ATTEST: day of ,2010 GARFIELD COUNTY BOARD OF COMMIS SIONERS, GARFIELD COLINTY, COLORADO Clerk of the Board Page2 of 3 Chairman Upon motion duly following vote: made and seconded the foregoing Resolution was adopted by the STATE OF COLORADO County of Garfield I,, County Clerk and ex-officio Clerk of the Board of County Commissioners, in and for the County and State aforesaid, do hereby certify that the annexed and foregoing Resolution is truly copied from the Records of the Proceeding of the Board of County Commissioners for said Garfield County, now in my office. ) )ss ) IN WITNESS WHEREOF, I have hereunto set my hand and affrxed the County, at Glenwood Springs, this - day of County Clerk and ex-officio Clerk of the Board of County Commissioners seal of said A.D.2010. Page 3 of3 Section 7-406 Stondords for Troffic lmpoct Fees D. General Requirements off-rit" ,ood iroacts sholl be evaluated for subdivisions throuah comPletion of o troffic ,tud, iintifvino the wlume of traffic aenerated from the development bdsed on TriD Guneration Rote calculations utilizina the most current lnstitute of Trdffic Enqineers Trip Generdtion M;nuol to establish an Averooe Doilv Traffic (ADTI' The rood impoct fee Jail be estoblished as a result of enterina the opolicable data identified in the Road lmpact Fee colculation Work Sheet located in Appendix A' Fiftv percent (50%t of the road impoct fees shall be collected ot the Finol Plot for a subdivision if the affected Countv road proiect is scheduled to start within five vears in o caoitol lmorovem-ents plon odopted bv the Board of countv commissioners.All other ;ad impdct fees will be collected dt the issuance of d buildinq permit- An, ,ood i^poct fees collected will be put into a seporote interest beorinA account in thu Count, Treasurer's office for eoch road that impoct fees are collected. All fees illected ond interest occiied must be spent on cooitol improvements to the soecific rood for which the tees were collected within twentv (2Ot vears of the date that the fee i established. All copinl expenditures must be consistent with the capitol ir*ou"^"nts plon used as a basis for establishinq the fee. lf after twentv (2Ol vears th, fees c:ollected have not been spent in accordance with the copitol improvements -olaiied to establish the fee allfees will be returned to the lond owner of the DroDertv assessed an impact fee with interest accrued' To the extend the Countv has expended funds consistent with o coPital imProvements plan for a particulor road and o propertv owner has not poid o road impoct fee as ,"ouir"d fo, o buildina permit which establishes odditional ADT the impact fee sholl be collect at the time a buildinq permit is issued to recoup the expenditure' Anv fees .,,trrt"d oft", th" ciptetion of on identified road proiect. will be credited to the oOOroOriote proiect ond will be used to reimburse the Countv for the funds advanced to complete the Proiect. The countv mov use rood impact fees for o specific rood improvement identified as o critical focilitv with a hiah prioritv for heolth and safetv reasons in a Capital l.Or*i,"*rnt, Plon adwted bv the Boord of Countv Commissioners in advonce of the comiletion of thi entire road improvement proiect' Anv such use of funds must be ,onirlrcnt with the basis for the impoct fee' tf' after the use of rood imoact fees for a ;riilcol facilitv roacl improvement the Countv foils to complete the entire Droiect identified in the cooiial improvements plon within the twentv (201 veor period of ,rllrrtion th" proportionate share with interest. will be returned to the owner of the propertv subiect to the impoct fee bosecl on the actuol omount of the exoenditures made on o particular rood svstem. ovements Plon, the mav determine that certain "ions of the rood im 'nts to o rood ore critlggllp-gprnp!e@ e there are dditionol troffi uses added to the road. lf a dev before the CountY bos ed to moke the necessarv i 'ments identified in the Copitol lm ts Plan, t veloper may be ol\owed lq-payJh-g.lols! needed im Countv's e. The will reim that exceeds omount that be e for road i time that th ect hod nollv been ed to be completed. lf the Board of Countv Commissioners has not estoblished o base rood cost per ADT for the areo in question. the aoplicont will not be obliaated to Drovide an analvsis of the off'site road impocts. E. Troffic Studv Areas (Via Resolution 98-28t (Map attachedl Troffic Studv Area Estimated Cost Level of Service Desian Copocitv (ADT)Cost per ADT Area lATotalsl Fees S Zo,ooo E 16,000 s 4 Area lTotals/Fees S +,:+o,ooo E 15,725 S zta Area 2Totals/Fees s 1,s4q,ooq E 13,800 s 112 Area 3 TslaEllee!s 3,83QJQq E t6pll 5 zze Area 4 Totalslleel s 1,760,000 E 16,917 S ro+ Area6Totals/Fees S :,aro,ooo E 16,200 S zro Area 8A*S szo,ooo E 17,000 S 31 Area 8B*s 1,77!p0q E 17,008 s 104 Area 8C*s 79o,ooo E 17,700 s68 Area 8D*s 71q8Q8 E 17,700 Sor Area 8E*S 1,600,000 E 77,700 S raz Area 8F*s 1.81o,rQgq 11,700 S rss Area 8G*S 2,22o,ooo E 7L,700 S rgo Area 8* Totals S e,zoo,olq E AreagTotals/Fees s 2,240,000 E 18,433 5 tzz Area 10 Totals / Fees s 3,16Qp88 E 16,200 s 1r5 {rea 11 Totals / Fees s 6,220,000 E 16,200 S :a+ E 8 F. lmpact Fee Worksheet lnstructions 12) 73) Enter the rood cost at the point of service on line 2. The rood cost will be based on o capitol lmorovements Plan adopted bv the Boord of Countv Commissioners' Tl at the poit ice. This14) Enter t 1"m determi 15) Ct Tronsportation Reseorch Boordl. the result on Line 4. 16) 17) heB T, 5. lond us m the 18) Calculote Tax Credits as follows: land use) on Line 7. S. E_ investments) on Line 8. h. Enter the Rood Desian Life (in vearsl on Line 9' i. Enter the Present worth Factor (PWF) on Line 70. The PWF for vorious combinations of t Rotes i: 19) Colculote the TED IMPACT ihe Bose Troffic tmpoct Fee Line 61. Enter the results on Line 12' 20) Colculate the tNFLATION ADJIJSTMENT as follows: the tax credit (Line 71 d. veor index.l e. CAICUIOTC thE PRE-CONSTRUCTIAN INFLATION ADJUSTMENT IMPACT FEE bV MUItiOIViNq th? urodiurt"d Road tmpoi Fee (Lini 72t bv the hrlotion Foctor (Line 751' Enter the result on Line 16. Note: This adiustment is not necessorv if the construction cost estimote is iiermined the same veor os the fee is collected' e. Enter the Countv'|s Discount or lnvestment Rote on Line 17' lf the rood ccnstruction wos financed derive the financed rote from the debt repovment schedule orepored for the fin*cinoonds,b'titutethederivedrotefortheDiscountRate. q. Determine the compound tnterest Multiplier from Appendix A' Enter this multiplier on Line 19. ln the case of debt finoncina enter the imputed multiplier from the debt service schedule prepored for the finance instrument' h. COICUIOTC thc POST-CONSTRUCTION ADJUSTED IMPACT FEE bV MUItiDIV|Nq thc INADIUSTED IOAD IMPACT FEE (Lii12t bv the Compound tnterest Multintier (or 10 G. Traffic tmpact Fee Worksheet E19rnp!9 ROAD IMPACT FEE CALCULATTON WORK SHEET ("Exomple") I No, I BASE INFORMATION Traffic lmpoct StudY Area 8D Dote Prepored 2/16/2010 7 Project / Lond Use (Number of Totot O*"lling Unitt, tn,l@ 27 2 Bose Road Cost 5j,79o,ooo 3 Road CopacitY in ADT 14,350 4 Road Cost per ADT 5264.11 5 ADT per Land Use 9.57 6 Bose Road lmpact Fees Per Land Use $2,s27.ss TAX CREDITS 7 80% of Annuol R & B Property Tax per Lol! UE 528.16 I County Discount Rote 4.78% 9 Road Desiqn Life (Yeors)12 10 Present Worth Foctor 8.98 11 Property Tox Credit S2s2.7s 12 UNADIUSTED ROAD IMPAO FEE 52,274.76 [Base Rood lmpoct Fee - Property Tox Credit] INFLATION AD]USTMENT 13 Denver-Boulder CPI Yeor of Cost Estimote 158.5 14 Denver-Boulder CPI Year of lmpoct Fee 191.9 15 lnflotion Foctor 1.2107 [CPt for Collection Y"or/CPl ofYuor of Crtt E 15 PRE-CONSTR'JCflON INFLATION ADIUSTED ROAD IMPACT FEE $2,7s4.7t P OST-CO N STR U CTI O N COST ADJ U ST M EN T l/County Discount Rate 4.78% 78 Term (Yeors since Construction o 19 Co m po u n d I nte rest M u lti PI i e r 1.0000 20 POST-CONSTRUCTION AIUSTED ROAD IMPACT FEE TOTAL FEE BREAKDOWN TOTAL FEE FOR TOTAL NUMBER OF DWELLING UNITS 7/2 OF FEE TO BE PAID AT FINAL PLAT $Ez,lso.qg IMPAC| FEE TO BE COLLECTED WITH EACH BUILDING PERMIT 57,377.0G 1,L s74,i60.98 H. Map of Traffic Study Ar"rt (ui' n"toluti' .)r >;4.----.{----:...: -->--\=:z---j.----: Iliirtl I t l1- iti,t1t" 72 lm provements Ag reement. County, prior to final approval of the land .use change application' Al gp|l?Y^".1 development agreemel[ "f,rtt U" signed by the applicanl the Board of County Commissioners, and ,ii-*ur. of tfie subiect property. The signed agreement shallbeincludedwiththefinalplatfiling.Thedevelopmentagreementmust include the followinq: Phasing schedule. Language establishing a vested p.rgp9rty right pursuant to the il"1;io t of Section 1-202, Estabtishment of Vested Property Righfs of Article L ----a+.Restrictionsontheconveyance,sa]eortransferofanylot, lots, traci, or tracts of land within the subdivision as set forth in the plat or as recorded by separate instrument' 1. 2. ARTICLE IV AppLtcRttott Rruo RevtEw PnoceouRrs 4.502 DESCRIPTION OF SUBMITTAL REQUIREMENTS EXHIBIT Formatted: Not Different flrst page header Formatted: Font: Not Bold b2. Performance or property bonds' c3. Private or public escrow agreements' Loan commitments' e6. Assignments of receivables' f6. Liens on ProPertY. q?. Letters of credit' h8. DePosits of certified funds' i. Performance quarantees' i9.Other similar suretY agreements. GIRTITIO COUNTY UNIFIED LAND USE RESOLUTION OF 2008, AS AMENDED 4-73 ARTICLE IV Appt-tcnrtoru RNo Rrvtew PnoceouREs 4.502 DESCRIPTION OF SUBMTTTAL REQUIREMENTS a40. Necessary deeds or transfer of property' b1+. Provisions and schedule for construction of improvements' -ficludinq engine c€. Payment of sewer and water tap fees d14. Payment of any other necessary fees' e+5. Transfer of water rights' -.l+s. Transfer of roads and improvements, rights-of-way' and other common elements. c-1+. Agreements to provide "as built" plans' h{€. Methods of providing perpetual maintenance of common property and equiPment. 19. Provisiens fer a heme ewners assoelatien' i2g. process for amending the @ Agreement. -:X. eevenants-a*+eEnforcement provisions' J.TrafficStudy.ATrafflcStudyshallbesubmittedaspartofthelmpact Analysis, to identify'construction impicts and projected impacts of the proposed land use. The Traffic Study shali be comprised of a Basic Traffic Analysis ,titiring existing County tiaffic coun!1 as mapped' the- current County iiansp"ortatlon ilrn, the'Manual on Uniform Traffic Control Devices, accepted trpc"n",ationManuals,andcurrentstandardsasappliedbytheColorado DeparimentofTransportation.TheTrafficstudymayalso.inc,ludeaDetailed Traffic Analysis, pursuant to Section 4-502(JX7), Thresholds Triggering a Detaited Traffic Anatysis. The Traffic study shall be prepared by a registered protessionat engi neei, experienced in Transportation E ngineeri ng' l.ApplicationsRequiringTrafficstudy.ATrafficStudyshallbe'- reqlireo for applications subject to Major lmpac! Review, Su'ndivision Review Review, Ruial Land Development Exemption Review, Rezoning and PUD. GARFIELD COUNTY UruITIEO LAND USE RESOLUTION OF 2008, AS AMENDED 4-7 4