Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutApplication.pdfGarfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.earfield-countv.com
MAY 0 7 7014
RFIEL'� COUNgY
BUILDING PERMIT
APPLICATION
1`YPI OF,CONSTRUCTION
0 Commercial/Multi-Family
0 Demolition
❑ Manufactured Home (SF or Duplex)
G Residential (SF, Duplex, or Townhome) ❑ Reroof
INVOLVED PARTIES
�1a�1 'N Les Property Owner: 1+.e Phone: ( 1 7C,1 ) 3 !�•• 17�Q `'°`
y7� 3/g., >9ir
Mailing Address: DG t A i ,ierikr,14 & r.J-c /U('vc� Ci4 Eire, Co ,Veil, v -t
Contractor: h1ovtae -3 Rin 114(' A, ja,r l Phone: ( 9 7e7 ) 3/7- /'99 ."1 ' '
Mailing Address: rc), +' �v � dots ;C U(1 re !t''.2i1.64 S C B1(. 47
Architect:
Mailing Address:
Phone:(
Engineer: Phone: ( )
Mailing Address:
Manufactured Home Installer: Phone:
Mailing Address:
PROJECT NAME AND LOCATION
Describe Work: € LSp tech - r1Idi ., V<Jn,�n
Job Address: Dr97/Brr✓t' Ale kAl C4s(/x. C,, /(q
Assessor's Parcel Number: k 3 - Yi / 6i -t,' Sub. i'?Ivr11/44. Lot /0 Block f
Owner's Valuation of Work: $ i 4, e . Property Size (Sq.Ft or Acres):
Sq.Ft of Building: Height: _ # of Floors:
Class of Work: 0 New $Alteration 0 Addition 0 Repair 0 Move/Relocation
Garage:
0 Attached
Septic:
O ISDS
O Detached
O Community
Type of Heat:
O Natural Gas
Driveway Permit:
0 Propane
15(Electric
0 Other
151 Exempt
O Permit #:
NOTICE
Authority. This application for a Building Permit must be signed by the Owner of the property, described above, or
an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the
Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County ISDS Permit, (3)
another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a
State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of
the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the
Building Division. In consideration of the issuance of the Building Permit, I agree that I and my agents will comply
with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, ISDS
regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit
may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s)
and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law.
hereby grant permission to the Building Division to enter the property, described above, to inspect the work.
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction
or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law.
Review of this Application, including submittals, and inspections of the work by the Building Division do not
constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the
Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations
rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or
builder.
I hereby acknowledge that I have read and understand the Notice and Certification above as well as
have provided the required information which is correct and accurate to the best of my knowledge.
Property/Owner Print and Sign
Date
/97
OFFICIAL USE ONLY
Special Conditions:
Adjusted Valuation:
141770.5=
Plan Check Fee:
)i).3..1
Permit Fee:
251.15
Manu home Fee:
Misc Fees:
,
Total Fees:
414.56
Fees Paid:
I q i,q.56'
Balance Due:
BP No:
ISDS No:
(121 -(-0.1
Vim.\IR
Setbacks:
F30,� 30, 5) b
OCC Group:
G
Const Type:
���
Zoning:
Pi
BUILDING / PLANNING
DIVISION : 16/2 "--\ 0.5/41 -
Signed Approval Date
aka 5, !.11 „
-5& 9 4 gig, c
Building Plan Review
Description of Work: enclose deck, make sun room
Bin #:
Location Address: 91 RIVER BEND DR
NEW CASTLE, CO
General Information
Contacts
Case Manager: David Bartholomew
Plan Case Number: BLDG -5-14-7913
Parcel: 212334401010
Application Date: 05/07/2014
Owner: Jon & Leslie Krick
Applicant: Jon & Leslie Krick
Applicant Phone: (970)319-1799 Email:
N/A
Building
7
N1A
Engineered Foundation
Driveway Permit
Surveyed Site Plan
Septic Permit and Setbacks
Grade/Topography 30%
Attach Residential Plan Review List
Minimum Application Questionnare
Subdivision Plat Notes
Fire Department Review
Valuation DeterminationlFees
Red Line Plans/Stamps/Sticker
/ Attach Conditions
Application Signed
Plan Reviewer To Sign Application
Parcel/Schedule No.
40# Snowload Letter - Manu. Homes
Soils Report
Planninq!Zoninq
I) Property Line Setbacks
30ft Stream Setbacks
Flood Plain
Building height
oning Sign -off
Road Impact Fees
OA/DRC Approval
Grade/Topography 40%
Planning Issues
Subdivision Plat
General Comments:
I/.¢/.A 66f
/ 9Z Ox 7it. 6 8 = fi'/4; 33$. 5-c
36 X /z ,a6 = - 13z. as
7677z- -- 77o. 56
Thursday, May 15, 2014
The Building Division will collect a Plan Review fee at time of application submittal, The permit fee, as
well as any Septic or Road Impact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by person having written authority from the owner
to act as their representative.
Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a
CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO
inspection requirements will be attached to your approved field set of plans.)
I hereby acknowledge I have read, understand, and will abide by the requirements of this
checRt<ist.
Propejy Owner Print and Sign
Date