Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-10-14-3422 WPX Energy/Jolley Family LLP Compressor Bldg, Well Pad KP 13-17 Silt, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS. 2) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS. 3) ALL WGR-K—MHS+-CGMPLY WITI FfH .. e - '[RM1T-: 4) EXCAVATION OBSERVATION REPORT REQUIRED AT FOOTING INSPECTION, 2000 PSF. 5) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR. PROVIDE APPROVAL REPORT AT FRAME INSPECTION. 6) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED AT FRAME INSPECTION. 7) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION. 8) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 9) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 10) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL.