HomeMy WebLinkAboutApplication-Permit„ib1l4c7 .' 5, awti 4 t (4c €
7-P1
kne W,'It lams At -i vii ,nfi
/ GARFIELD COUNTY BUILDING PERMIT APPLICATION
(97d) I% 5Y92, 108 8"" Street, Suite 201, Glenwood Springs, CO 81601
Phone:ojx; 970-945.8212 / Fa970-384.3470 / inspection Line: 970.384.5003
Permit No: 9 Parcel/Schedule' No:
Job Address: Y2 mi les�` I / Q L B1' Exit S/ // Iti
92 mile J1/or't!� en Ain l Poi t ROeld Q1 lP
.,0\1-41-332- -0 9
1 Lot No: Block No: Subd. / Exemption:
2
Owner: rr Y�
l�s Pro i L l o. RAM
Address ry
io C R .12/s- PQI ✓ CO_
)
(t? Sr— 13 7 7
Wk Ph:
3
Contractor:
TPI 2-nc/u,s7tr,'4 /
Address:
RI"ver , 4T, 4o
Address:
1/99' a y Rd, Ga, CO
Sq. ��S no
}
Stci7`�lo�l —%71101
?CYO Ir CcGrsf�^
Ph:
(47o) 015 ¥6412
Ph:
(70); VC 057 7
Height: o
i D
Po;'its
I
f V/k 165' x ae
Lic. No.
a0s08g2
Lic. No.
P $ 3 A 2
No. of Floors: I
P7c1'4 ( .1 /.61
4
_41q71
Architect/Engineer:�
Cetch'?C.Con 0- rLLGtI I►Fl
5
Sq. Ft. of Building %6s
If!
6
Use of Building: �+
GRS CaH p.,ssor
Describe Work:
P P4J� and
00r
7
8
Class of Work: fYVew / ❑ Alteration o Remove
ID Addition CI Move
9
10
❑GarageN� ❑ Single
ele
Carport: O Single
Cl Double
_
o Driveway Permit O On -Site Sewage
Disposal
Site Plan
11
Valuation of Work: $ 12.02/ 000 , QO
Adjusted Valuations: S
ZD2, ago
12
Special Conditions:
A SEPARATE
ISSUED
THIS
AUTHORIZED
CONSTRUCTION
PERIOD
I HEREBY
APPLICATION
PROVISIONS
COMPLETED
GRANTING
TO VIOLATE
LOCAL
OF CON
AO:169it
S ;T
NOTICE
ELECTRICAL PERMIT IS REQUIRED AND MUST BE
BY THE STATE OF COLORADO.
PERMIT BECOME/ NULL AND VOID IF' WORK OR CONSTRUCTION
IS NOT COMMENCED WITHLN 180 DAYS, OR, IF
OR WORK IS SUSPENDED OR ABANDONED FOR A
OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED.
CERTIFY THAT I HAVE READ AND EXAMINED THIS
AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL
OF LAWS GOVERNING THIS TYPE OF' WORK WILL BE
WITHIN WHETHER SPECIFIED HEREIN OR NOT. THE
OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY
OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LAW REGULATING CONSTRUCTION OR THE PERFORMANCE
RUCTIO
1111, / q%
Z::..�.= / 30 0:
Plan Check Fee:
—
I / / I ai
Permit Fee:
/5'(eJi) r
Total Fee:
r
1§- z i /7
Dated Permit Issued:
OC ooup:
Const. Type:
Zoning:
el L,
Setbacks:
Manu. Home:
-Ob
IA
ISDS No. 86 Fee:
sIi to -z). -
DAT
I"
BLDG
APPR VA•ATE APPROVAL/DATE'
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE
STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF
THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED
STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER
REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING
CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY
RESPONSIBILITIES OR LIABLITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND
IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDED
TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST.
Garfom.003
I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL):
/0/ eclaq
row_
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold
running water, non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all IBC and IRC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made;
8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, anchor State
Agencies where applicable.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
Certificate of Occupancy for the dwelling under building permit # 6r'NV
attire
BpcontOct2004
6.64_
Date
9/30,10S-
Date
/3o,%aS
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
FOR
CONSTRUCTION OF
COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite
the issuance of a permit it is important that complete information be provided. When reviewing
a plan and it's discovered that required information has not been provided by the applicant, this
will result in the delay of the permit issuance and in proceeding with building construction. The
owner or contractor shall be required to provide this information before the plan review can
proceed. Other plans that are in line for review may be given attention before the new
information may be reviewed after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. Also, please consider
using a design professional for assistance in your design and a construction professional for
construction of your project. Any project with more than ten (10) occupants requires the
plans to be sealed by a Colorado Registered Design Professional.
To provide for a more understandable plan and in order to determine compliance with the
building, plumbing and mechanical codes, applicants are requested to review the following
checklist prior to and during design.
Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and
drawn to scale.
1
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade
and original grade line. A section showing in detail, from the bottom of the footing to the top of
the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and
spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building
material. Engineered foundations may be required. Check with the Building Department.
A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must
be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H.
windspeed, wind exposure B or C, and a 36 inch frost depth.
All sheets need to be identified by number and indexed. All of the above requirements must be
met or your plans will be returned.
All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC.
Applicants are required to indicate appropriately and to submit completed checklist at
time of application for a permit:
1. Is a site plan included that identifies the location of the proposed structure, additions or
other buildings, setback easements, and utility easements showing distances to the
property lines from each corner of the proposed structure prepared by a licensed surveyor
and has the surveyors signature and professional stamp on the drawing? Slopes of 30%
or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan
for the placement of any portion of a structure within 50 ft. of a property line and not
within a previously surveyed building envelope on a subdivision final plat shall be
prepared by a licensed surveyor and have the surveyors signature and professional stamp
on the drawing. Any structure to be built within a building envelope of a lot shown on a
recorded subdivision plat, shall include a copy of the building envelope as it is shown on
the final plat with the proposed structure located within the envelope.
Yes r
2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage
Disposal System) and distances to the property lines, wells (on subject property and
adjacent properties), streams or water courses? This information must be certified by a
licensed surveyor with their signature and professional stamp on design.
Yes NA No Not necessary for this project
3. Are the plans submitted for application review construction drawings and not drawings
that are stamped or marked identifying them as "Not for construction, for permit issuance
only", "Approval drawings only", "For permit issuance only" or similar language?
Yes ✓ No Not necessary for this project
2
4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a
Colorado Registered Engineer?
Yes NA No Not necessary for this project 1/-
5.
5. Does the site plan indicate the location and direction of the State, County or private road
accessingthe property?
Yes ,/
6. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?
Yes ✓ No Not necessary for this project
7. If the building is a pre-engineered structure, is there a stamped, signed engineered
foundation plan for this building?
Yes No Not necessary for this project
8. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes it/ 4 No Not necessary for project
9. Do the plans indicate the size and location of the ventilation openings for the attic, roof
joist spaces and soffits?
Yes V No Not necessary for this project
10. Do the plans include design loads as required under the IBC or IRC for roof
snowload,�, (a minimum of 40 pounds per square foot in Garfield County)?
Yes ✓ No Not necessary for this project
11. Do the plans include design loads as required for floor loads under the IBC or IRC?
Yes No Not necessary for this project t/
12. Does the plan include a building section drawing indicating foundation, wall, floor, and
roof cons ction?
Yes t No Not necessary for this project
13. Is the windspeed and exposure design included in the plan?
Yes No Not necessary for this project
14. Does the building section drawing include size and spacing of floor joists, wall studs,
ceiling jo' ts, roof rafters or joists or trusses?
Yes ,/ No Not necessary for this project
3
15. Does the building section drawing or other detail include the method of positive
connection of all columns and beams?
Yes ✓ No Not necessary for this project
16. Does the elevation plan indicate the height of the building or proposed addition from the
undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or
the topof flat roof? (Check applicable zone district for building height maximum)
Yes V No Not necessary for this project
17. Does the plan include any stove or zero clearance fireplace planned for installation
including make and model and Colorado Phase II certifications or Phase II EPA
certification?
Yes No Not necessary for this project ✓
18. Does the plan include a masonry fireplace including a fireplace section indicating design
to comply with the IBC or IRC?
Yes No Not necessary for this project
19. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the IBC or IRC?
Yes No Not necessary for this project ✓
20. Does the plan include a window schedule or other verification that windows provide
natural light and ventilation for all habitable rooms?
Yes No Not necessary for this project
21. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally
used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub
enclosures nd specify safety glazing for these areas?
Yes No Not necessary for this project
22. Do the plans include a complete design for all mechanical systems planned for
installation in this building?
Yes No Not necessary for this project
23. Have all areas in the building been accurately identified for the intended use?
(Occupancy s identified in the IBC Chapter 3)
Yes No Not necessary for this project
24. Does the plan indicate the quantity, form, use and storage of any 1}azardous materials that
may be in use in this building?
Yes No Not necessary for this project
4
25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes No Not necessary for this project
26. Do the plans indicate the location and dimension of restroom facilities and if more than
four employees and both sexes are employed, facilities for both sexes?
Yes No Not necessary for this project C/
27. Do the plans indicate that restrooms and access to the building are handicapped
accessible?
Yes No Not necessary for this project
28. Have two (2) complete sets of construction drawings been submitted with the
applicatio
Yes No
29. Have you designed or had this plan designed while considering building and other
constructio code requirements?
Yes t� No Not necessary for this project
30. Does the plan accurately indicate what you intend to construct and what will receive a
final inspe tion by the Garfield County Building Department?
Yes No
31. Do your plans comply with all zoning rules and regulations in the County related to your
zone district? For corner lots see supplemental section 5.05.03 in the Garfield County
Zoning Re olution for setbacks.
Yes tiNo
32. Do you understand that approval for design and/or construction changes are required
prior tot implementation of these changes?
Yes No
33. Do you understand that the Building Department will collect a "Plan Review" fee from
you at the time of application and that you will be required to pay the "Permit" fee as well
as any "Septic System" or "Road Impact" fees required, at the time you pick up your
building}ermit?
Yes ,/ No
34. Are you aware that you are required to call for all inspections required under the 113C
including approval on a final inspection prior to receiving a Certificate of Occupancy
and occupancy of the building?
5
Yes / No
35. Are you aware that the Permit Application must be signed by the Owner or a written
authority be given for an Agent and that the party responsible for the project must comply
with the U form Codes?
Yes :/ No
36. Are you aware that you must call in for an inspection by 3:30 the business day
> before the requested inspection in order to receive it the following business day?
Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday.
Inspections are to be called in to 384-5003.
37. Are you aware that requesting inspections on work that is not ready or not accessible
will result in a $50.00 re -inspection fee?
Yes ✓ No
38. Are you aware that prior to issuance of a building permit you are required to show proof
of a driveway access permit or obtain a statement from the Garfield County Road &
Bridge Department stating one is not necessary? You can contact the Road & Bridge
Department t 625-8601.
Yes V No
39. Do you understand that you will be required to hire a State of Colorado Licensed
Electrician and Plumber to perform installations and hookups? The license number will
be required t time of inspection.
Yes No
40. Are you aware, that on the front of the building permit application you will need to fill in
the Parcell Schedule Number for the lot you are applying for this permit on prior to
submittal of the building permit application? Your attention in this is appreciated.
Yes No N fl ,U41
41. Do you know that the local fire d' trict may require you to submit plans for their review
of fire safety issues? Yes No (Please check with the
building department about this requirement)
6
42. Do you understand that if you are planning on doing any excavating or grading to the
property prior to issuance of a building permit that you will be required to obtain a
grading permit?
Yes
S
I hereby acknowledge that I have read, understand, and answered these questions to
the best of my ability.
id/AA, 0/0.3 -
Date
`r Lure
Phone: (97a) 026- Y,Z(days); (9 70) I'3 - 4/6(t2- (evenings)
Project Name: A 14 frei Poe4-1- �'nw1l sso r S7e1-0'41
Project Address: a ' A rr1, )e -s last 6 { tk11' 81 0k. 174-)Y
i/2 ori//e /1/0r1-1,-, eel ism �,( Pori, f Roy
Note:
If you answered "No" on any of these questions you maybe required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in
issuing the permit are to be expected. Work may not proceed without the issuance of the permit.
*If you have answered "Not necessary for this project" on any of the questions and it is
determined by the Building Official that the information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, please expect the
following:
A. The application may be placed behind more recent applications for building permits in the
review process and not reviewed until required information has been provided and the
application rotates again to first position for review.
B. Delay in issuance of the permit.
C. Delay in proceeding with construction.
*If you answered "No" to this question the circumstances described in the question could result
in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued.
Bpcomm
Feb2005
7
PLAN REVIEW CHECKLIST
Applicant (Li (c_cA )
Building
Engineered Foundation
W. Driveway Permit
ree Surveyed Site Plan •
x`
A4 Septic Permit and Setbacks
(.�Grade/Topography 30%
/O -..Attach Residential Plan Review List
Minimum Application Questionnaire
,Y(6 Subdivision Plat Notes
td. Fire Department Review
aluation Determination/Fees
c�Ited Line Plans/Stamps/Sticker
—Attach Conditions
,./Application Signed
/Plan Reviewer To Sign Application
Parcel/Schedule No.
40# Snowload Letter- Manf. Hms.
GENERAL NOTES:
Date /fr/
Planning/Zoning
Property Line Setbacks
1-'10ft Stream Setbacks
•.--"Flood Plain
✓Building Height
4/coning Sign -off
vlroad Impact Fees
—1IOA/DRC Approval
vbrade/Topography 40%
L.—Planning Issues
Subdivision Plat Notes
10/21/2005 09:30 FAX 970 242 5330
TPI
Lj 001/002
Date
/Odor
Number of pages including cover sheet
To:
4,4
Phone
Fax Phone
CC.
?7Q 3Vm
From:
Phone
Fax Phone
(970) 243-4642
(970) 242-5330
REM RkS:
Urgen t
❑ For your review
„Sf71e p4'-,
Reply ASAP
❑ Please comment
RECEIVED
OCT 2 1 2005
GARFIELD COUNTY
BUILDING & PLANNING
�1pF
r.�
,' fn
1yI.
i '�1 ;
'.'�-`t.i`•`;�,
rt
s' F��f�I�
'�f-
-I1�I� ',a
IIH
.�au
l-
1 t" 1,-In�Ii
q'r��lr'E�
a,Ih'
ji�t1���h
1r �
�.
{�I(,
.�r
r 1n4t
.,�P{ o'1 �I%A!1
ir.a_0i 8
f41
�'
a
,4..
fry�;ir,l
Date
/Odor
Number of pages including cover sheet
To:
4,4
Phone
Fax Phone
CC.
?7Q 3Vm
From:
Phone
Fax Phone
(970) 243-4642
(970) 242-5330
REM RkS:
Urgen t
❑ For your review
„Sf71e p4'-,
Reply ASAP
❑ Please comment
RECEIVED
OCT 2 1 2005
GARFIELD COUNTY
BUILDING & PLANNING
10/21/2005 09:30 FAX 970 242 5330 TPI
IJ002/002
FROM ?KLNICMS_PAPACHSTG & & " " ' " & $ (WED)AUG 17 2005 8:12/ST. 8:11/Na,B842340578 P 2
b
:)
oP-
Garfield County
Building and Planning
108 8th Street Suite 201
Glenwood Springs, CO 81601
970.945.8212
Plan analysis based on
the 2003 International Building Code
Project Number:
Project Name: Compressor Building
Address: Anvil Points
Occupancy: F-1
Construction: Il -B
Date: October 21, 2005
Contractor: TPI
Designer: Moore
Engineer: Cronk
Report By: Andy Schwaller
NOTE: The code items listed in this report are not intended to be a
complete listing of all possible code requirements in the 2003 IBC.
It is a guide to selected sections of the code.
FL
NAME OCC
MAX FLR AREA ALLOWED RATIO STATUS
1 Industrial Area F-1 ok
TOTAL FOR FLOOR
BUILDING TOTAL
-- Sec. 503, 504, 506 and Table 503
PROPERTY DESCRIPTION:
North Side has a property line.
East Side has a property line.
South Side has a property line.
West Side has a property line.
OCC
F-1
6765
6765
6765
- Distance
- Distance
- Distance
- Distance
18083
18083
18083
0.37
0.37
0.37
to property line
to property line
to property line
to property line
EXTERIOR WALL FIRE RATINGS AND OPENING PROTECTION
Sec. 602, Tables 601 and 602, and Sec. 704
NORTH
BRG NON OPNG%
WALL BRG UP/PR
0 -hr 0 -hr NL/NL
EAST
BRG NON OPNG%
WALL BRG UP/PR
0 -hr 0 -hr NL/NL
SOUTH
BRG NON OPNG%
WALL BRG UP/PR
0 -hr 0 -hr NL/NL
ok
ok
ok
200.0
200.0
200.0
200.0
WEST
BRG NON OPNG%
WALL BRG UP/PR
0 -hr 0 -hr NL/NL
Page # 2
Code review for:
Project Id.: Compressor Building
Address: Anvil Points
The exterior walls are required to be of NONCOMBUSTIBLE material.
-- Sec. 602.2
Projections from exterior walls shall be of noncombustible material.
-- Sec. 704.2.1
Exterior walls are required to be fire -rated for exposure to fire:
1. From Both sides when fire separation is 5 feet or less.
2. On the interior side only when separation is greater than 5 feet.
-- Sec. 704.5
up/pr = Maximum percent of openings in the exterior wall.
-- Table 704.8
up - The maximum percent if all openings are unprotected.
pr - The maximum percent if all openings are protected.
If some are protected and some are not, then use formula
in Sec. 704.8
Openings in lhr walls are required to be protected with
3/4 hour assemblies. -- Sec. 704.12 and Sec. 715.4
Openings in walls required to be greater than lhr are required
protected with 1 1/2 hour assemblies. -- Sec. 715.4
NL = No fire protection requirements for openings.
NP = Openings are not permitted in this wall.
Note: Unlimited unprotected openings are allowed in walls not required
to fire-resistant. -- Table 704.8, Note: g.
* = These walls may be required to have a parapet wall 30 inches
above the roofing. The parapet wall is required to have the
same fire rating as the wall and shall have noncombustible faces
for the uppermost 18 inches. -- Sec. 704.11
Exception 1: A parapet wall is not required when the wall is not
required to be fire -resistive.
Exception 3: If roof construction is 2 -hour fire -resistive and
of noncombustible construction, a parapet wall is
not required.
Code review for:
Project Id.: Compressor Building
Address: Anvil Points
FIRE
RESISTANCE RATINGS
MATERIAL
Noncombustible
Noncombustible
Noncombustible
Noncombustible
Noncombustible
Noncombustible
ELEMENT
Structural Frame
Interior Bearing wall
Interior nonbrg wall
Floor/Ceiling Assembly
Roof/Ceiling Assembly
Stairs
Page # 3
FOR BUILDING ELEMENTS Table 601
RATING NOTES
0 hour
0 hour
0 hour Note 5
0 hour
0 hour , 13
None
NOTES:
5. Fire -retardant treated wood shall be permitted in:
A. Nonbearing partitions where the required fire -resistance rating
is two hours or less. -- Sec. 603.1, 1.1
Partitions dividing portions of stores, offices or similar places
occupied by one tenant only and do not establish a corridor or serve
an occupant load of 30 or more may be:
A. constructed of fire retardant treated wood
B. one hour fire resistive construction
C. wood panels or similar up to six feet in height.
- - Sec. 603.1, Exception 8
13. Fire -retardant -treated wood shall be allowed in buildings
including girders and trusses as part of the roof construction.
- - Table 601, c.3.
EXIT REQUIREMENTS:
FL NAME
NUMB MIN MIN PANIC CORRIDOR DOOR NOTES
OCC EXITS WIDTH HDWR RATING SWING
1 Industrial Area
TOTAL FOR FLOOR
68 2 13.6
68 2 13.6
No N/A
No N/A
Out 1
Out
FOOTNOTES:
1. Two exits are required from this area since the occupant load exceeds
allowable in Table 1014.1
Page # 4
Code review for:
Project Id.: Compressor Building
Address: Anvil Points
NOTES FOR EXIT TABLE
Door swing is based on Section 1008.1.2
Occupant load is based on .Section 1004 and Table 1004.1.2
Exit width is in inches and based on Section 1005.1 & Table 1005.1
Width shown for
Width shown for
Width shown for
For the minimum
For the minimum
For the minimum
all areas is based on other egress components.
1st floor is based on other egress components.
other floors & basements is based on stairways.
width of doors, see Section 1008.1.1.
width of corridors, see Section 1016.2.
width of stairways, see Section 1009.1.
Exits shall be continuous from the point of entry into the exit to
the exit discharge. -- Sec. 1003.6
EXIT SEPARATION
In areas where 2 exits are required, the minimum separation is 1/2 of
the maximum diagonal of the area or floor measured in a straight line
between exits or exit access doorways.-- Sec. 1014.2.1
Multiple means of egress shall be sized such that the loss of any one
means of egress shall not reduce the available capacity by more than
50 percent. -- Sec. 1005.1
EXIT SIGNS
Exits and exit access doors shall be marked by an approved exit sign.
Signs shall be placed where the exit or the path of egress travel is not
immediately visible. No point to be more than 100 feet from an exit sign.
- - Sec. 1011.1
Exception 1: Exit signs are not required in rooms or areas which require
only one exit.
Exception 2: Main exterior exit doors which obviously and clearly are
identifiable as exits need not be signed when approved.
Exit signs shall be internally or externally illuminated.
- - Sec. 1011.2
Exit sign shall be illuminated at all times including during loss of
primary power. -- Sec. 1011.4 & Sec. 1011.5.3
BOLT LOCKS:
Manually operated flush bolts and surface bolts are not permitted.
-- Sec. 1008.1.8.4
Exception 2: Where a pair of doors serves a storage or equipment room,
manually operated edge- or surface -mounted bolts are
permitted on the inactive leaf.
LOCKS AND LATCHES:
Egress doors shall be readily openable from the egress side without the
use of a key or any special knowledge or effort. -- Sec. 1008.1.8
Page # 5
Code review for:
Project Id.: Compressor Building
Address: Anvil Points
Locks and latches shall be permitted to prevent operation where any
of the following exists:
Exception 2: The main door or doors in Group B, F, M and S areas are
permitted to be equipped with key operating locking devices
from the egress side provided:
2.1 The locking device is readily distinguishable as locked.
2.2 A readily visible durable sign is posted on the egress
side stating: THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING
IS OCCUPIED
Exception 3: Where egress doors are used in pairs, automatic flush bolts
shall be permitted to be used, provided the door leaf having
the automatic flush bolts has no doorknob or surface -mounted
hardware.
ADDITIONAL DOORS:
Where additional doors are provided for egress purposes, they
shall conform to the requirements in Section 1008.1
LANDINGS AT DOORS:
1. There shall be a floor or landing on each side of a door.
-- Sec. 1008.1.4
2. Such floor or landing shall be at the same elevation on each
side of the door. -- Sec. 1008.1.4
3. The floor or landing shall not be more than 1/2 inch lower than the
threshold. -- Sec. 1008.1.6
4. Landings shall have a width not less than the width of the stairway
or width of the doorway, whichever is the greater. Where a landing
serves an occupant load of 50 or more, doors in any position shall
not reduce the landing dimension to less than one half it required
width. The minimum length in the direction of exit travel is 44
inches. -- Sec. 1008.1.5
5. The space between two doors in series shall be 48 inches plus the
width of door swinging into the space. -- Sec. 1008.1.7
EXIT ACCESS TRAVEL DISTANCE:
The maximum travel distance in Group Fl is 200 feet. -- Table 1015.1
ROOFING REQUIREMENTS:
1. The roofing on this building is required to be Class C. -- Table 1505.1
Page # 6
Code review for:
Project Id.: Compressor Building
Address: Anvil Points
LIGHT AND VENTILATION
1. Every space intended for human occupancy shall be provided with
natural light. The minimum net glazed area shall not be less than
8% of the floor area. -- Sec. 1205.1 and 1205.2
Any room is permitted to be considered as a portion of an adjoining
room where one half of the area of the common wall is open and
unobstructed and provided not less than one tenth of the floor area
or 25 square feet, whichever is greater. -- Sec. 1205.2.1
Artificial light shall be provided that is adequate to provide an
average illumination of 10 foot candles over the area of the room
at a height of 30 inches above the floor. -- Sec. 1205.3
2. Natural ventilation of an occupied space shall be through windows,
doors, louvers or other openings to the outdoors. -- Sec. 1203.4
The minimum operable area to the outdoors shall be 4 percent of the
floor area. -- Sec. 1203.4.1
Any room is permitted to be considered as a portion of an adjoining
room where unobstructed openings are provided that have an area not
less than 8% of the floor area of the interior room but no less than
25 square feet. -- Sec. 1202.3.1.1
When openings are below grade, clear space measured perpendicular to
the opening shall be one and one half times the depth of the opening.
-- Sec. 1203.4.1.2
3. Rooms containing bathtubs, showers, spas and similar bathing fixtures
shall be mechanically ventilated. -- Sec. 1203.4.2.1
CEILING HEIGHTS:
Occupiable spaces, habitable spaces and corridors shall have a ceiling
height of not less than 7 feet 6 inches. Bathrooms, toilet rooms,
kitchens, storage rooms and laundry rooms shall be permitted to have a
ceiling height of not less than 7 feet. -- Sec. 1208.2
Page # 7
Code review for:
Project Id.: Compressor Building
Address: Anvil Points
GLAZING REQUIREMENTS
All glazing in hazardous locations is required to be of safety
glazing material. -- Sec. 2406.1
Locations: -- Sec. 2406.3
1. Glazing in swinging doors except jalousies.
2. Glazing in fixed and sliding panels of sliding patio door assemblies
and panels in sliding and.bifold closet door assemblies.
3. Glazing in storm doors.
4. Glazing in all unframed swinging doors.
5. Glazing in doors and enclosures for hot tubs, whirlpools, saunas,
steam rooms, bathtubs and showers. Glazing in any portion of a
building wall enclosing these compartments where the bottom exposed
edge of the glazing is less than 60 inches above a standing surface.
6. Glazing in fixed or operable panels adjacent to a door where the
nearest exposed edge of the glazing is within a 24 -inch arc of
either vertical edge of the door in a closed position and where the
bottom exposed edge of the glazing is less than 60 inches above the
walking surface.
Exception: Panels where there is an intervening wall or other
permanent barrier between the door and glazing.
7. Glazing in an individual fixed or operable panel, other than those
locations described in items 5 and 6 above, than meets all of the
following conditions:
7.1 Exposed area of an individual pane greater than 9 square feet.
7.2 Exposed bottom edge less than 18 inches above the floor.
7.3 Exposed top edge greater than 36 inches above the floor.
7.4 One or more walking surfaces within 36 inches horizontally of
the plane of the glazing.
See Exceptions.
8. Glazing in guards and railings regardless of the area or height
above a walking surface.
9. Glazing in walls and fences enclosing indoor and outdoor swimming
pools, hot tubs and spas where all of the following are present:
9.1 The bottom edges of the glazing on the pool or spa side is
less than 60 inches above the walking surface.
9.2 The glazing is within 60 inches of the water's edge.
10. Glazing adjacent to stairways, landings and ramps within 36 inches
horizontally of a walking surface when the glass is less than 60
inches above the plane of the walking surface.
11. Glazing adjacent to stairways within 60 inches horizontally of the
bottom tread of a stairway in any direction when the exposed glass
is less than 60 inches above the nose of the tread.
See Exceptions.
Sep 1I UI 1U:Ila Ioni mutton
Division of Registrations
Colorado The Official Stale Web Portal
Division of Registrations
View Permit 625903
Requestor
Site
.;/ I LI4-1.4I J Y'4 -
Page 1 oft
Electrical and Plumbing Permits Online
Company Name:
First Name:
Last Name:
Address:
City:
State:
Zipcode:
Phone:
Fax:
Email Address:
License Number:
Property Type:
Property Owner
Job Site Address:
City:
State:
Zipcode:
County:
Power:
Building Type:
Construction Type:
Misc Construction:
Cost of Materials / Labor $:
Trim:
FRONTIER ELECTRIC
DANIEL
HUTTON
PO BOX 95
DEBEQUE
CO
81630
(970) 283-8621
(970) 283-5219
frontier elec@yahoo.corn
6087
PRIVATE
WILLIAMS PRODUCTION
SW OF NW QTR - SESCTION 20 = TOWNSHIP 6 S N -
RIFLE
CO
81650
GARFIELD
XCEL - RIFLE
COMMERCIAL
NEW
COMMERCIAL NEW
8000
N
/4;2.4/1/i/
ailypEca04.51-/R1
inspections
Inspected Date
Type
Status
091i2/2091
FINAL
ACCEPTED
08/23/2097
FINAL
REJECTED
StatusiActions
Permit Number:
Type:
Status:
Opened:
Expiration Date:
Closed:
625903
ELECTRICAL
CLOSED
08/1612007
08/16/2008
09/13/2007
'Ittps://www.dora.state.co.us/nIs/real//n wPll nprmit mui chnisr —1 Cs,7 Lt
(1 el •71n neon
perm i
CCGRONK
CONSTRUCTION
INCORPORATED
7q
1129 .24. Road
Grand Junction, CO 81505
9704245.0577, 910.257.7453 (fax)
June 22 2007
111 Industrial
2471 River Rood, Unit A
Grand Junction, CO 8150.5
970-243-4642 (wk), 970-242.5330 (far;)
Concerning; erection of.slee! stntcture far A tsStation. Parachute. C"Ci 81635
The erection of the steel strus;turc and crane at the abo.. a referenced project WaN inspected by Tam A., Crank
(registeredprofessional engineer -1t„P ;.) on 06/18107. The structurehas been erected in accordance with
the structural steel pians furnished by the manufacturer,
Picase call. ii you ha have iidditiuntil questions cctrteerning this issue, Thank you.
SEAL.
r
Thomas A. Crank, Crrlar rdo License Na, 28322
Dale
L_ r
PAGE 1 O 1
No. ,q4 !
Job Address ( /!
Owner,(.
Contractor 7Pj-
;ttr1�{Ur {�Orr� J `�
Atssessor's Parcel No 21��-332-�-olq
‘i,64'‘i,64'‘i,64'v`"-"r'"i reed On rf�-f•
Date r t(013/0 s
Setbacks: Front
BUI INQ PE=ARD
RM7" Address/05g C ts' /• 6 MAone# S -9'39'J
Addressa`F`l( di,•gsPh ne #, D'aCo3- S4
Rear RH LH Zoning
Soils Test
Footing 1,'�---i4 -o5AN&.
Foundation
Grout
Underground Plumbing
Rough Plumbing
Framing
Insulation
Roofing
Drywall
Gas Piping
EXTERIOR
Address No.
Drainage
Decks -support & clearance to wood
Decks -stairs & rails
Exterior locks
Flashing around doors & windows
Insect screens
INTERIOR
GARAGE
Fire wall separation
Service doors -13/8" min
Door (20 min.) wlauto closer -1%" min
Mech. equip. 18" above floor
No opening into sleeping area
BASEMENT -CRAWL AREA
Access
Insulation
H p
eadrodroomlSteirs /!V
Ventilation
INSPECTIONS
Weatherproofing
Mechanical
Electrical Rough (State)
Electrical Final (State)
Final/0 •-3-L21 /Checklist Cam I ted? b(
Certificate Occupancy # ��2
Date 1b "C). -1D -4 -
Septic
-c -
Septic System # /4 -9/14 -
Date
Final
Other
NOTES
FINAL CHECKLIST
MECHANICAL ROOM
Boiler
Hot water
F.A. gas/oil
Floor drain
Clearance
Air con. system_
Hot water heater
Combustion air
Gas piping, valves
LPG Drain
FIREPLACE/STOVE
Clearance to combustibles
Termination of chimney
Combustion air
(continue on back)
STAIRWAYS .
Headroom (6'6")
Railing & guardrails _
Width
Rise & run
KITCHEN
Clearance above grill
Exhaust fan
Broiler exhaust (1 hr. chase)
BEDROOMS
Egress
Smoke detector
BATHROOMS
Exhaust fan
Shatterproof glass
Hearth (12" or 20" on sides) OTHER
Glass doors
Certified by:
REMARKS
INSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORAD
Date Issued Al$)310 Zoned Area Permit No I tit?'
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Ins ctor and IMMEDIATELY BECOM VUL AND VOID.
X110 a4 (�t -- �
Address or Legal Descriptio1 ,81" 1 14, O.. 0' Any, ( fA& Rd,
Setb&k Front Side Side_ Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing i )-ii-03—
Y
Driveway
Foundationcykifr4g.24-6,,,tr„G;rjtot .
Underground Plumbing
Insulation
Rough Plumbing
Drywall
Chimney & Vent
Electric Final (by State Inspector)
Gas Piping
Final lv , 3 4) (1 4.4 it
Electric Rough (By State Inspector)
Septic Final
Framing 5Fra t4
(To include Roof in place and Windows
and Doors installed).
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
For Inspections Call 384-5003 108 8th Street Glenwood Springs, Colorado
APPROVE - DO NOT DESTROY THIS CARD
Date!' a By
IF PLACED OUTSIDE t COVER WITH CLEAR PLASTIC
Garfield County
Building & Sanitation Department
108 8th Street, Suite #201 Glenwood Springs, Co, 81601
Office- 945-8212 Inspection Line- 384-5003
sz,..0 p„cfc.Q3
neta„,;d2)
/-�-.
Job Address Yo2 4/l t
NO. C?Ll
`
Nature of Work Building Permit
Use of Building1/6143\ 2/W -�- - 4444 ALt-tut.
iQ
Owner , ,,nf
44&QO
Contractor
----4
Amount of Permit S F . !'7 Date 19,3
dO)
Clerk
c'